Loading...
PUBLIC WORKS COMMITTEE 2025/03/03 Packet PUBLIC WORKS COMMITTEE MEETING MONDAY, MARCH 3, 2025 – 5:30 P.M. CITY HALL – UPSTAIRS CITY COUNCIL CONFERENCE ROOM AGENDA I. ROLL CALL/CALL TO ORDER ARA GOSHGARIAN, CHAIRMAN TED NOTZ RICHARD WALTHER II. NEW BUSINESS / ACTION ITEMS 1. APPROVAL OF THE FEBRUARY 3, 2025, PUBLIC WORKS COMMITTEE MEETING MINUTES 2. REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL APPROVAL OF AN IDOT RESOLUTION APPROPRIATING RBI FUNDS FOR PHASE I DESIGN OF THE RINGWOOD BRIDGE REPLACEMENT PROJECT – BYRON KUTZ 3. REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL AWARD OF BID FOR THE FY26 RESURFACING AND PATCHING PROGRAM – BYRON KUTZ III. CIP PROJECT SUMMARY CHART IV. PUBLIC COMMENT V. NEXT MEETING – MARCH 17, 2025 VI. ADJOURNMENT NEW BUSINESS / ACTION ITEM: APPROVAL OF THE FEBRUARY 3, 2025, PUBLIC WORKS COMMITTEE MEETING MINUTES 1 PUBLIC WORKS COMMITTEE MEETING MONDAY, FEBRUARY 3, 2025 – 5:00 P.M. CITY HALL – UPSTAIRS CITY COUNCIL CHAMERS MINUTES I. ROLL CALL/CALL TO ORDER Chairman Ara Goshgarian called the meeting to order at 5:10 P.M. Aldermen Ted Notz and Richard Walther were in attendance. Staff attending the meeting included Byron Kutz, Superintendent of Engineering and Chuck Myers, Superintendent of Parks & Forestry Jim Lockefeer, Assistant Director of Public Works, was also in attendance via phone. II. NEW BUSINESS / ACTION ITEMS 1. APPROVAL OF THE DECEMBER 2, 2024, PUBLIC WORKS COMMITTEE MEETING MINUTES Alderman Notz moved to approve the December 2, 2024, Public Works Committee meeting minutes. Alderman Walther seconded the motion, which carried unanimously. 2. REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL AWARD OF BID FOR THE FY26 MANHOLE LINING AND I&I REPAIR PROJECT – BYRON KUTZ Superintendent Kutz reviewed the below presentation slides on the topic. 2 3 The Committee and City staff discussed public versus private repairs, repair types, and the repair areas. The Committee provided consensus in supporting the staff recommendation to utilize the $175,771 project savings from the Inflow & Infiltration Repairs Project for the annual Sanitary Sewer Lining Program. Alderman Walther moved to recommend to City Council award of the low bid for the 2025 Inflow and Infiltration Repairs to Visu-Sewer, LLC., and authorize the City Manager to execute an agreement in the amount of $261,170 as well as approving a 5% contingency in the amount of $13,059 for a total cost of $274,229. Alderman Notz seconded the motion, which carried unanimously. 3. REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL AWARD OF A PROFESSIONAL DESIGN SERVICES AGREEMENT FOR THE GREEN BAY ROAD WATERMAIN REPLACEMENT PROJECT AND THE BASSWOOD ROAD WATERMAIN REPLACEMENT PROJECT – BYRON KUTZ Superintendent Kutz reviewed the below presentation slide on the topic. 4 The Committee and City staff discussed the proposals received and the location of the current watermain locations in the road/parkway. Alderman Notz moved to recommend to City Council approval of design engineering services for the Green Bay Road Watermain and the Basswood Road Watermain Replacement Projects to the Thomas Engineering Group, and authorize the City Manager to execute an agreement in the amount of $50,016 to include a 5% contingency in the amount of $2,501 for a total cost of $52,517. Alderman Walther seconded the motion, which carried unanimously. 4. REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL AWARD OF A PROFESSIONAL PHASE III DESIGN SERVICES AGREEMENT FOR THE DEERPATH STREETSCAPE PROJECT – JIM LOCKEFEER Assistant Director Lockefeer reviewed the below presentation slides on the topic. 5 The Committee and City staff discussed the proposals received, the total work hours presented in each proposal, the high expectations and level of service needed from the approved firm, and the invoicing and tracking of firm hours. Alderman Walther moved to recommend to City Council approval of a phase III design engineering services agreement for Deerpath Streetscape Project to Thomas Engineering Group in the amount of $435,000 to Include a 5% contingency in the amount of $22,000 for a total cost of $457,000. Alderman Notz seconded the motion, which carried unanimously. III. FY ’25 CIP PROJECT SCHEDULE There were no Committee discussions on this topic. 