Loading...
PUBLIC WORKS COMMITTEE 2022/11/28 Packet PUBLIC WORKS COMMITTEE MEETING MONDAY, NOVEMBER 28, 2022 – 5:00 P.M. CITY HALL – COUNCIL CHAMBER CONFERENCE ROOM AGENDA I. ROLL CALL/CALL TO ORDER Jim Preschlack, Chairman Ted Notz Nancy Novit II. ASSET, INFRASTRUCTURE, & SERVICE HIGHLIGHTS – SNOW OPERATIONS PROGRAM III. NEW BUSINESS / ACTION ITEMS 1. APPROVAL OF THE AUGUST 22, 2022 PUBLIC WORKS COMMITTEE MEETING MINUTES 2. REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL AWARD OF THE THREE-YEAR GENERATOR MAINTENANCE CONTRACT – JIM LOCKEFEER 3. REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL AWARD OF ADDITIONAL PHASE I DESIGN ENGINEERING SERVICES FOR THE ROUTE 60 BIKE PATH PROJECT – JIM LOCKEFEER 4. REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL THE PROPOSED FY’24 CAPITAL EQUIPMENT – DAN MARTIN IV. FY ’23 PROJECT ROADMAP STATUS CHART V. BUDGET / HIRING / INNOVATION UPDATES VI. PUBLIC COMMENT VII. NEXT MEETING – TBD VIII. ADJOURNMENT ASSET, INFRASTRUCTURE, & SERVICE HIGHLIGHTS – SNOW OPERATIONS PROGRAM SNOW OPERATIONS •Joint team effort by Public Works, Parks, and Forestry •40 fulltime /6 seasonal employees •Snow Operations handles: •240 miles of paved roadway •37 lane miles of Illinois Routes 43 and 60 •105 miles of sidewalks •29 parking lots •Both train station platforms •17 city buildings / properties •11 bridge decks •7 bike / pedestrian paths •Recent initiatives / innovations implemented: •Snow event resident communications •WhenToWork snow event scheduling application •Snowrator equipment purchase (platforms & ice ponds) •Live weather data / pavement temperature system (Frost Solutions) •Route tracking software (pilot program that did not move forward) •Initiatives / innovations underway: •Cartegraph work order system •Full street route evaluation / recommendation report SNOW OPERATIONS NEW BUSINESS / ACTION ITEM: APPROVAL OF THE AUGUST 22, 2022 PUBLIC WORKS COMMITTEE MEETING MINUTES 1 PUBLIC WORKS COMMITTEE MEETING MONDAY, AUGUST 22 – 4:00 P.M. FOREST PARK – UPPER SOUTH PARKING LOT MINUTES I. ROLL CALL/CALL TO ORDER Chairman Preschlack called the meeting to order at 4:02 P.M. Aldermen Ted Notz and Nancy Novit were in attendance. Staff attending the meeting included Michael Thomas, Director of Public Works; Dan Martin, Superintendent of Public Works; Byron Kutz, Superintendent of Engineering; Chuck Myers, Superintendent of Parks and Forestry and Jim Lockefeer, Assistant to the Director of Public Works. Also in attendance was Dave Kraft, Principal Civil Engineer, of Hey and Associates, Inc. II. ASSET, INFRASTRUCTURE, & SERVICE HIGHLIGHTS – FOREST PARK BLUFF STABILIZATION PROJECT UPDATE Director Thomas and Hey and Associates, Inc. Principal Engineer, Dave Kraft reviewed the below summary presentation slides on the topic. 2 Following the review of these slides, the Committee and City staff toured the entire bluff project area. Dave Kraft provided a detailed overview of the project design, anticipated construction schedule, and construction logistics. The Committee and City staff discussed to-date project coordination with the Forest Park Preservation Board and the project bid process. III. NEW BUSINESS / ACTION ITEMS 1. APPROVAL OF THE JULY 21, 2022 PUBLIC WORKS COMMITTEE MEETING MINUTES Alderman Novit moved to approve the July 21, 2022 Public Works Committee meeting minutes. Alderman Notz seconded the motion, which carried unanimously. 2. REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL AWARD OF THE SAND NOURISHMENT PROJECT BID Superintendent Myers reviewed the below summary presentation slide on the topic. 3 The Committee and City staff discussed and reviewed sand samples, the project permitting process, project construction schedule, construction traffic impacts, and the project’s contingency request. Alderman Novit moved to recommend approval to City Council approve the Beach Cell #1 Sand Restoration Project to John Keno & Co, in the amount of $258,363 plus 4% contingency in the amount of $10,000, for a total of $268,363. Alderman Notz seconded the motion, which carried unanimously. 3. REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL AWARD OF THE ELAWA AND CITY HALL TUCK POINTING PROJECT BID Assistant to the Director Lockefeer reviewed the below summary presentation slides on the topic. 4 Alderman Notz moved to recommend approval to City Council award of bid to Bruce Brugioni Construction Co. for the Elawa Tuck Pointing & Garden Wall Repair Project in the amount of $115,279 to include a 10% contingency in the amount of $11,600 for a grand total of $126,879. Alderman Novit seconded the motion, which carried unanimously. 4. REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL THE PURCHASE OF MOBIL DIESEL EFFICIENT FUEL Superintendent of Public Works Martin reviewed the below summary presentation slides on the topic. 5 The Committee and City staff discussed the fuel purchasing process and the benefits of utilizing Mobil diesel efficient fuel. Alderman Notz moved to recommend approval to City Council award of contract for bulk purchase of Mobil Diesel Efficient Fuel to the Suburban Purchasing Cooperative’s low bidder, Al Warren Oil Co., Inc. Alderman Novit seconded the motion, which carried unanimously. IV. FY ’23 PROJECT ROADMAP STATUS CHART The Committee and City staff reviewed the below prestation slides. 