PARKS & RECREATION BOARD 2020/08/18 PacketPARKS AND RECREATION BOARD
TUESDAY, AUGUST 18, 2020
6:30PM
REMOTE ACCESS MEETING
Please be advised that all of the Park and Recreation Board members will be remotely
attending this Park and Recreation Board meeting by electronic means, in compliance
with Governor’s Executive Order 2020-07, issued on March 16, 2020, that suspended
certain Open Meetings Act provisions relating to in-person attendance by members of a
public body. Specifically, the Governor’s Order: (1) suspends the requirement in Section
2.1 that “members of a public body must be physically present;” and (2) suspends the
limitations in Section 7 on when remote participation is allowed. This Executive Order is
effective the duration of the Gubernatorial Disaster proclamation.
The City will be providing members of the public with the opportunity to participate in this
meeting. Members of the public can participate remotely in the meeting by following the
following link https://us02web.zoom.us/j/88526378825 . The City of Lake Forest will update
the website after the meeting with information about the meeting.
I.CALL TO ORDER & ROLL CALL
Paul Best, Chairman Marc Silver
Nancy Duffy Kaci Spirito
Shannon Maguire
Jared Rhoads
Melanie Walsh
II.*APPROVAL OF MINUTES
i.Approval of minutes of the June 16, 2020 Parks and Recreation
Board Meeting
III.OPPORTUNITY FOR CITIZENS TO ADDRESS THE PARKS AND RECREATION BOARD ON
NON-AGENDA ITEMS
IV.DEERPATH GOLF COURSE UPDATE- Presented by Vince Juarez, Regional
Operations Executive, Kemper Sports Management
V.RECREATION PROGRAMS UPDATE- Presented by Joe Mobile,
Superintendent of Recreation and Anthony Anaszewicz, Program
Manager, Athletics
VI.LAKEFRONT UPDATE- Presented by Joe Mobile, Superintendent of
Recreation
VII.PARKS UPDATE- Presented by Chuck Myers, Superintendent of Parks, Forestry and
Special Facilities
VIII.VETERANS PARK UPDATE- Presented by Joe Mobile, Superintendent of Recreation
IX.COMMENTS BY DIRECTOR
X.COMMENTS BY BOARD MEMBER
XI.ADJOURNMENT
*ACTION ITEMS
The City of Lake Forest
Parks and Recreation Board
Meeting Minutes
June 16, 2020
REMOTE ACCESS MEETING
I.Call to Order
The Parks and Recreation Board Meeting was called to order by Chairman Paul Best at 6:30p.m. The
following were present via Zoom meeting:
Board Members: Mr. Paul Best
Ms. Nancy Duffy
Ms. Shannon Maguire
Mr. Jared Rhoads
Mr. Marc Silver
Ms. Kaci Spirito
Ms. Melanie Walsh
Staff: Ms. Sally Swarthout, Director of Parks and Recreation
Mr. Joe Mobile, Superintendent of Recreation
Mr. Chuck Myers, Superintendent of Parks, Forestry & Special Facilities
Ms. Dani Spann, Administrative Assistant
Special Guests: Mr. Steve Konters, Hitchcock Design Group
Ms. Bridget Deatrick, Hitchcock Design Group
Foundation Members: Mr. Ara Goshgarian
Mr. Ed Zarek
Mr. Fred Jackson
Mr. Rick Amos
Mr. Patrick Marshall
II.Approval of Minutes
Meeting minutes of the May 19, 2020 Park & Recreation Board Meeting were presented and
approved.
Board member Maguire motioned for approval of the minutes and Board member Duffy seconded.
The minutes were then unanimously approved by roll call with 7 ayes and 0 nays.
III.Opportunities for the Public to Address the Board on Items not listed on the Agenda
No comments
IV.Athletic Fields Feasibility Study Workshop
Mr. Steve Konters started with an update on the study and comprehensive plan. The goal of the
study was to develop a maintenance plan that will aid staff to recognize resources needed to
improve quality of play on the athletic fields. The focus of this meeting/workshop is for a Ctiy-wide
approach with preliminary recommendations and very high level planning. Mr. Konters went over
the background and timeline. A site evaluation with staff and Park Board members was conducted
at each of the parks for athletic field needs.
These preliminary recommendations are very high level. The City wide approach consists of three
levels of improvements. These improvements include:
Improve In-place
Layout Improvements
Sports Complex
Mr. Konters went over each park and their levels of improvement.
