CC_2025_10_06_AGENDATHE CITY OF LAKE FOREST
CITY COUNCIL AGENDA
Monday, October 6, 2025
220 E. Deerpath
Lake Forest, IL 60045
CALL TO ORDER AND ROLL CALL 6:30pm
Honorable Mayor, Stanford R. Tack
Nancy Novit, Alderman First Ward Alice Levert, Alderman Third Ward
Peter Clemens, Alderman First Ward Nick Bothfeld, Alderman Third Ward
Edward U. Notz, Jr., Alderman Second Ward Eileen Looby Weber, Alderman Fourth Ward
John Powers, Alderman Second Ward Richard Walther, Alderman Fourth Ward
PLEDGE OF ALLEGIANCE
REPORTS OF CITY OFFICERS
1. COMMENTS BY MAYOR
A. Introduction of Mayor for a Day, Margot McCampbell
B. 2025-2026 Board & Commission Appointments and Reappointments
ZONING BOARD OF APPEALS
NAME OF MEMBER APPOINT/REAPPOINT WARD
Jay Soave APPOINT 2
Patrick Marshall APPOINT 1
CEMETERY COMMISSION
NAME OF MEMBER APPOINT/REAPPOINT WARD
Debbie Saran APPOINT 4
AUDIT COMMITTEE
NAME OF MEMBER APPOINT/REAPPOINT WARD
Josh Knauff APPOINT 1
A copy of the volunteer profile sheet is available at City Hall upon request.
COUNCIL ACTION: Approve the Mayor’s Appointments and Reappointments
Monday, October 6, 2025 City Council Agenda
2. COMMENTS BY CITY MANAGER
A. Community Spotlight
- Lake Forest Library
- Ishwar Laxminarayan, Director
B. CBD Parking Evaluation Update
- Keri Kaup, Assistant to the City Manager
3. OPPORTUNITY FOR CITIZENS TO ADDRESS THE CITY COUNCIL
4. COMMITTEE REPORTS
5. ITEMS FOR OMNIBUS VOTE CONSIDERATION
1. Approval of the Monday, September 15 City Council Meeting Minutes
A copy of the minutes begins on page 22
COUNCIL ACTION: Approval of the Monday, September 15 City Council Meeting Minutes
2. Approval of the Check Register for the Period of September 1 – September 19, 2025.
STAFF CONTACT: Jamese Scott, Staff Accountant (847-810-3618)
BACKGROUND/DISCUSSION: City Code Section 38.02 sets forth payment procedures of the
City. The Director of Finance is to prepare a monthly summary of all warrants to be drawn on
the City treasury for the payment of all sums due from the City (including all warrants relating
to payroll and invoice payments) by fund and shall prepare a detailed list of invoice payments
which denotes the person to whom the warrant is payable. The warrant list detail of invoice
payments shall be presented for review to the Chairperson of the City Council Finance
Committee for review and recommendation. All items on the warrant list detail
recommended for payment by the Finance Committee Chairperson shall be presented in
summary form to the City Council for approval or ratification. Any member of the City Council
shall, upon request to the City Manager or Director of Finance, receive a copy of the warrant
list detail as recommended by the Finance Committee Chairperson. The City Council may
approve the warrant list as so recommended by the Finance Committee Chairperson by a
concurrence of the majority of the City Council as recorded through a roll call vote.
The Council action requested is to ratify the payments as summarized below. The associated
payroll and invoice payments have been released during the check register period noted.
Monday, October 6, 2025 City Council Agenda
Following is the summary of warrants as recommended by the Finance Committee
Chairperson:
Included in the subtotal denoted as “All other Funds” is $288,909 in Water & Sewer Capital
Improvement Fund expenditures.
COUNCIL ACTION: Approval of the Check Register for the Period of September 1 – September
19, 2025.
3. Approval of Lake Forest Police Held Cash Bank Account and a Resolution
Establishing Authorized Signers for the Account
STAFF CONTACT: Diane Hall, Assistant Finance Director (847-810-3614)
PURPOSE AND ACTION REQUESTED: Staff requests approval of the establishment of a new bank
account for cash held by the Police Department and a resolution authorizing signers for the
account.
BACKGROUND/DISCUSSION: Pursuant to a review of current police processes regarding cash
held awaiting transfer to the Illinois State Police for processing or to be returned to the proper
owner of the funds, it was identified that a separate bank account would create efficiencies
for the process. To account for the funds, a separate bank account is required. Lake Forest
Bank and Trust Company requires a resolution be approved by the City Council to establish
the account and authorize signers on the account.