6 The Committee and City staff discussed the IDOT Pump Station Project, the ComEd Bridge Replacement Project, the resurfacing of Deerpath Road, and the Woodland and Illinois Bridge Replacement Project. V. BUDGET / HIRING / INNOVATION UPDATES There were no Budget / Hiring / Innovation Updates. VI. PUBLIC COMMENT There was no public comment. VII. NEXT MEETING Director Thomas explained that he would follow up with the Committee via email to schedule the next Public Works Committee meeting. VIII. ADJOURNMENT 7 Alderman Novit moved to adjourn the meeting of the Public Works Committee at 5:28 P.M. Chairman Preschlack seconded the motion, which carried unanimously. Respectfully submitted, Jim Lockefeer Jr. Assistant to the Director of Public Works NEW BUSINESS / ACTION ITEM: REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL AWARD OF THE THREE- YEAR GENERATOR MAINTENANCE CONTRACT THREE-YEAR GENERATOR MAINTENANCE CONTRACT •The City has thirteen emergency generators that provide backup power in the event of a power outage to critical City facilities; contract includes biannual maintenance and annual load bank testing for all units •Since 2016, the City has entered into two consecutive three-year contracts with a generator maintenance service firm via a Municipal Partnership Initiative bid process •2021 joint bid process included Villages of Buffalo Grove, Glenview, Kenilworth, Highland Park, Mount Prospect, Northbrook, and Palatine •City did not participate in 2021; current agreement under contract through 2022 •Midwest Power Industries, Inc. was the only firm that submitted a bid; all participating Villages executed agreements •City recently obtained the below three-year pricing from Midwest Power Industries •Starting in 2024 two new generators will be added to contract: Oak Knoll and Deerpath Pump Stations (reflected in pricing) •Midwest Power Industries held last City and MPI three-year agreements; all very positive experiences •Contract funded through multiple operating building budgets •Action Requested: PW Committee Recommends City Council Award of Proposal to Midwest Power Industries, Inc. for a Three-Year Generator Maintenance Contract in the amount of $77,975 2023 2024 2025 TOTAL $24,025 $26,975 $26,975 $77,975 NEW BUSINESS / ACTION ITEM: REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL AWARD OF ADDITIONAL PHASE I DESIGN ENGINEERING SERVICES FOR THE ROUTE 60 BIKE PATH PROJECT ROUTE 60 BIKE PATH PROJECT ADDITIONAL PHASE I DESIGN ENGINEERING SERVICES •Design of a 10-foot multi-use path along the north side of Route 60 from the existing sidewalk located west of the Field Drive to Academy Drive •Following the Phase II GHA design agreement approval, a meeting with IDOT revealed outstanding Phase I design items required for Phase I approval •Environmental study & engineering plans that demonstrate ADA compliant crossings at the intersections of Field Court and Field Drive •Both items were not in Phase I design scope with Bleck;thought to be Phase II design items •Obtaining phase I approval very important to project timeline; ITEP grant award specifies that all project work must be complete by June 14, 2025 •Once additional Phase I work complete, IDOT estimated review / approval processes to take six months to one year •Phase II design work and the subsequent review / approval process by IDOT is expected to take at least one year •After Phase II is approved, project construction can be placed out to bid Date Project Milestone May 2020 Project design efforts began after City Council approved a Phase I design agreement with Bleck Engineering June 2021 City receives Phase II design and construction IDOT ITEP grant award in the amount of $521,760 May 2022 City Council approved a Phase II design agreement with Gewalt Hamilton Associates (GHA) ROUTE 60 BIKE PATH PROJECT ADDITIONAL PHASE I DESIGN ENGINEERING SERVICES •Staff recommends approving GHA for Phase II design engineering services; GHA has already dedicated considerable time in reviewing the Phase I plans in preparing for Phase II design (existing relationship) •GHA will be able to seamlessly transition to Phase II design following the completion of Phase I design •GHA has previously demonstrated their ability to effectively coordinate with IDOT to obtain necessary approvals on other City design projects for which IDOT phased engineering services were required •Following the completion of this Phase I design process, GHA will be revising their Phase II design proposal amount to ensure that the City will not be charged any duplicative service fees •Action Requested: PW Committee Recommends City Council Award of Additional Phase I Design Engineering Services for the Route 60 Bike Path Project to Gewalt Hamilton & Associates in the Amount of $33,700 Route 60Route 60 Route 60Field DrField CtAcademyDr NEW BUSINESS / ACTION ITEM: REVIEW AND RECOMMEND APPROVAL TO CITY COUNCIL THE PROPOSED FY’24 CAPITAL EQUIPMENT FY’24 CAPITAL EQUIPMENT FY’24 CAPITAL EQUIPMENT FY’24 CAPITAL EQUIPMENT FY’24 CAPITAL EQUIPMENT FY’24 CAPITAL EQUIPMENT FY’24 CAPITAL EQUIPMENT FY’24 CAPITAL EQUIPMENT •Ambulance purchase will be made utilizing FY25 funds; two-year delay from time of order to delivery •Stryker Power-Load System and Power-Pro Cot will be purchased in the amount of $47,533.96 utilizing FY23 funds •Early purchase of this equipment is anticipated to save the City approximately $5,000 with anticipated price increases to occur January 2023 •The proposed FY24-28 Capital Improvement Program includes $370,000 for a replacement ambulance in FY25. The department is seeking City Council approval to order the ambulance without this equipment at a not to exceed amount