6 7 IV. PUBLIC COMMENT There was no Public Comment. V. NEXT MEETING Assistant Director Lockefeer explained that the next meeting date would be confirmed via email. VI. ADJOURNMENT Alderman Notz moved to adjourn the meeting of the Public Works Committee at 5:51 P.M. Alderman Walther seconded the motion, which carried unanimously. Respectfully submitted, Jim Lockefeer Jr. Assistant Director of Public Works NEW BUSINESS / ACTION ITEM: REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL APPROVAL OF AN IDOT RESOLUTION APPROPRIATING RBI FUNDS FOR PHASE I DESIGN OF THE RINGWOOD BRIDGE REPLACEMENT PROJECT APPROVAL APPROPRIATING REBUILD ILLINOIS (RBI) FUNDS FOR PHASE I DESIGN SERVICES FOR THE RINGWOOD BRIDGE REPLACEMENT •2022 sufficiency rating of the bridge= 18 (greater than 50 considered satisfactory per Federal guidelines) •City still has 6-9 months prior to bridge alternates being determined •12/2/2024 City Council: Design Agreement and MFT Resolution ($150,000) approved •Original Approved Budget •FY2025 Budget Total $225,000 (Capital $75,000; MFT $150,000) •FY2026 Budget Total $25,000 (Capital) •City has $42,811 RBI Funds unspent (must be obligated by July 1, 2025) •Staff is recommending to swap $42,811 MFT Funds for RBI Funds •MFT funds will stay in City’s bank account for future use APPROVAL APPROPRIATING REBUILD ILLINOIS (RBI) FUNDS FOR PHASE I DESIGN SERVICES FOR THE RINGWOOD BRIDGE REPLACEMENT •Phase I design duration~24 months (Phase I approval soonest is late fall 2026) •Submit ISBP grant October 2025/2026 (ISBP rejection October 2022) •Phase II design (2027/2028) pending grant construction award •Construction (2029/2030) pending grant construction award •Action requested: •PW Committee Recommends Approval of an Illinois Department of Transportation Resolution Appropriating $42,811 in Rebuild Illinois Funds (RBI) Funds to be used for Phase I Design Engineering Services of the Ringwood Bridge Project NEW BUSINESS / ACTION ITEM: REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL AWARD OF BID FOR THE FY26 RESURFACING AND PATCHING PROGRAM 2025 PATCHING & RESURFACING PROJECT 2025 PATCHING & RESURFACING PROJECT •Bid together with Lake Bluff for economies-of-scale •Received four bids- February 20, 2025 (see chart to the right) •FY2026 Budget Summary (Lake Forest only) •Last year: 2 miles of streets resurfaced (total budget $1,000,000) •Proposed: 2.6 miles of streets proposed to be resurfaced (total budget $1,380,000) •Award the resurfacing, patching, and Cemetery at the full budgeted amount •Award the I&I at the as-bid amount (staff recommends $128,260 savings added to sanitary lining program) •Action requested: PW Committee Recommends City Council Award of the Low Bid for the 2025 Patching & Resurfacing Project to Peter Baker & Son Co., and Authorize the City Manager to Execute an Agreement in the Amount Not to Exceed $1,551,740 Contractor Firm Combined Bid Amount* Peter Baker & Son Co.$1,812,158.60 Schroeder Asphalt Services, Inc.$1,888,560.40 Maneval Construction $1,935,255. Brothers Asphalt Paving, Inc.$2,109,226.54 *Lake Forest Sub-Total Only = $1,304,604 Budget Source As-Bid Amount Budgeted Amount Requested Amount Resurfacing $1,121,757 $1,380,000 $1,380,000 Patching $118,255 $100,000 $100,000 I&I (manhole adjustments) Water Fund $21,740 $150,000 $21,740 Cemetery $42,852 $50,000 $50,000 Total $1,304,604 $1,680,000 $1,551,740 CIP PROJECT SUMMARY CHARTS FY ’25 CIP PROJECT SUMMARY CHART FY25 CIP PROJECT SUMMARY CHART – CAPITAL FUND Project Asset Category % Complete Project Timeline Notes Annual Longline Striping Program Road 90%August – Spring 2025 Some FY25 funding is still available. Contractor will return in Spring. Waukegan & Everett Intersection (Land Acquisition)Road 5%2024 City selected for STP-Shared grant for land-acquisition on 12/1/23, coordination is ongoing. Waukegan & Westleigh Intersection (Land Acquisition)Road 98%2024 ROW material provided to both City and School District; coordination and approval process underway.Presented to City Council on 8/5. Westleigh Resurfacing (41-Western) Phase I Design Road 25%TBD CC approved on 7/15/24. Actual road construction was not awarded grant funding but placed on contingency list. Deerpath Intersection Traffic Light/Crossing Improvements Road / Sidewalk 0%June 2025 Recently received one bid over budget. Bid received is being reviewed in detail to see if we can complete some scope in-house. CBD Infrastructure Improvements Evaluation Streetscape 98%November 2024 Second staff coordination meeting with engineering firm occurred on April 9 & May 23; staff has received draft final report; Engineering to review report and provide final comments to consultant. McLennon-Reed Bridge Repairs – Design Bridge 99%Winter 2024 Construction schedule has been changed in order to be timed concurrently with Lake Woodbine. McLennon-Reed Bridge Repairs – Construction Bridge 0%Winter 2026/ Spring 2027 Construction schedule has been changed in order to be timed concurrently with Lake Woodbine. Lake-Woodbine Bridge Reconstruction – Construction Bridge 0%Winter 2026/ Spring 2027 Construction options discussed with the Finance Committee on November 12; awaiting notification of recent grant application to determine next steps. Ringwood Bridge Replacement Phase I Design Bridge 10%2024 – 2025 City Council approved agreement w/ engineering firm to begin Phase I at their December 2nd meeting ADA Transition Plan Facilities / Right of Way / Parks 85%April Facility visits completed. First draft of plan in completed. Staff is working with consulting firm to finalize plan. Highlighted areas represents the project was updated since the February 3, 2025, PW Committee meeting FY25 CIP PROJECT SUMMARY CHART – CAPITAL FUND Project Asset Category % Complete Project Timeline Notes Gorton Community Center Patio & Drop in Center Facility 5%Spring / Summer 2025 3/17/25 PWC review and approval; 4/7/25 CC review and approval. West Park: Tennis Court Construction Parks 0%March – May 2025 CC approved on 11/18/24. Construction anticipated in spring of 2025. Northcroft Park: Handball Courts Installation Parks 0%Spring 2025 Design is complete.Preparing bidding documents. Cemetery Ravine Restoration –Design Ravine 90%May –Spring 2025 Design progressing. Walden Ravine Bed Restoration –Design Ravine 80%May –Summer 2025 Design progressing. Seminary Ravine Improvements Construction Ravine 0%TBD City obtaining approximately $1 million in federal grant funding. Project construction schedule is subject to EPA grant administering timeline. Staff is working with design consultant on grant materials. Ahwahnee Road & Lane Storm Sewer Upgrade Construction Storm Sewer 20%January 2025 – Summer 2025 Construction on Golf Course is substantially complete. Work on Ahwahnee Road will begin week of 3/3 Scott-Wisconsin and Griffith-Woodland Storm Sewer Improvement Design Storm Sewer 70%May – September Seeking PWC review on 4/1/24 and CC bid approval on 4/15/24. Design kickoff meeting was held on 5/6/24. Highlighted projects represents the project was updated since the February 3, 2025, PW Committee meeting FY25 CIP PROJECT SUMMARY CHART – WATER FUND Project Asset Category % Complete Project Timeline Notes Water Meter Replacement Purchase & Installation Water 5%FY25-FY29 PWC approved on 10/21 and CC approved on 11/4 for meter equipment, installation and project management.City’s project engineer reviewing shop drawings and submittals. Watermain Replacements (Field/Spring) & Valve Repairs Water 90%Summer – Fall 2024 PWC reviewed on 5/6/24 and CC bid approval on 5/20/24. Field Court and Spring Lane construction is complete. Highlighted projects represents the project was updated since the February 3,2025, PW Committee meeting FY ’26 CIP PROJECT SUMMARY CHART FY26 CIP PROJECT SUMMARY CHART – CAPITAL FUND Project Asset Category % Complete Project Timeline Notes Annual Pavement Resurfacing & Patching Program Road 0%June – October PWC to review 3/3/25; seek