Lake Forest Bank &
Trust – LF Police
Fund Invoice Payroll Total
101 General 770,428 1,069,888 1,840,317
501 Water & Sewer 97,482 130,163 227,645
220 Parks & Recreation 197,757 265,676 463,433
311 Capital Improvements 720,582 720,582
202 Motor Fuel Tax 0
230 Cemetery 7,606 30,019 37,625
210 Senior Resources 13,559 24,612 38,171
510 Deerpath Golf Course 3,132 1,541 4,673
601 Fleet 32,775 37,061 69,836
416 - 434 Debt Funds 475 475
248 Housing Trust 0
201 Park & Public Land 234,644 234,644
All other Funds 696,984 141,135 838,119
$2,775,424 $1,700,096 $4,475,520
Check Register for September 1st - September 19th, 2025
Monday, October 6, 2025 City Council Agenda
Diane Hall
Mark Krygeris
Jamese Scott
BUDGET/FISCAL IMPACT: N/A. There is no fiscal impact of this action.
COUNCIL ACTION Approval of Lake Forest Police Held Cash Bank Account and a Resolution
Establishing Authorized Signers for the Account
4. Consideration of a Request to Waive the Fidelity Bond Requirement in Connection
with Holding the Raffles in the City of Lake Forest for the Women’s Board of
Northwestern Medicine Lake Forest Hospital (Approval by Motion)
STAFF CONTACT: Margaret Boyer, City Clerk (847.810.3674)
PURPOSE AND ACTION REQUESTED: Staff requests City Council consideration of waiving the
fidelity bond requirement in connection with a proposed raffles from the Women’s Board of
Northwestern Medicine Lake Forest Hospital.
BACKGROUND: In January 2020 the City Council approved an Ordinance Amending Chapter
110, titled “Licenses and Miscellaneous” related to Raffles, to align these sections with recent
State of Illinois Legislation. Section 110.0149, J, allows the raffle manager designated by the
organization to seek a waiver of the bond requirement from the City Council.
At this time the Women’s Board of Northwestern Medicine Lake Forest Hospital
is requesting a waiver of the bond requirement and has submitted a request. A copy of the
request can be found beginning on page 26
BUDGET/FISCAL IMPACT: N/A
COUNCIL ACTION: Consideration of a Request to Waive the Fidelity Bond Requirement in
Connection with Holding a Raffle in the City of Lake Forest for the Women’s Board of
Northwestern Medicine Lake Forest Hospital Approval by Motion).
5. Consideration of a Waiver of Plan Review, Permit, and Inspection Fees for a Project
on City Owned Property, the Gorton Center, 400 Illinois Road, in the Amount of
$6,270.00. (Approval by Motion)
STAFF CONTACT: Catherine Czerniak
Director of Community Development (810-3504)
Monday, October 6, 2025 City Council Agenda
PURPOSE AND ACTION REQUESTED: As provided for in the City’s Administrative Directives, 3 – 7,
City Council approval is required for the waiver of fees in excess of $5,000.
BACKGROUND/DISCUSSION: A waiver of fees related to the terrace replacement project at
Gorton Center is requested. This is a City initiated project to address deterioration of the
existing terrace located at the northwest corner of the Gorton building. Drainage issues near
the terrace will be addressed as part of the project. The new terrace is slightly larger than the
existing terrace and was previously reviewed and approved by the Historic Preservation
Commission at a public meeting.
BUDGET/FISCAL IMPACT: No impact. Permit fees are routinely waived for City projects.
Waiver Requested
$6,270.00 $6,270.00
COUNCIL ACTION: If desired by the City Council, by motion, approve a waiver of plan review,
permit, and inspection fees for a project on City owned property, the Gorton Center, 400
Illinois Road, in the amount of $6,270.00.
6. Consideration of a Waiver of Plan Review, Permit, and Inspection Fees for Life Safety
Upgrades at Lake Forest High School, 1285 McKinley Road, in the Amount of
$29,086.30. (Approval by Motion)
STAFF CONTACT: Catherine Czerniak
Director of Community Development (810-3504)
PURPOSE AND ACTION REQUESTED: As provided for in the City’s Administrative Directives, 3 – 7,
City Council approval is required for the waiver of fees in excess of $5,000.
BACKGROUND/DISCUSSION: A waiver of fees related to planned upgrades to the life safety
systems at Lake Forest High School is requested. The life safety upgrades will be school-wide,
extending through the entire building, updating existing systems with new technology. These
improvements will benefit students, teachers, and staff.
BUDGET/FISCAL IMPACT: Minimal impact. School District 115 serves the Lake Forest community
and immediate neighbors. Fees related to development and upgrades to existing buildings
are routinely waived for community partners.
Waiver Requested
$29,086.30 $29,086.30
Monday, October 6, 2025 City Council Agenda
COUNCIL ACTION: If desired by the City Council, by motion, approve a waiver of plan review,
permit, and inspection fees for life safety upgrades at Lake Forest High School, 1285 McKinley
Road, in the amount of $29,086.30.
7. Approval of Veeam Backup and Recovery annual maintenance for fiscal year 2025
from Heartland Business Systems in the amount of $55,750.