of $323,076. Should this advance purchase be approved, the FY25 CIP amount will be reduced from $370,000 to $323,076. FY’24 CAPITAL EQUIPMENT Requested Action: PW Committee Recommends City Council Approve the Fiscal Year 2024 Capital Equipment Program Type of Vehicle Quantity Minimum Mileage / Hrs. Approximate Usage (years) Est. F.Y. '24 Replacement Cost Police:Mid-Size SUV Squad Cars 10 100,000 miles 3 $45,000 Large-Size SUV Squad Cars 1 150,000 miles 6 $60,000 Large Pickup Squad Cars 1 150,000 6 $45,000 Unmarked Squad Cars 7 80,000 miles 7 $25,000 CSO 4 x 4 Pickup 2 150,000 miles 3 $34,000 CSO Parking Scooters 1 5,000 hours 5 $30,000 Radar Trailer 1 10 Department Total:23 Fire: Pumpers 3 9,000 hours 20 $700,000 Pumper / Aerial 1 5,000 hours 20 $1,000,000 Ambulances 4 10,000 hours 16 $275,000 Mid-Size SUV Admin. Veh.3 100,000 miles 7 $40,000 Large-Size SUV Admin. Veh.3 150,000 miles 12 $45,000 Pickup / Van 3 75,000 miles 17 $50,000 4WD ATV 1 10 $22,000 Boat 1 25 $170,000 Equipment Trailers 1 --------------10 $10,000 Department Total:20 Public Works: Sanitation Front load Refuse Trucks 3 18,000 hours 18 $350,000 Rear Load Refuse Trucks 6 18,000 hours 18 $320,000 Refuse Scooters 11 7,000 hours 5 $29,000 Pickups 2 100,000 miles 12 $43,000 Front-End Loader 1 10,000 hours 25 $200,000 Roll-Off Containers 10 --------------20 $5,000 Equipment Trailers 2 --------------10 $10,000 Sub-Total:35 Streets 5-Yard Dump Trucks 7 8,000 hours 20 $250,000 Semi-Tractor (used)1 11,000 hours 20 $40,000 Skid Steer / Mini Track Loader 4 3,500 hours 15 $47,000 Front-End Loader 1 10,000 hours 25 $200,000 12-Yard Dump Truck 1 10,000 hours 20 $275,000 Street Sweeper 1 15,000 hours 18 $300,000 Pickups 4 100,000 miles 12 $43,000 1-Ton Dump Trucks 1 80,000 miles 15 $90,000 Roller 1 1,200 hours 15 $25,000 Tower Truck 1 12,000 hours 15 $200,000 Semi-Dump Trailer 1 --------------15 $60,000 Enclosed Trailers 1 --------------15 $10,000 Equipment Trailers 6 --------------10 $10,000 Trkls. Snow Blwr. (used)1 5,000 hours 30 $20,000 Capital Equipment Replacement Guidelines - F.Y. '24 THE CITY OF LAKE FOREST Type of Vehicle Quantity Minimum Mileage / Hrs. Approximate Usage (years) Est. F.Y. '24 Replacement Cost Capital Equipment Replacement Guidelines - F.Y. '24 THE CITY OF LAKE FOREST Asphalt Hot Mix Trailer 1 1,000 hours 7 $75,000 Directional Bore Machine 1 1500 hours 10 $80,000 V-Box Salt Spreaders 9 --------------20 $18,000 Trailer Arrow Board 1 --------------20 $8,000 Water Tanks 2 --------------20 $10,000 Sub-Total:45 Water/Sewer Vactor 1 8,000 hours 20 $500,000 Jet Rodder 1 2,000 hours 20 $75,000 12-Yard Dump Truck 1 10,000 hours 20 $275,000 5-Yard Dump Trucks 1 8,000 hours 20 $250,000 1-Ton Dump / Crane 1 6,000 hours 20 $100,000 Pickups 4 100,000 miles 12 $43,000 Televising Van 1 9,000 hours 25 $80,000 Utility Van 1 90,000 miles 25 $80,000 4WD Backhoe 1 10,000 hours 25 $200,000 Enclosed Trailers 1 --------------15 $10,000 Equipment Trailers 1 --------------10 $10,000 Water Pumps 5 --------------50 $25,000 Air Compressor 1 2,000 hours 25 $20,000 Sub-Total:20 Water Plant Pickups 2 100,000 miles 12 $43,000 Sub-Total:2 Fleet Fleet Services Vehicle 1 60,000 miles 20 $60,000 Pool Vehicles 4 120,000 miles 4 +exst. 3-yr. veh.$0 Forklift 1 7,000 hours 25 $30,000 Walk-Behind Floor Cleaner 1 500 hours 20 $15,000 Sub-Total:7 Bldg. Maint.Pickup 2 125,000 miles 15 $43,000 Step Vans 4 8,000 hours 17 $100,000 Car 1 120,000 hours 4 +exst. 3-yr. veh.$0 Mobile Floor Scrubber 1 2,500 hours 25 $40,000 Sub-Total:8 Engineering Mid-Size SUV Squad Cars 2 100,000 miles 3 $35,000 Large-Size SUV Squad Cars 1 150,000 miles 6 $40,000 Sub-Total:3 Department Total:120 Parks & Rec. Type of Vehicle Quantity Minimum Mileage / Hrs. Approximate Usage (years) Est. F.Y. '24 Replacement Cost Capital Equipment Replacement Guidelines - F.Y. '24 THE CITY OF LAKE FOREST Parks 1-Ton Dump Trucks 4 80,000 miles 15 $90,000 1-Ton Hooklift Trucks 1 100,000 miles 20 $75,000 5-Yard Dump Trucks 1 8,000 hours 20 $250,000 Pickups 7 100,000 miles 12 $43,000 Groundsmasters 5 7,000 hours 15 $90,000 Tractors 1 6,000 hours 15 $93,000 Mini Track Loaders 1 3,500 hours 15 $47,000 Enclosed Trailers 4 --------------15 $10,000 Equipment Trailers 5 --------------10 $10,000 Compact End-Loader 1 8,500 hours 20 $125,000 Tractor Pull-Behind Aerator 1 --------------20 $10,000 Sand Trap Rakes 4 1,000 hours 20 $25,000 Beach Brick Path Sweeper 1 1,000 hours 35 $35,000 Beach Sand Cleaner 1 1,000 hours 25 $75,000 4WD ATV 1 500 hours 15 $5,000 Refuse Scooters 2 7,000 hours 5 $26,000 Hydro Seeder 1 -------------- Leaf Vacuums 2 1,000 hours 20 $20,000 Boom Sprayer 1 -------------- Boat Harbor Dredger 1 1,500 hours 25 $300,000 Tow-Behind Mower Deck 2 --------------20 $24,000 Tow-Behind Leaf Blower 1 --------------15 $7,000 Utility Cart 3 -------------20 $30,000 Sub-Total:51 Forestry 1-Ton Dump Trucks 1 80,000 miles 15 $90,000 1-Ton Hooklift Trucks 1 100,000 miles 20 $90,000 5-Yard Dump Trucks 3 8,000 hours 20 $250,000 Pickups 2 100,000 miles 12 $43,000 Log Loader 1 10,000 hours 22 $255,000 Mini Track Loaders 1 3,500 hours 15 $47,000 Equipment Trailers 3 --------------10 $10,000 Compact Loader 1 8,500 hours 20 $125,000 Tower Truck 1 15,000 hours 20 $270,000 Chipper 2 3,500 hours 10 $190,000 Stump Grinder 1 2,000 hours 20 $75,000 Log Splitter 1 --------------25 $3,000 Sprayers 3 -------------- Sub-Total:21 Cemetery 1-Ton Dump 1 75,000 miles 25 $90,000 Toolcat 1 4.000 hours 16 $66,000 Utility Cart 1 1,000 hours 22 $30,000 Mini-Excavator 1 3,000 