CC approval 3/17/25 Crack Sealing Program Road 0%Fall 2025 PWC to review 4/7/25; seek CC approval 4/21/25 Concrete Streets Repair Road 0%Summer 2025 PWC to review 3/17/25; seek CC approval 4/7/25 Annual Longline Striping Program Road 0%Fall 2025 PWC to review 4/21/25; seek CC approval 5/5/25 Waukegan & Westleigh Intersection Improvements - Construction Engineering Road 0%Summer 2027 PWC to review 12/1/25; seek CC approval 1/19/26 Concrete Sidewalk/Curb Replacement Road / Sidewalk 0%Summer 2025 PWC to review 3/17/25; seek CC approval 4/7/25 Whispering Oaks Sidewalk Connections Sidewalk 0%June – July IDOT bid opening March 7 Deerpath Streetscape – Construction Streetscape 20%January – October Watermain construction progressing with anticipated completion end of March. North Shore gas to complete gas main replacement in March/April. Restoration to occur in April. Streetscape Improvement bid opening to occur March 7. Streetscape Improvement construction is anticipated to begin in mid-May. Extensive communication and business outreach efforts continue. Bank Lane Streetscape Improvements - Design Streetscape 60%January – May Design progressing. PWC to review construction bids 4/21/25; seek CC approval 5/5/25. Construction to begin early/mid-June. McClory Bike Path Resurfacing (Westleigh to Ryan)Bike Path 0%July – August PWC to review 3/17/25; seek CC approval 4/7/25 Walden East Bridge Repairs Design Bridge 0%April – September PWC to review 4/7/25; seek CC approval 4/21/25 FY26 CIP PROJECT SUMMARY CHART – CAPITAL FUND Project Asset Category % Complete Project Timeline Notes Rec Center HVAC RTU Replacements Facility 0%Summer 2025 PWC to review 5/5/25; seek CC approval 5/19/25 Senior Center Air Condenser Replacement Facility 0%Fall 2025 / Winter 2026 Design progressing. Construction bids: PWC to review 7/21/25; seek CC approval 8/4/25 Waveland Park Picnic Shelter Renovation – Construction Park / Facility 0%Late Summer – Fall 2025 Design is currently progressing and anticipated to be completed in late April. Construction bid PWC review 6/2/25; CC bid approval 6/16/25 South Park: Tennis/Basketball Surface Maintenance Parks 0%October PWC to review 4/7/25; seek CC approval 4/21/25 Forest Park: Playground Equipment Replacement Parks 0%September – October PWC to review 4/7/25; seek CC approval 4/21/25 Annual Storm Sewer Lining Program Storm Sewer 0%June PWC to review 4/7/25; seek CC approval 4/21/25 Storm Sewer Design Cherokee: Grandview-Forest Hill Storm Sewer 0%April – September Construction budgeted with FY26 & FY27 funding. PWC to review 3/23/26; seek CC approval 4/6/26 Griffith Woodland Storm Sewer Construction Storm Sewer 0%Spring / Summer 2026 PWC to review 4/7/25; seek CC approval 4/21/25 FY26 CIP PROJECT SUMMARY CHART – WATER FUND Project Asset Category % Complete Project Timeline Notes Water Meter Replacement Purchase & Installation Water 5%FY25-FY29 PWC approved on 10/21 and CC approved on 11/4 for meter equipment, installation and project management. Project expected to begin in January. Green Bay Watermain Replacement Design (Linden-Greenwood)Water 5%February – September PWC reviewed on 2/3/25 and CC approved proposal 2/18/25. Basswood Watermain Replacement Design (Blackthorn-Westleigh)Water 5%February – September PWC reviewed on 2/3/25 and CC approved proposal 2/18/25. Water Plant AHU Coil Replacements Water 0%Summer 2025 PWC to review 4/7/25; seek CC approval 4/21/25 Elevated Tank Generator Replacement Water 0%Summer 2025 PWC to review 4/7/25; seek CC approval 4/21/25 Ahwahnee Ln Watermain Replacement (S. of Deerpath)Water 0%Summer 2025 PWC to review 3/17/25; seek CC approval 4/7/25 Valve Repairs Water 0%Summer 2025 PWC to review 3/17/25; seek CC approval 4/7/25 Elevated Tank Painting Water 0%September – October PWC to review 4/21/25; seek CC approval 5/5/25 Annual Sanitary Sewer Lining Program Sanitary 0%June PWC to review 4/7/25; seek CC approval 4/21/25 Manhole Lining and I&I Repairs Sanitary 5%Summer – Fall 2025 PWC reviewed on 2/3/25 and CC approved bid 2/18/25. PUBLIC COMMENT NEXT MEETING: MARCH 17, 2025 ADJOURNMENT