STAFF CONTACT: Cameron Burrell, Director of IT (847-810-3598)
PURPOSE AND ACTION REQUESTED: Staff requests approval to expend budgeted funds and
continue maintaining the backup and recovery hardware and software necessary to support
the City’s data infrastructure and security needs.
BACKGROUND/DISCUSSION: The City utilizes Veeam as its disaster recovery backup solution to
safeguard critical data, systems, and applications across all departments. Veeam provides
reliable and secure backup, replication, and recovery capabilities for both on-premise and
cloud-based environments, ensuring business continuity in the event of hardware failure or
cyber incidents.
This annual renewal covers licensing and support services that enable the Innovation &
Technology Department to perform daily backups, conduct disaster recovery testing, and
maintain compliance and insurance requirements. Veeam allows for rapid restoration of
individual files, databases, or full servers, reducing potential downtime and operational
impacts on City services. As part of our monthly charges related to the upkeep of Veeam, we
are required to maintain proper disk space reservation, licensing for the servers, as well as
proper resource allocation for replication.
BUDGET/FISCAL IMPACT: The initial implementation and agreement for Veeam via Heartland
Business Systems was executed on 10/22/2024. Per the agreement, this maintenance can only
be provided by Heartland Business Systems.
Has City staff obtained competitive pricing for proposed goods/services? No
Administrative Directive 3-5, Section 6.1B – Sole Source
FY2025 Funding
Source Account Number Amount
Budgeted
Amount
Requested
Budgeted?
Y/N
IT Operating $81,000 $55,750 Y
COUNCIL ACTION: Approval of Veeam Backup and Recovery annual maintenance for fiscal
year 2025 from Heartland Business Systems in the amount of $55,750.
Monday, October 6, 2025 City Council Agenda
8. Approval of the Purchase of Twenty-Five Patrol Rifles and Associated Patrol Rifle
Safety Equipment in the amount of $48,040.00.
STAFF CONTACT: John Burke, Police Chief (810-3803)
PURPOSE AND ACTION REQUESTED: City staff request City Council approval of the purchase of
twenty-five Colt M4 Patrol Rifles and associated noise mitigation safety equipment, in the
amount of $48,040.00.
BACKGROUND/DISCUSSION: The Lake Forest Police Department is requesting authorization to
purchase twenty-five (25) Colt patrol rifles to replace our aging inventory of duty rifles. The
majority of our current rifles are over fifteen years old and have been in continuous service
throughout that time. While these rifles have served our department well, their age and
extensive use have created increasing concerns regarding reliability and officer safety.
This concern was recently underscored by two catastrophic rifle failures during routine training
on the practice range. Fortunately, no serious injuries occurred; however, both rifles were
deemed unsafe and irreparable following inspection by Precious Metals Gunsmithing of Two
Rivers, Wisconsin. These failures highlight the urgency of replacing the existing inventory to
ensure our officers are properly equipped to respond effectively to critical incidents.
The proposed replacement rifles are Colt patrol rifles, which are widely recognized in law
enforcement for their durability, accuracy, and reliability. Equipping our officers with updated
rifles will not only enhance officer safety but also strengthen the department’s ability to protect
our community in high-risk situations.
BUDGET/FISCAL IMPACT: The total cost of this replacement program is $48,040.00. A large
portion of this purchase will be partially offset by a generous $24,000.00 donation from the
Lake Forest Police Foundation. Their contribution demonstrates strong community support for
this initiative and significantly reduces the financial impact on the City.
Has City staff obtained competitive pricing for proposed goods/services? Yes
City staff sought and obtained competitive pricing from three authorized Colt Firearms Law
Enforcement suppliers. Quotes beginning on page 27
Lou’s Police Distributors $48,040.00
Below is an estimated summary of Project budget:
FY2026 Funding Source
$50,000 $48,040 Y
If approved, City Council approval this evening will allow staff to place the order now to
replace all the police department’s patrol rifles, utilizing both the Police Foundation and City
Monday, October 6, 2025 City Council Agenda
funds to cover the purchase. The actual delivery and subsequent payment of the equipment
will be in the coming months.
COUNCIL ACTION: Approval of the Purchase of Twenty-Five Colt Patrol Rifles with associated
safety equipment in the Amount of $48,040.00 from Lou’s Police Distributors, Inc.
9. Approval of Design Engineering Services for the Walden Lane East Bridge Repairs
Project to GSG Consultants, Inc., and Authorize the City Manager to Execute an
Agreement in the Amount of $85,910 to Include a Contingency in the Amount of
$4,090 for a Total Cost of $90,000
STAFF CONTACT: Byron Kutz, P.E., Superintendent of Engineering (810-3555)
PURPOSE AND ACTION REQUESTED: The Public Works Committee and City staff are requesting
approval of an agreement with GSG Consultants, Inc., (GSG) to provide civil and structural
engineering design services for the Walden Lane East Bridge Repairs project in an amount of
$85,910 with a $4,090 contingency for a total cost of $90,000. In addition, authorization for the
City Manager to execute the Agreement.