hours 25 $75,000 Type of Vehicle Quantity Minimum Mileage / Hrs. Approximate Usage (years) Est. F.Y. '24 Replacement Cost Capital Equipment Replacement Guidelines - F.Y. '24 THE CITY OF LAKE FOREST Toro Dingo 1 2,000 hours 20 $25,000 Enclosed Trailers 2 --------------15 $10,000 Sub-Total:7 Recreation Pickups 1 100,000 miles 12 $43,000 Equipment Trailers 7 --------------10 $10,000 Mule (Boat Mover)2 --------------10 $5,000 Airboat 1 -------------- 4WD ATV 2 500 hours 15 $5,000 Utility Cart 1 1,000 hours 22 $30,000 Sub-Total:14 Senior Car 1 125,000 miles 12 $40,000 14 Passenger Bus 1 3,500 hours 15 $140,000 Sub-Total:2 CROYA Van 1 50,000 miles 15 $50,000 Sub-Total:1 Golf Course Pickup 1 100,000 15 $43,000 Seeders 0 Sprayers 1 15 $120,000 Mowers 13 5000 hours 10-15 $41,000 Aerators 4 20 $10,000 Utility Carts 12 5000 hours 20 $22,000 Sand Trap Rakes 3 1000 hours 20 $25,000 Ball Picker 1 15 $13,000 Tractor 3 6,000 hours 15 $32,000 Pull-Behind Blower 2 15 $11,000 Electric Golf Carts 45 Kemper Lease Sub-Total:85 Department Total:181 Com. Dev. Building Inspector Cars 5 120,000 miles 4 +exst. 3-yr. veh.$0 Department Total:5 GRAND TOTAL:349 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE GRAND TOTALS FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 TOTAL - GENERAL FUND BLD. MNT.45,000 0 0 103,000 0 0 0 0 0 0 238,000 0 0 58,000 0 COM / ENG.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 FIRE 0 0 65,000 0 65,000 0 0 0 417,000 0 28,000 0 469,000 0 POLICE 86,000 92,600 143,100 35,100 205,800 48,500 183,700 208,400 186,400 110,600 295,500 170,900 SAN.366,000 397,000 348,600 59,200 359,000 52,000 0 338,000 0 0 225,700 137,200 0 475,000 0 STREETS 0 6,000 65,000 173,800 0 240,000 301,000 310,000 633,300 0 1,281,000 0 0 SEN./CROYA 0 0 0 0 0 0 64,000 0 0 0 ANNUAL CIP 497,000 403,000 506,200 401,000 502,100 392,100 506,800 386,500 493,700 417,000 1,305,400 415,600 1,391,600 1,297,500 170,900 *OTHER ACCTS 43,000 46,300 370,000 0 799,100 0 1,500,000 107,400 0 0 0 TOTAL 540,000 552,500 502,100 1,305,900 493,700 2,805,400 523,000 1,391,600 1,297,500 170,900 TOTAL - PARKS & RECREATION FUND PARKS 75,000 11,300 57,000 57,500 139,000 0 155,000 155,000 979,800 208,200 205,000 180,000 0 REC.0 0 14,000 0 0 22,800 0 0 0 0 FOREST.0 150,000 146,300 87,000 75,000 11,500 150,000 150,000 0 0 118,300 0 798,000 59,000 0 75,000 150,000 157,600 144,000 146,500 150,500 150,000 150,000 155,000 155,000 1,120,900 208,200 1,003,000 239,000 0 TOTAL - FLEET FUND FLEET 68,000 38,000 0 0 0 0 TOTAL - WATER FUND W&S/W.P.55,000 110,000 350,000 50,000 150,000 330,000 55,000 280,000 385,000 0 TOTAL - CEMETERY FUND CEM.0 100,000 0 0 0 115,000 0 TOTAL - GOLF COURSE FUND GOLF 76,000 40,000 55,000 55,000 45,000 75,000 25,000 55,000 15,000 55,000 *Other Accounts: I.E. Foundations, Police Seizure Fund, Fire Trucksl) THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE BUILDING MAINTENANCE SECTION CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 50 Bldg. Mnt.GMC 3/4-ton, 2WD, ext cab 2017 58,000 51 Bldg. Mnt.Union City MT 45 Walk-In Van 2003 45,000 52 Bldg. Mnt.Isuzu Reach Van 2012 94,000 53 Bldg. Mnt.Morgan/Olsen MT 45 Walk-In Van 2008 103,000 54 Bldg. Mnt.Isuzu Reach Van 2012 94,000 55 Bldg. Mnt.Chevrolet Impala 2011 56 Bldg. Mnt.Chevrolet 1/2 Ton 4WD Crew Cab 2008 59 Bldg. Mnt.Tennant 7400 Floor Scrubber 2002 50,000 Bldg. Maint. Total 45,000 0 0 103,000 0 0 0 0 0 0 238,000 0 0 58,000 0 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE COMMUNITY DEVELOPMENT & ENGINEERING CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 501 Insp.Ford Explorer 2017 502 Insp.Chevrolet Equinox 2011 505 Eng.Chevrolet 4WD Tahoe 2013 507 Eng.Ford Explorer 2015 508 Eng.Chevrolet Tahoe 2017 509 Insp.Ford Explorer 2017 510 Insp.Ford Explorer 2014 512 Insp.Ford Explorer 2015 Com. Dev. & Eng. Total 0 0 0 0 0 0 0 0 0 0 *All vehicles are repurposed Police vehicles THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE FIRE DEPARTMENT CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 200 Fire Chevrolet 4WD Tahoe 2017 65,000 201 Fire Ford Explorer 2021 202 Fire Ford Explorer 2015 203 Fire GMC 4WD Sierra Crew Cab 2020 210 Fire Seagrave Pumper 1977 211 Fire E-One Typhoon 2007 750,000 212 Fire Pierce Dash Squad 2007 214 Fire Marion Spartan Pumper 2019 232 Fire E-One Cyclone 2003 1,500,000 241 Fire Ford F550 SD Ambulance 2020 242 Fire International 4300 LP Ambulance 2004 370,000 243 Fire International 4300 LP Ambulance 2008 417,000 244 Fire International 4400 LP Ambulance 2015 469,000 276 Fire GMC 4WD Sierra 4WD Reg. Cab 2020 280 Fire GMC Savanna Van 2003 65,000 281 Fire Chevrolet Tahoe 2009 282 Fire Ford Explorer 2015 290 Fire CanAm Defender UTV 2020 28,000 291 Fire Boston Whaler 280 Outrage Boat 2020 Fire Dept. Total 0 0 0 65,000 0 65,000 0 0 0 417,000 0 28,000 0 469,000 0 Separate CIP Total 0 0 0 370,000 0 0 750,000 0 0 0 1,500,000 0 0 0 0 *Fire Department utilizes own Department funds to equip vehicles THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE POLICE DEPARTMENT CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 1 Police Ford F-150 2022 46,300 53,700 2 Police Ford Explorer 2020 43,000 46,000 49,100 53,700 58,600 3 Police Chevrolet 4WD Tahoe 2020 58,500 67,900 4 Police Ford Explorer 2020 47,700 52,100 56,900 5 Police Ford Explorer 2020 46,300 50,600 55,300 6 Police Ford Explorer 2021 47,700 52,100 56,900 7 Police Ford Explorer 2020 47,700 52,100 56,900 8 Police Ford Explorer 2020 46,300 50,600 55,300 9 Police Ford Exploer 2019 49,100 52,100 56,900 10 Police Ford Explorer 2020 43,000 49,100 53,700 11 Police Ford Explorer K9 2019 46,300 53,700 12 Police Ford Explorer 2020 43,000 49,100 53,700 58,600 13 Police Chevrolet Impala 2014 14 Police Chevrolet 4WD Tahoe 2013 15 Police Chevrolet Impala 2011 16 Police Chevrolet Impala 2007 17 Police Ford Taurus 2013 19 Police Ford Explorer 2014 20 Police Chevrolet Colorado 2022 35,100 39,500 21 Police Honda Pilot 2016 22 Police Chevrolet Colorado (replaced GEM)2022 36,000 39,500 23 Police GO-4 Parking Scooter 2022 36,200 26 Police MPH Scout Radar Trailer 2017 12,500 Police Department Total 86,000 92,600 143,100 35,100 205,800 48,500 183,700 208,400 186,400 110,600 295,500 170,900 Separate CIP Total 43,000 46,300 0 49,100 0 0 107,400 0 0 0 *Fire Department utilizes own Department funds to equip vehicles THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE SANITATION SECTION CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 160 Sanitation Honda Pioneer 1000 2020 34,300 161 Sanitation Honda Pioneer 1000 2019 31,000 33,300 162 Sanitation Honda Pioneer 1000 2020 34,300 163 Sanitation Honda Pioneer 1000 2020 34,300 164 Sanitation Honda Pioneer 1000 2019 29,600 33,300 165 Sanitation Honda Pioneer 1000 2019 29,600 33,300 166 Sanitation Cushman 4-whl Refuse Trkstr.2014 31,000 167 Sanitation Cushman 4-whl Refuse Trkstr.2015 0 31,000 168 Sanitation Cushman 4-whl Refuse Trkstr.2015 0 31,000 169 Sanitation Cushman 4-whl Refuse Trkstr.2015 0 30,000 170 Sanitation Honda Pioneer Truckster 1000 2020 34,300 171 Sanitation Cushman 4-whl Refuse Trkstr 2015 0 30,000 172 Sanitation Cushman 4-whl Refuse Trkstr 2015 29,600 181 Sanitation Autocar Refuse Truck 2003 182 Sanitation Peterbilt Front Load Recy. Truck 2021 183 Sanitation Volvo Refuse Truck 2007 338,000 184 Sanitation Autocar Front Load Recy. Truck 2012 475,000 185 Sanitation Volvo Refuse Truck 1998 335,000 186 Sanitation Autocar Front Load Recy. Truck 2015 187 Sanitation Autocar Refuse Truck 2005 319,000 188 Sanitation Autocar Refuse Truck 2003 335,000 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE SANITATION SECTION CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 189 Sanitation Autocar Refuse Truck 2006 328,000 190 Sanitation Chevrolet 2500HD Crew Cab 4WD 2009 52,000 191 Sanitation Chevrolet 1/2 Ton 4WD Silverado 2014 53,000 194 Sanitation John Deere 544K High Lift Loader 2010 196 Sanitation Wells Covered Trailer 2016 12,800 Sanitation Dymar 10, 17 yd. containers 1999 Sanitation Section Total 366,000 397,000 348,600 59,200 359,000 52,000 0 338,000 0 0 225,700 137,200 0 475,000 0 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE STREETS SECTION CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 402 Streets Chevrolet 1/2 ton 4WD Silverado 2015 53,000 403 Streets GMC 1/2 ton 4WD Sierra 2017 53,000 404 Streets Chevrolet 3/4 ton 4WD Silverado 2003 53,000 405 Streets Sprayer Spec.1,200 gal. de-ice tank 2002 406 Streets Sprayer Spec.1,800 gal. de-ice tank 2006 421 Streets Vermeer D9X13-III Directional Bore 2014 422 Streets Neal Cable Trailer 2015 423 Streets Husqvarna Concrete Saw 2008 425 Streets Cat Mini-Loader 908M 2021 426 Streets International 4400 service truck 2005 124,000 430 Streets GMC Cab-Over W-5500 2006 98,000 431 Streets Peterbilt 348 - Hooklift 2018 432 Streets Peterbilt 348 - Hooklift 2019 433 Streets International 4300 LP / Terex 2016 261,000 439 Streets Felling FT-14IT-I Trailer 2010 12,000 440 Streets CAT 262C 2010 65,000 441 Streets Bobcat T-450 Track Loader 2018 ` 442 Streets John Deere 544-H Endloader 2001 240,000 443 Streets Bobcat T-450 Track Loader 2018 448 Streets Elgin Sweeper-Broom Bear 2017 460 Streets Felling FT-6T Wood Trailer 2003 10,300 461 Streets Ingersoll DD12S Roller 2005 25,800 469 Streets Side Dump Side Dump Trailer 2012 76,500 470 Streets Cronkite Bobcat Trailer 1995 0 6,000 0 472 Streets Gold R Trailer 1994 10,300 473 Streets Karav Port. Welder Trailer 1995 10,300 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE STREETS SECTION CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 474 Streets Spalding Cold / Hot Mix Mach.2014 94,000 475 Streets Wanco Mobile Arrow Board 2003 8,800 476 Streets Wells Cargo Tandem Covered Trailer 1998 10,300 477 Streets Trackless Snow Blower 1999 5,800 478 Streets Sno-Go WK-800 Snow Blower 2011 480 Streets Trackless Series MT 1999 162,000 481 Streets International 7400 - Hooklift 2011 340,000 482 Streets International 7400 - Dump Truck 2006 310,000 484 Streets Kenworth T680 5th Wheel Tractor 2015 485 Streets International 7400 - Dump Truck 2005 301,000 486 Streets International 7400 - Dump Truck 2011 340,000 488 Streets International 7400 - Dump Truck 2011 340,000 180VB Streets Monroe Stainless Steel V-Box 1999 431VB Streets Swenson Stainless Steel V-Box 2018 432VB Streets Monroe Stainless Steel V-Box 2019 481VB Streets Monroe Stainless Steel V-Box 1999 483VB Streets Swenson Stainless Steel V-Box 2011 683VB Streets Monroe Stainless Steel V-Box 1999 684VB Streets Monroe Stainless Steel V-Box 1999 980VB Streets Monroe Stainless Steel V-Box 2019 981VB Streets Monroe Stainless Steel V-Box 2020 Streets Section Total 0 6,000 65,000 173,800 0 240,000 301,000 0 310,000 0 633,300 0 1,281,000 0 0 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE SENIOR CENTER / CROYA CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 62 Senior Ford E350 Bus 2019 64 CROYA Chevrolet Express 15-Passenger 2015 64,000 65 Senior Toyota Avalon Touring 2008 0 CROYA Total 0 0 0 0 0 0 64,000 0 0 0 Senior Foundation FundTotal 0 0 