BACKGROUND/DISCUSSION: The City’s Bridge Program Manager has identified structural and
ravine issues with the Walden Lane East Bridge in southeast Lake Forest, which crosses the
Walden Ravine. Key problems include stone loss and backfill erosion at the east abutment,
vertical cracks and wall displacement at the west abutment. There are also ravine slope-
repairs necessary adjacent to the abutments which are also included in the work.
Construction is currently shown as Priority-1nf for FY2027.
GSG will provide the civil and structural engineering services which include field visits and
investigation, project design, the development of construction documents, and the
procurement of all the necessary permits.
PROJECT REVIEW/RECOMMENDATIONS:
Reviewed Date Comments
Public Works Committee 9/15/2025 Council Approval of Design
Finance Committee 11/12/2024 Included with FY ’26 Capital Plan
BUDGET/FISCAL IMPACT: The Engineering Section solicited Request for Proposals (RFP) from
professional engineering firms to perform civil and structural engineering design services. 19
firms acquired the RFP package and 4 submitted proposals. The proposals were reviewed by a
committee of staff members.
Has City staff obtained competitive pricing for proposed goods/services? Yes
The following is a summary of the 4 proposals received:
Monday, October 6, 2025 City Council Agenda
Company Name Proposal Amount
GSG $85,910
WJE- Kimley Horn $174,100
BLA $203,090
Atlas $264,224
This is the first project that GSG will be performing for the City. Staff called several references
for similar work and received positive responses.
Below is an estimated summary of the project budget:
FY 2026 Funding Source
$90,000 $90,000 Y
COUNCIL ACTION: Approval of Design Engineering Services for the Walden Lane East Bridge
Repairs Project to GSG Consultants, Inc., and Authorize the City Manager to Execute an
Agreement in the Amount of $85,910 to Include a Contingency in the Amount of $4,090 for a
Total Cost of $90,000
10. Consideration of an Ordinance Approving a Recommendation from the Historic
Preservation Commission in Support of a Building Scale Variance to Allow
Conversion of an Open Porch to a Mudroom and Construction of a New Garage at
1235 Elm Tree Road. (First Reading and if Desired by the City Council, Final
Approval)
STAFF CONTACT: Catherine Czerniak,
Director of Community Development (810-3504)
PURPOSE AND ACTION REQUESTED: The following recommendation from the Historic Preservation
Commission is presented to the City Council for consideration as part of the Omnibus Agenda.
BACKGROUND: 1235 Elm Tree Road – The Commission recommended approval of an
Ordinance granting a building scale variance to allow modest improvements on a significant
historic property. The proposed improvements, conversion of an open side porch into a
mudroom and the addition of a two car detached garage, are intended to provide amenities
that align with today’s lifestyle.
The Historic Preservation Commission has final authority over design related decisions however
City Council action is required when a variance is requested. Public testimony was presented
by the Lake Forest Preservation Foundation in support of the project. (Approved - 5 to 0)
An Ordinance approving a building scale variance for 1235 Elm Tree Road with key exhibits
attached is included in the Council packet beginning on page 33. The Ordinance with complete
exhibits is available for review in the Community Development Department.
Monday, October 6, 2025 City Council Agenda
COUNCIL ACTION: If determined to be appropriate by the City Council, waive first reading
and grant final approval of an Ordinance granting a building scale variance to allow
conversion of an open porch to a mudroom and construction of a new garage at 1235 Elm
Tree Road as recommended by the Historic Preservation Commission.
11. Consideration of an Ordinance Amending the Code Provisions Relating to Drainage
of Swimming Pools and Spas. (Waive First Reading and Grant Final Approval)
Staff Contact: Catherine Czerniak, Director of Community Development
(847-810-3504)
PURPOSE AND ACTION REQUESTED: Consideration of a Code amendment updating the
regulations for draining swimming pools and spas to align with current processes.
BACKGROUND/DISCUSSION: Pools and spas are drained periodically, most often before or
after the summer season. During the drainage process, large volumes of water are
discharged in a short period of time. Current Code provisions direct drainage from swimming
pools to the City’s sanitary sewer system. This approach is no longer supported by the City
because of the limited capacity of sanitary sewer pipes and to reduce the potential for
basement flooding in downstream homes.
The proposed Code amendment requires water discharge from pools and spas to be directed
to the closest storm sewer inlet, road drain, or drainage ditch through a hose with a diameter
of no more than four inches. If an inlet, drain or ditch is not available, water may be
discharged overland on the subject. Prior to draining a pool or spa, water must be
dechlorinated. Dechlorination can occur over time as water is exposed to sunlight or can be
achieved through the treatment of the water with chemicals. The proposed amendment
prohibits drainage when temperatures are below freezing to avoid icing on roads or sidewalks
and provides an opportunity for in season drainage if unanticipated pool repairs are
necessary. The Ordinance is attached beginning on page 41 of the Council packet; the
proposed Code language is highlighted.
If approved, information detailing the process for draining pools and spas will be provided to
residents with pools or spas, included with any permits issued for new pools or spas, and will be
provided to pool maintenance contractors. Information will also be included in an upcoming
Dialogue article and on the City’s website.
COUNCIL ACTION: If desired by the City Council, waive first reading and grant final approval
of an Ordinance amending Section 150.441, Pool Plumbing of the City Code.
COUNCIL ACTION: Approve the eleven (11) Omnibus items as presented
6. OLD BUSINESS
Monday, October 6, 2025 City Council Agenda
1. Consideration to Approve Contracts and Bids for the New Police Station Project, and
Consideration of Additional Project Options.
PRESENTED BY: John Burke, Chief of Police, (847) 810-3803
PURPOSE AND ACTION REQUESTED: City staff will present the contracts and bids for the New
Police Station Project. As explained below, City Council will consider the costs for the base
project and additional project options. Depending on if/what additional options are
preferred, City Council will have the opportunity to consider the approval of contracts and
bids for the New Police Station Project.
BACKGROUND/DISCUSSION: The Lake Forest Police Department currently operates out of the
Public Safety Building on Deerpath, which was constructed in the 1960s as a combined facility
for the Police and Fire Departments. As we look to the future, the current building is not
adequate to meet the space needs of both departments.
As law enforcement has changed over the years, the City has taken creative measures to
adapt and renovate the space to meet the police department’s evolving needs. Despite
several improvements over its 50+ year history, the current building can no longer be adapted
to accommodate modern police practices, technology, training, and equipment. In order to
maintain the highest level of public safety service, the police department needs a new police
station designed to meet the current, and future, needs of police employees and the
community.
The need for an updated and expanded Police Station has been known for many years. In
November 2023, the Council recognized that there may be a unique and limited-time
opportunity to address this need in a forward thinking and financially responsible manner.
As a first step, the Council directed staff to complete initial extensive due diligence.
Options for sites for a new Police Station were inventoried and evaluated. Limited
options were found due to the nearly built out nature of the City and the sensitivity to
community character and potential off site impacts of a Police Station on surrounding
development.
Following the approach successfully taken by other communities, the focus turned to
opportunities for adaptive reuse of existing buildings for primarily three reasons: 1)
significant cost savings achieved by adaptively reusing an existing building as opposed
to building new, and 2) the unprecedented availability of office buildings at below
market prices due to the current office real estate market.
The building at 1925 Field Court in Conway Park was identified as having strong
potential for a future Police Station. Although the building exceeds the square footage
needed for a Police Station, it provides flexibility and opportunities for the future.
In April 2024, the City Council voted unanimously to enter into a Purchase and Sale Agreement
to acquire 1925 Field Court for $3,500,000 (compared to purchase price of $17.5 million in
Monday, October 6, 2025 City Council Agenda
2018) subject to a 90-day due diligence period. During the 90-day due diligence period the
City engaged qualified consultants who completed the following work.
An assessment of the entire building, all components, systems, and the overall site, was
conducted by The Concord Group. Estimates were prepared forecasting repair and
replacement costs over a ten year period for the building and property based on
existing conditions.
An in depth space needs analysis for the Police Department was conducted by FGM
Architects identifying “need to have” and “nice to have” spaces. The directive was to
envision a Police Station that will serve the community for the next 50 years. A range of
cost estimates was prepared for build out of the space.
A Phase 1 Environmental Assessment of the property was completed by Midwest
Environmental Services, Inc.
City staff prepared a high level estimate of annual operating costs for the building and
property.
Preliminary analysis of funding options was completed by the City’s Finance Department
based on the early estimates of the potential cost of improvements needed to
accommodate a new police facility.
On July 15, 2024, the City Council voted unanimously to proceed with the acquisition of 1925
Field Court. In preparation for the closing the following work was completed by City staff in
collaboration with the City Attorney. The City closed on the property on September 17, 2024.
Due diligence was completed on the Title for the property and existing contracts for
services to the property were reviewed and as appropriate, termination dates were
established.
The Conway Park Restrictive Covenants were amended to allow a Police Station use in
the office park subject to the City’s acquisition of the property.
An updated legal survey of the property was completed by Bleck Engineering.
On September 16, 2024 the City Council voted unanimously to award a professional design
services agreement to Cordogan Clark and Associates in the amount of $1,506,660. This
professional design services agreement included:
Preparation of schematic design concepts
Engagement of the Project’s Resident Advisory Group appointed by the City Manager
with Council representation
Design development
Comprehensive cost estimating services
Preparation of construction plans and documents
Monday, October 6, 2025 City Council Agenda
Preparation of bid documents
Over the course of the next 12 months, the full design process was completed.