0 0 0 0 0 0 0 0 0 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE PARKS SECTION CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 301 Parks GMC 3/4-Ton, Ext. Cab - 4WD 2015 75,000 303 Parks Toro Grounsdmaster-4WD 2017 121,000 304 Parks Kubota M6040HDC 4WD Tractor 2008 114,000 305 Parks Toro GroundsMaster-4WD 2011 306 Parks Toro GroundsMaster-328D 2006 57,000 307 Parks Toro Groundsmaster 7210 2020 308 Parks Toro Pro Core 1298 Aerator 2011 48,000 309 Parks Toro Groundsmaster 4010-D 2015 118,000 310 Parks Chevrolet 3/4-Ton, Reg. Cab 4WD 2016 53,000 311 Parks International 4400 Crew Cab 2006 155,000 155,000 314 Parks Buffalo Turbin Tow-Behind Leaf Blw 2002 11,300 315 Parks Chevrolet 3/4-ton, Reg. Cab 4WD 2016 53,000 316 Parks Land Pride Tow-Behind Brush Mower 2013 317 Parks Dakota Top Dresser 440 2021 318 Parks Land Pride All-Flex Mower 2008 29,000 319 Parks Chevrolet 3/4-Ton, Reg. Cab 4WD 2015 53,000 320 Parks Chevrolet 1/2-Ton, Ext. Cab 4WD 2014 53,000 321 Parks Chevrolet 3500HD Crew Cab Dump 2013 112,000 322 Parks Chevrolet 3/4-Ton 4WD Crew Cab 2018 65,000 323 Parks GMC 3/4-Ton Ext. Cab 4WD 2015 53,000 324 Parks Cherrington Beach Cleaner 2008 325 Parks CAT 908HQ Compact Loader 2011 144,000 326 Parks Chevrolet 3500HD Crew Cab Dump 2011 112,000 327 Parks Isuzu W-4500 Reg. Cab 2008 112,000 328 Parks Chevrolet 3500HD Reg. Cab Hooklift 2013 329 Parks Chevrolet 3500HD Crew Cab Dump 2013 112,000 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE PARKS SECTION CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 330 Parks Wells Cargo Trailer 2021 331 Parks Big Tex Trailer: 35SA-12BK41 2010 11,500 332 Parks Wells Cargo Covered Trailer 2016 13,000 333 Parks Felling FT-12IT-1 Tip Trailer 2018 12,300 334 Parks Wells Cargo Covered Trailer 2015 12600 335 Parks Wells Cargo Trailer 2015 12600 336 Parks Big Tex Tip Trailer 2015 11500 337 Parks Felling FT-12-Drop Deck Trailer 2020 338 Parks Big Tex Tip Trailer 2016 11,500 339 Parks Worthington Aluminum Trailer 2015 11500 350 Parks Bobcat T-450 Track Loader 2017 59,000 364 Parks Giant Vac Leaf Vacuum 2008 25000 365 Parks Giant Vac Leaf Vacuum 2008 25,000 367 Parks Cushman Boom Sprayer 2004 368 Parks TCF Flatbed Trailer 2001 11500 369 Parks IMS Dredger 2001 75,000 370 Parks Northstar Water Tank w/ pump 2000 371 Parks Toro Workman HDX 2020 372 Parks Ketchum Hydroseeder 2000 373 Parks Toro Workman 4200 2001 32,000 374 Parks Honda Pioneer 700 Utility 2018 375 Parks Cushman Refuse Truckster-4 Whl 2004 32,000 376 Parks Polaris 4WD ATV 2008 10,500 380 Parks Power Boss Beach Sweeper 1988 381 Parks Toro Sand Pro 2020 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE PARKS SECTION CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 382 Parks Toro Sand Pro 2020 383 Parks Toro Sand Pro 2001 25,500 384 Parks Toro Sand Pro 2004 25,500 394 Parks Baker Mule (boat mover)1990 -----Parks John Deere 4WD Tractor - 5125R 2021 Parks Section Total 75,000 0 11,300 57,000 57,500 139,000 0 0 155,000 155,000 979,800 208,200 205,000 180,000 0 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE RECREATION DEPARTMENT CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 18001 Recreation Airboat 18002 Recreation Trailer 18003 Recreation Performance Trailer 2001 18005 Recreation Polaris Sportsman 4WD ATV 2009 10,500 18006 Recreation Cushman 4-Whl. Faltbed Scooter 2005 18007 Recreation Kawasaki 4WD ATV 2009 14,000 18008 Recreation Karavan Trailer 2002 18009 Recreation GMC 1-Ton 4WD Ext Cab Sierra 2007 18010 Recreation Triad Sunfish Trailer 2003 18011 Recreation DJ Products Mule 2006 18012 Recreation DJ Products Mule 2015 18013 Recreation E-Z Loader Boat Trailer 2013 18014 Recreation E-Z Loader Boat Trailer 2010 18015 Recreation Caravan Trailer 2001 18016 Recreation Venture VB-220 Single Axle Trailer 2018 12,300 Recreation Total 0 0 0 0 14,000 0 0 0 0 0 22,800 0 0 0 0 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE FORESTRY SECTION CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 603 Forestry GMC Sierra 1/2 ton 4WD 2015 53,000 612 Forestry International 4400 Ext. Cab 2004 150,000 150,000 613 Forestry Trackless Boom Flail Mower 2008 615 Forestry Northern Log Splitter 1999 625 Forestry CAT 908M Compact Loader 2018 630 Forestry Chevrolet 2WD 3500 Dump 2021 631 Forestry Chevrolet 1-Ton, reg. Cab, 4WD 2014 53,000 633 Forestry Chevrolet 4WD 3500 Dump 2016 118,000 634 Forestry Leco-ULV Sprayer 1989 641 Forestry Mobark M15R Chipper 2013 75,000 642 Forestry Bandit 1990 XP Chipper 2010 643 Forestry Rayco Stumper 2005 87,000 644 Forestry Grower Eqpt.Sprayer 2006 647 Forestry Belshe Trailer 1987 10,300 648 Forestry Felling FT-20-2 Trailer 2005 11,500 649 Forestry Felling FT-12IT-1 Tip Trailer 2018 12,300 650 Forestry Bobcat T-450 Skid Loader 2017 59,000 669 Forestry Autocar ACX Epsilon Palfinger Loader 2019 670 Forestry North Star Sprayer / Tank 1999 672 Forestry International 7400 - Tower Truck 2003 150,000 136,000 683 Forestry International 7400 - Hooklift 2011 340,000 684 Forestry International 7400 - Hooklift 2011 340,000 684T Forestry Monroe 1800 gal. Water Tank 1999 Forestry Section Total 0 150,000 146,300 87,000 75,000 11,500 150,000 150,000 0 0 118,300 0 798,000 59,000 0 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE FLEET MAINTENANCE SECTION CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 119 Fleet Chevrolet Impala 2008 120 Fleet Chevrolet 1-Ton Cabinet Truck 2005 68,000 121 Fleet Chevrolet Impala 2008 123 Fleet Chevrolet 4WD Tahoe 2013 124 Fleet Tennant 5700XP Floor Cleaner 