Previous Project Discussion and Reviews
Reviewed Date Comments
City Council Workshop 9/2/2025 Review of Project Funding Options
City Council 7/7/2025 Project Status Update Presentation
City Council 4/7/2025 Project Status Update Presentation
City Council 3/3/2025 Project Status Update Presentation
City Council 9/16/2024 Reviewed and Approved Project Design
Services Agreement with Cordogan Clark
City Council 7/15/2024 Reviewed and Approved Closing of the
Purchase of the 1925 Field Court Purchase
City Council 4/15/2024 Purchase Sale Agreement, Space Needs
Analysis Services, and Building & Site
The New Police Station Project Resident Advisory Group
The Project Advisory Group appointed by the City Manager met three times over the course of
several months. The Group was charged with advising, challenging, and offering insights to
City staff and the City’s consultants as plans and designs for the Police Station were
developed. Group members were selected to bring expertise in the areas of architecture,
engineering, planning, sustainable design, and knowledge of the practical and operational
aspects of the new station. The Advisory Group provided numerous recommendations to help
achieve the best possible design outcome for the station.
Base Project and Additional Options
The base project includes components such as site excavation and grading and the
renovation of the lower-level parking garage, first floor, and second floor. Additionally, the
base project also includes the construction of the Sally Port addition on the northeast side of
the building. This addition will also contain a newly constructed firing range below.
Monday, October 6, 2025 City Council Agenda
Throughout the design phase for the project, City staff considered the elements that make up
the base project independently from additional project considerations that enrich the quality
building and further supports Police Department operations. These additional items were bid
as alternates and added to the base project, if directed by the Council:
• Complete parking lot resurfacing.
• Emergency Operations Center build out.
• Two additional rooftop HVAC unit replacements. Four total rooftop units, two units are
included in the base project. This replaces the remaining two.
• Patio installation adjacent to lunch/break room.
Construction Management Firm
Given the complexity and the cost of the project, City staff determined it would be best to
engage with a construction management firm to provide professional construction
management services that include public bidding, contract management, and full-time onsite
project managers and superintendents.
On April 2, 2025, a Request for Proposals (RFP) for Project bidding and construction
management services was released by the City, published in the Lake County News Sun, and
posted on the City’s website. In addition, an RFP opportunity announcement was emailed
directly to multiple firms who provide these services. On April 18, 2025, eight firm submittals
were received and a selection committee, comprised of City staff, was formed to review and
evaluate the written responses based on project approach and understanding, project
experience and qualifications, references/project results, and proposed cost. The RFP outlined
that submitted cost proposals were to be developed upon an anticipated $25 million base
construction budget. Further the RFP featured a specific cost proposal template that all firms
had to use to outline their costs. This cost proposal sheet required firms to include their lump
sum fee to complete bidding services, their percentage base fee to be applied to the total
final cost of construction to provide construction management services, any fee adjustments
based on change orders, their monthly general fixed condition costs associated with their
needed project team staffing, and their percentage base fee that is applied to the total cost
of construction to provide their general liability insurance coverage.
Following the evaluation of the written RFP responses, the staff selection team interviewed four
candidate firms. Following the interview process, the staff team unanimously recommended
Cordogan Clark to provide both project bidding and construction management services.
Cordogan Clark has significant experience in successfully providing construction
management services for large scale municipal, commercial, and educational projects.
Additionally, all the fees Cordogan Clark included as part of their detailed cost proposal
submittal were found by staff to be competitive in comparison to the other seven firm
submittals.
Bidding Process
As per our agreement with Cordogan Clark, and following the completion of all design work,
Cordogan Clark prepared the necessary bid packages for the various aspects of the project.
Bids were reviewed and assembled for City staff to evaluate. Project bidding included 15 total
bid packages for each major project trade (plumbing, electric, mechanical, etc.). Staff was
also given all costs related to construction, including construction management fees, general
liability insurance, general fixed conditions (Cordogan Clark supplied superintendents and
Monday, October 6, 2025 City Council Agenda
project managers) and general conditions (construction site expenses such as fencing,
temporary power, etc.).
In addition to the pricing received through the bid process, staff was also given bid pricing for
a few specific items through national government joint purchase co-operatives such as,
Sourcewell. Per Section 6.1D of the City’s Purchasing Directive, purchases can be made via a
variety of governmental joint purchasing programs. Numerous pieces of equipment are bid
nationally, and such bids conform to all requirements of the Illinois State bidding laws.
Sourcewell follows the competitive contracting law process to solicit, evaluate, and award
cooperative purchasing contracts for goods and services. Items that were included in the co-
operative pricing include:
• Groupe Lacasse Furniture in the amount of $731,855 for building furniture (TIPS Co-Op)
• Via Seating in the amount of $29,404 for building furniture (TIPS Co-Op)
• ISCA Processing Solutions in the amount of $6,895 for building furniture (TIPS Co-Op)
• KI Furniture in the amount of $2,015 for building furniture (TIPS Co-Op)
• Bradford Systems in the amount of $330,370 for building lockers, shelving, and lab
equipment (Sourcewell Co-Op)
• Heartland Business Systems in the amount of $180,000 for building IT infrastructure such
as servers, switches, and wireless access points (TIPS Co-Op)
Additionally, City staff are seeking approval for gas main to be installed to support building
assets and operations by North Shore Gas. Currently the building does not feature any gas
utility (100% electric). Installation of a gas main would allow a gas service line to be installed for
the building. Installation of the gas main and ultimately the gas service will allow for some
current electric assets to transition to gas. This is extremely important in offloading a few assets
that need the support of the larger, onsite, generator if a power outage occurs.
One cost item that is not included below is exercise equipment for the new fitness room. Police
Department staff are currently working to fund this component of the project via private
donations.
City staff evaluated all costs for the project have provided a summary chart below for City
Council review.
Summary of Costs
The table below includes costs for the New Police Station (base project) and additional
project options for City Council consideration. City Council could choose to implement some
of the additional options as part of the initial project or could choose to phase work in over
time.
New Police Station – Base Costs Dollar Amount
Monday, October 6, 2025 City Council Agenda
IT Infrastructure (Co-Op Purchase) $180,000
Generator Purchase (previously approved by City Council on
June 16, 2025)
$100,000
North Shore Gas Line Installation $20,000
Total Base Cost: $24,589,016
Base Construction Contingency $1,000,000
Total Base Cost + Contingency $25,589,016
Menu of Project Options Dollar Amount
Complete Parking Lot Resurfacing $152,260
Ballistic Film for All First Floor Windows $267,802
Emergency Operations Center Build Out $200,752
Outdoor Deck Adjacent to Lunchroom $55,000
Two Additional HVAC Rooftop Unit Replacements $646,300
BUDGET/FISCAL IMPACT:
The FY26 Budget includes a $6 million transfer from the General Fund to the Capital Fund to
reduce the long-term financing required for this project. These funds represent a FY25
Operating Surplus of $3.36 million and a drawdown of General Fund Reserves of $2.64 million.
The FY26 Budget also includes a $19 million General Obligation bond issue to be funded from
property taxes. The inclusion of $1 million contingency increases total approval costs by
$589,016, so staff recommend increasing the bond issuance to $19.5 million and funding the
remaining $89,016 out of reserves.
Several debt service models were reviewed at the September 2, 2025, City Council Workshop
and previously at the December 2, 2024, City Council meeting, and November 18, 2024, City
Council meeting. The debt service will have a maximum 15-year maturity to limit the overall
cost of the issuance. Based on current interest rates, the impact to the average Lake Forest
homeowner property tax bill will be $183.86, phased in over three years (based on a $1 million
home value). The 2024 Property Tax levy was increased in anticipation of this issuance and
homeowner’s saw a $55.56 increase in their 2024 Tax Bill. In 2025, the increase would be $60.57
and in 2026, $67.74.
The October 6, 2025 City Council meeting will include an Ordinance providing for the issuance
of the General Obligation bonds. The proposed Ordinance sets the parameters for the bond
sale and allows for reimbursement of any expenses incurred prior to bond issue closing. In the
staff presentation at the meeting, staff will also present the financing structure of the bonds.
With approval of the proposed Ordinance, staff will begin work with the City’s financial
advisory firm and bond counsel to prepare for a bond auction tentatively scheduled for
Monday, October 6, 2025 City Council Agenda
January 20, 2026. Competitive bids will be presented to the Mayor and Finance Committee
Chair prior to acceptance.
To date, City Council has approved $1,506,660 for project design services and the purchase of
a generator for the building in the amount of $100,000.
Has competitive pricing been obtained for proposed goods/services? Yes, to include the
Government Joint Purchasing as previously outlined.
Below is an estimated summary of Project budget:
FY2026 Funding Source
6,000,000 $6,089,016 Yes
(GO Bond Issue Proceeds) 19,00,000 19,500,000 Yes
COUNCIL ACTIONS:
Consideration to approve contracts and bids for the New Police Station Project. The contracts
and bids presented below represent the full cost for the base project plus all additional options
to show the full scope of the project. Council will consider what (if any) additional to include
and the amounts will be adjusted to match that preference. The Council may decide to
consider the approval of these items as an omnibus vote instead of taking separate votes on
each item.