2010 128 Fleet Chevrolet Impala 2011 129 Fleet Toyota Fork Lift 2004 38,000 Fleet Mtn. Section Total 0 68,000 0 0 0 38,000 0 0 0 0 *All vehicles (except for #120) are repurposed Police vehicles THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE WATER & SEWER / WATER PLANT SECTIONS CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 901 W&S Chevrolet 2500 HD-4WD 2016 50,000 902 W&S Chevrolet 2500 HD 4WD 2011 50,000 903 W&S Chevrolet 1-Ton 4WD, Reg. Cab 2014 50,000 904 Wtr. Plant Chevrolet 1/2-ton 4WD, ext. cab 2013 0 50,000 906 W&S GMC 1/2-ton 4WD, ext. cab 2018 55,000 908 Wtr. Plant GMC 3/4-Ton, 4WD Reg. Cab 2015 50,000 927 W&S GMC Savannah-TV Truck 1997 55,000 110,000 928 W&S GMC Savana Cutaway 2003 100,000 932 W&S Chevrolet TopKick 4500 2004 105,000 940 W&S John Deere 410-G Backhoe 2005 280,000 941 W&S Sullair Air Compressor 2001 25,000 970 W&S Petebilt 567 Vactor 2100 Plus 2017 972 W&S United Shoring Trailer 1996 10,000 973 W&S Felling FT-14TI Tip Trailer 2012 0 10,000 979 W&S Sewer Eqpt.Jet Rodder 2001 80,000 980 W&S Peterbilt 348 - Hooklift 2019 981 W&S Freightliner Heavy Dump Truck 2003 0 300,000 983 W&S International Heavy Dump Truck 2011 385,000 999 W&S Wacker Hammer 1996 -----W&S Wacker 6" Trash Pump PT6LT 2021 W & S Section Total 55,000 110,000 350,000 50,000 150,000 330,000 55,000 280,000 385,000 0 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE CEMETERY SECTION CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 701 Cemetery Chevrolet Cab-Over Dump Truck 2003 100,000 702 Cemetery Toro Dingo 2003 703 Cemetery Toro Workman 2018 704 Cemetery Bobcat Toolcat 5600 2020 706 Cemetery Bravo Trailer 2014 707 Cemetery Wells Covered Trailer 2016 708 Cemetery Polaris GEM 2017 709 Cemetery Kubota Mini Excavator 2007 0 0 0 115,000 Cemetery Total 0 100,000 0 0 0 0 0 0 115,000 0 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE GOLF COURSE CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1 NF 28 28 1NF 29 30 31 32 33 801 Golf Chevrolet 1/2-ton ext. cab, 2WD 2002 0 802 Golf John Deere Aerocore 2002 35,000 803 Golf J. Deere Tractor - 1070 1990 804 Golf J. Deere Tractor - 970 1990 805 Golf Kubota Tractor - 4900- -4WD 2000 55,000 806 Golf TBD Skid Steer (addition)2033 55,000 807 Golf TBD Top Dresser (addition)2030 25,000 808 Golf Toro Groundsmaster 3500-D 2020 809 Golf Toro GreensPro 2015 25,000 811 Golf Buff. Turbine Pull Behind Blowers 2007 15,000 812 Golf Toro Pro-Force 2014 828 Golf EZ-GO Workhorse 2001 829 Golf Yamaha Utility Cart - Electric 2007 830 Golf Toro Workman 3200 2000 832 Golf Cushman Ball Picker Cart 2022 833 Golf Toro Workman HDX 2022 834 Golf Toro Workman 2008 15,000 842 Golf John Deere 7500 Precision Cut 2012 851 Golf Toro Pro Core Aerator 2016 852 Golf Toro Groundsmaster 4000D 2024 76,000 (addition) 862 Golf Toro Greens Master 2016 863 Golf Toro Workman 1999 864 Golf Toro Workman 2018 865 Golf Toro Workman 2018 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE GOLF COURSE CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1NF 28 281NF 29 30 31 32 33 866 Golf Toro Workman 2018 872 Golf Toro Sand Trap Rake 2014 20,000 873 Golf Toro Sand Trap Rake 2016 877 Golf Toro Groundsmaster 4700D 2016 878 Golf Toro Trans Pro trailer 2020 879 Golf Toro Greensmaster 2120 2020 880 Golf Toro Greensmaster 2120 2020 881 Golf E-Z GO Utility Cart 2001 882 Golf Cushman Haulster - Ball Picker 2015 884 Golf John Deere 2500B Greensmower 2013 885 Golf John Deere Gator - Sprayer 2015 75,000 886 Golf John Deere 2500 Greens Mower 2002 887 Golf John Deere 2500B Greens Mower 2007 888 Golf John Deere 2500A Greens Mower 2003 45,000 889 Golf John Deere Ltwght. Frwy. Mwr.2020 890 Golf John Deere 2653B Bank Mower 2012 891 Golf Toro Greensmaster Triflex 2022 893 Golf John Deere Fairway Mower 2005 55000 1 Golf E-Z GO Medalist-Golf Car 2019 2 Golf E-Z GO Medalist-Golf Car 2019 3 Golf E-Z GO Medalist-Golf Car 2019 4 Golf E-Z GO Medalist-Golf Car 2019 5 Golf E-Z GO Medalist-Golf Car 2019 6 Golf E-Z GO Medalist-Golf Car 2019 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE GOLF COURSE CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1NF 28 281NF 29 30 31 32 33 7 Golf E-Z GO Medalist-Golf Car 2019 8 Golf E-Z GO Medalist-Golf Car 2019 9 Golf E-Z GO Medalist-Golf Car 2019 10 Golf E-Z GO Medalist-Golf Car 2019 11 Golf E-Z GO Medalist-Golf Car 2019 12 Golf E-Z GO Medalist-Golf Car 2019 13 Golf E-Z GO Medalist-Golf Car 2019 14 Golf E-Z GO Medalist-Golf Car 2019 15 Golf E-Z GO Medalist-Golf Car 2019 16 Golf E-Z GO Medalist-Golf Car 2019 17 Golf E-Z GO Medalist-Golf Car 2019 18 Golf E-Z GO Medalist-Golf Car 2019 19 Golf E-Z GO Medalist-Golf Car 2019 20 Golf E-Z GO Medalist-Golf Car 2019 21 Golf E-Z GO Medalist-Golf Car 2019 22 Golf E-Z GO Medalist-Golf Car 2019 23 Golf E-Z GO Medalist-Golf Car 2019 24 Golf E-Z GO Medalist-Golf Car 2019 25 Golf E-Z GO Medalist-Golf Car 2019 26 Golf E-Z GO Medalist-Golf Car 2019 27 Golf E-Z GO Medalist-Golf Car 2019 THE CITY OF LAKE FOREST 10 YEAR CAPITAL EQUIPMENT SCHEDULE GOLF COURSE CITY EQUIP TYPE &FY FY FY FY FY FY FY FY FY FY FY FY FY FY FY #SECTION MAKE BODY STYLE YEAR 24 24 1NF 25 25 1NF 26 26 1NF 27 27 1NF 28 281NF 29 30 31 32 33 28 Golf E-Z GO Medalist-Golf Car 2019 29 Golf E-Z GO Medalist-Golf Car 2019 30 Golf E-Z GO Medalist-Golf Car 2019 31 Golf E-Z GO Medalist-Golf Car 2019 32 Golf E-Z GO Medalist-Golf Car 2019 33 Golf E-Z GO Medalist-Golf Car 2019 34 Golf E-Z GO Medalist-Golf Car 2019 35 Golf E-Z GO Medalist-Golf Car 2019 36 Golf E-Z GO Medalist-Golf Car 2019 37 Golf E-Z GO