Project Base Approvals
1. Award of Contract to Cordogan Clark for $24,180,847
2. Award of Bid to Groupe Lacasse Furniture in the Amount of $731,855 (TIPS Co-Op)
3. Award of Bid to Via Seating in the Amount of $29,404 (TIPS Co-Op)
4. Award of Bid to ISCA Processing Solutions in the Amount of $6,895 (TIPS Co-Op)
5. Award of Bid to KI Furniture in the Amount of $2,015 (TIPS Co-Op)
6. Award of Bid to Bradford Systems in the Amount of $330,370 (Sourcewell Co-Op)
7. Award of Bid to Heartland Business Systems in the Amount of $180,000 (TIPS Co-Op)
8. Approval of a North Shore Gas Main Installation Agreement in the Amount of $20,000
Total Base Cost: $25,489,016
Project Additional Option Approvals (All amounts to be awarded to Cordogan Clark if
accepted)
1. Complete Parking Lot Resurfacing in the Amount of $152,260
2. Ballistic Film for All First Floor Windows in the Amount of $267,802
3. Emergency Operations Center Build Out in the Amount of $200,752
4. Two Additional HVAC Rooftop Unit Replacements in the Amount of $646,300
5. Outdoor Deck Adjacent to Lunchroom in the Amount of $55,000
Monday, October 6, 2025 City Council Agenda
7. NEW BUSINESS
1. Consideration of an Ordinance providing for the issuance of not to exceed
$19,850,000 General Obligation Bonds of the City of Lake Forest, Lake County, Illinois,
for the purpose of financing capital improvements in and for the City including, but
not limited to, renovation of a building for use as a public safety facility, including
the site work, design and engineering related thereto, providing for the levy and
collection of a direct annual tax sufficient to pay the principal and interest on said
bonds, and authorizing the sale of said bonds to the purchaser thereof. (First
Reading, page 43)
PRESENTED BY: Katie Skibbe, Finance Director (847-810-3612)
PURPOSE AND ACTION REQUESTED: Staff requests that City Council grant approval of the
ordinance authorizing issuance of the general obligation bonds.
BACKGROUND/DISCUSSION: At tonight’s meeting, City Council was presented with the
contracts and bids for the new Police Station. This Ordinance approves the debt financing
required to fund this project.
The sale of the bonds is being approved through a parameters ordinance to provide flexibility
in issuance. The ordinance authorizes the sale of bonds at a future date, as long as certain
parameters are met. This includes the maximum par value, interest rate, and maturity date.
The ordinance also designates certain elected and appointed officials to complete the sale
on behalf of the City Council if the terms of the ordinance are met.
The bonds will have a maximum value of $19,850,000 and a maximum rate of 5% with final
maturity on December 15, 2040. The bonds will be repaid through the property tax levy. The
parameters ordinance was prepared by the City’s bond counsel, Chapman and Cutler, LLP,
and reviewed by our financial advisor, Speer Financial, as well as the City Attorney, Ancel
Glink.
With approval of the proposed Ordinance, staff will work with the City’s financial advisory firm
and bond counsel to prepare for a bond auction. The first draft of the Official Statement will
be completed at the end of October in preparation for the sale, followed by a bond rating
with Moody’s Investor Services in November. The bond sale is tentatively scheduled for
January 20, 2026. Competitive bids will be presented to the Mayor and Finance Committee
Chair prior to acceptance.
PROJECT REVIEW/RECOMMENDATIONS
Monday, October 6, 2025 City Council Agenda
City
Council
9/6/25 Review of project financing options
City
Council
12/2/24 Approval of the 2024 Tax Levy and review of 15-year maturity
options
City
Council
11/18/24 Review of maturity options and options for phasing in debt
City
Council
11/12/24 Capital Budget Workshop — Review of 10 and 15-year maturity
options and estimated tax impacts
BUDGET/FISCAL IMPACT: The interest rate on the bond issue will be determined at the online
bid auction tentatively scheduled for January 20, 2026. Debt service on the bond issue is
scheduled through December 2040 and will be paid from the City's debt service property tax
levy. The bonds will be callable in whole or in part on or after December 15, 2033.
COUNCIL ACTION: Approval of an Ordinance (page XX) providing for the issuance of not to
exceed $19,850,000 General Obligation Bonds of the City of Lake Forest, Lake County, Illinois,
for the purpose of financing capital improvements in and for the City including, but not limited
to, renovation of a building for use as a public safety facility, including the site work, design
and engineering related thereto, providing for the levy and collection of a direct annual tax
sufficient to pay the principal and interest on said bonds, and authorizing the sale of said
bonds to the purchaser thereof. (First reading, page 43)
8. ADDITIONAL ITEMS FOR DISCUSSION/ COMMENTS BY COUNCIL MEMBERS
9. ADJOURNMENT
A copy of the Decision Making Parameters, along with a guide to icons focusing on the Priority
Areas in the Strategic Plan, is included with this agenda, starting on the following page.
Office of the City Manager October 1, 2025
The City of Lake Forest is subject to the requirements of the Americans with Disabilities
Act of 1990. Individuals with disabilities who plan to attend this meeting and who require
certain accommodations in order to allow them to observe and/or participate in this meeting,
or who have questions regarding the accessibility of the meeting or the facilities, are required
to contact City Manager Jason Wicha, at (847) 234-2600 promptly to allow the City to make
reasonable accommodations for those persons.