Medalist-Golf Car 2019 38 Golf E-Z GO Medalist-Golf Car 2019 39 Golf E-Z GO Medalist-Golf Car 2019 40 Golf E-Z GO Medalist-Golf Car 2019 41 Golf E-Z GO Medalist-Golf Car 2019 42 Golf E-Z GO Medalist-Golf Car 2019 43 Golf E-Z GO Medalist-Golf Car 2019 44 Golf E-Z GO Medalist-Golf Car 2019 45 Golf E-Z GO Medalist-Golf Car 2019 Golf Course Total 76,000 40,000 55,000 55,000 45,000 75,000 25,000 55,000 15,000 55,000 FY ’23 PROJECT ROADMAP STATUS CHART PROJECT ROADMAP –CAPITAL FUND Project Asset Category % Complete Project Timeline Notes Waveland Park: W Parking Lot Resurface & Expansion Parking Lot 100%Early May –Mid June Complete Forest Ave Parking Lot Resurfacing Parking Lot 100%Late July –Late August Complete. One EV charging station installed. Second station install will be completed after ComEd completes onsite service upgrade. Public Safety Fire Garage Roof Replacement Facility 100%Early May –Mid June Complete Elawa & City Hall Tuckpointing Facility 15%Spring of 2022 CC bid approval 9/6; work to be completed spring of 2022 Annual Asphalt Resurfacing & Patching Program Road 100%Mid May -Early August Complete Waukegan & Everett Intersection -Metra Upgrades Road 10%Fall Agreements with Metra finalized, CC approved August 1, tentative start date is Spring 2023, coordination meeting with Metra held on 9/15 Deerpath Streetscape Project Phase II Design Road 40%February 2022 – September 2023 Phase II design work continues; ITEP project grant application submitted; anticipating award announcements June 2023 Annual Concrete Sidewalks &Curbs Repairs Road & Sidewalk 100%August Complete Pavement Management Program Road & Paths 90%Mid May –September Data analysis phase completed; Staff analyzing and reviewing deliverables; final report to be completed by late November RT. 60 Bike Path Phase II Design (Academy-Field Dr)Path 15%May 2022 – September 2023 Design and construction funding secured from ITEP; working with IDOT to obtain Phase I approval Illinois & Woodland Pedestrian Bridge Construction Bridge 95%TBD Both the Woodland & Illinois pedestrian bridges have been replaced and back open to pedestrians and bicyclists. Punchlist and landscape restoration items remain Lake-Woodbine Bridge Reconstruction Design PH 1/2 Bridge 45%May 2022 –Fall 2024 HPC approval 3/16; finalizing Phase I Design; Phase II RFP late fall or early winter; City was selected for IDOT bridge grant PROJECT ROADMAP –CAPITAL FUND (CONTINUED) Project Asset Category % Complete Project Timeline Notes McLennon-Reed Bridge Repairs Design Bridge 65%May –September Proposals reviewed by PWC 4/19 and CC approved 5/2; survey completed; pre-final cost estimates were received in early October which were used for the budget process Rockefeller/McCormick/Loch Ravine Design Ravine 65%May –September Final design documents estimated to be completed by the end of December Seminary Ravine Improvements -Design Ravine 65%May –September Final design documents estimated to be completed by the end of December Capital Equipment -All Funds Capital Equipment 90%Ongoing F.Y. 23 equipment ordered; waiting for deliveries Burr Oak Storm Sewer Construction Storm Sewer 95%May –Early October The project is substantially complete, with punchlist work remaining for spring 2023; Lake County SMC hosted a ribbon cutting on 11/2; updates found at www.cityoflakeforest.com/burroak Ahwahnee Road Storm Sewer Upgrade Design Storm Sewer 35%May –September Engineering consultant has run various drainage models and started preliminary design now that routing has been determined; Staff applied for SMC DCEO-STOCIP grant in early October and should hear back from SMC in spring, 2022. Annual Storm Sewer Lining Program Storm Sewer 100%August –September Bid opening on 5/19, bids reviewed by PWC 5/26 and CC approved 6/6; all work complete with final invoice remaining Forest Park Bluff Slope Stabilization Forest Park Bluff 0%September 2022 – May 2023 Bid opening 8/16; project exceeds budgeted amount and will be placed out to bid in January / February 2022. ADA Transition Plan Facilities / Parks / Roads / Sidewalks 5%May –September Project RFP to be reissued early this winter Annual Gas Light Conversion Program Street Lighting 25%Ongoing Completed conversion of eight lights behind HS (Edgewood to Noble & Spruce to Sheridan); program to resume spring 2023 Annual Longline Striping Program Street 100%Fall Complete PROJECT ROADMAP –WATER FUND Project Asset Category % Complete Project Timeline Notes Deerpath Watermain Replacement (Ahwahnee Ln-Golf)Water 100%March –End of May Completed Pump VFD Upgrade Water 30%May –December Bids reviewed by PWC 2/17; CC approved 3/7; equipment submittals reviewed and VFDs delivery extended to December. Water Plant: Membrane Filter Modules Water 100%May CC approval 5/2; module installation complete Spruce and Sheridan Pump Replacement Sanitary 100%May –October Complete Annual Hydrant Painting Program Water & Sewer 100%Fall Complete Annual Leak Detection Program Water 100%September Final report received; Water & Sewer staff making necessary repairs this summer and fall Water Distribution Pressure Sensors Water 80%Late Fall Sensors received; control cabinets received. Cabinet & sensor installation in progress; programming SCADA in progress. Valve Repairs Water 100%September Project included the replacement of faulty valves Annual Valve Exercising Program Water 100%July Annually exercise 20% of all water distribution valves BUDGET / HIRING / INNOVATION UPDATES PUBLIC COMMENT NEXT MEETING: TBD ADJOURNMENT