Deerpath Park
o Improve In-Place ($359,000 - $440,000)
Create storm water management
Reduce field overlap
Minor grading improvements
Raise center of field and drain south
o Layout Improvements ($1,112,400 - $1,361,800)
Maximize space
Shift baseball fields east
Make more multi space in between
More movement of fields
Regrade and crown field space
Optional facility expansion
o Sports Complex ($9,687,600 - $11,842,600)
Multi use synthetic turf field with lighting
Remove soccer fields in floodway and floodplain
Existing tennis practice court
Restroom and storage building
Regrade and crown field space
Optional facility expansion
Northcroft Park
o Improve In-Place ($58,500 - $73,700)
Restore grass space
Better utilize open space and restripe fields
o Layout Improvements ($949,500 - $1,166,000)
Restore and regrade grass and relocate playground
Regrade and relocate tennis courts
Relocate parking lot
Optional grass soccer field
o Sports Complex ($5,062,500 - $6,194,100)
Multi use synthetic turf field with lighting
Relocate playground
Expand parking lot with two entrances and drop off loop
Regrade and relocate tennis courts
Optional grass soccer field
Townline Park
o Improve In-Place ($18,000 - $22,000)
Complete planned field maintenance of sand grading
Lighting is not an option currently
o Layout Improvements ($675,900 - $827,200)
Regrading and recrowning fields
Amend soil and add underdrainage (only if slit improvements do not
mitigate drainage issues)
Convert to grass infield
Elawa Park
o No changes at this time
Everett Park ($52,200 - $66,000)
o Improve In-Place
Add underdrain and batting cage
South Park
o Continue Master Plan Improvements
o Phase 1 construction in progress
Waveland Park ($577,800 - $710,600)
o Layout Improvements
Turning fields to open more space
Convert fieldhouse to open air structure
Replace swales with underdrain and flatten site
Consider relocating playground to the southeast
Potential tennis court reduction
West Park ($222,300 - $275,000)
o Layout Improvements
Relocate baseball/softball diamond to create additional space
Consider adding coils to ice rink
Eliminate heavy football use
Consider additional parking in north triangle
Mr. Steve Konters went over the cost summaries for each of the three levels of improvement. The
members discussed the direction to move forward with a final plan. Lake Forest Parks and
Recreation Foundation member Patrick Marshall mentioned a big drive for artificial turf and would
like to continue evaluating all options. The topic was mentioned of sharing fields with the High
School or other areas in the community. This could be challenging with all the needs of the other
entities. Board member Maguire asked about looking into environmental aspects such as; solar
lighting, semi permeable green parking, underground water storage. Discussion followed on which
park should receive synthetic turf along with fundraising ideas and community support. There was
small discussion on parks that would have a sports complex and how this would affect the current
park and neighbors. Next steps will include an athletic field assessment report with a series of
options to move forward.
V.Adjournment
Board member Rhoads motioned for adjournment and Board member Duffy seconded. There was a
roll call of 7 ayes and 0 nays. The meeting was adjourned at 8:29p.m.
Respectfully Submitted
Dani Spann
Administrative Assistant
SUBJECT: DEERPATH GOLF COURSE UPDATE
STAFF CONTACT: CHUCK MYERS, SUPERINTENDENT OF PARKS, FORESTRY& SPECIAL
FACILITIES, 810-3565
PURPOSE AND ACTION REQUESTED: Kemper Sports Management Regional Operations
Executive, Vince Juarez, will provide the Board with a verbal report on the golf
course goals, programing, and staffing for the upcoming golf season. This agenda
item is for informational purposes only and no action is being sought.
PARKS & RECREATION BOARD ACTION: No action required. For informational purposes
only.
SUBJECT: SUMMER PROGRAM RECAP AND UPCOMING FALL PROGRAMS HIGHLIGHTS
PRESENTED BY: Joe Mobile, Superintendent of Recreation (847-810-3941)
Anthony Anaszewicz, Program Manager (847-810-3945)
PURPOSE AND ACTION REQUESTED: Staff is providing a status update to the Park and
Recreation Board through a recap of summer programming and a look into our fall
programming.
BACKGROUND/DISCUSSION: As staff were working from home from March 13 - May 31
we faced many challenges. While working remotely, we moved forward with plans for
summer programming keeping the community’s needs in focus as we faced ever
changing regulations from the State in regards to Covid-19. During this time Staff spent
many zoom meetings networking with other neighboring recreation departments and
park districts as to what the regulations meant and how they affected each of us.
Discussions were had specifically identifying challenges and opportunities put forth by
this new environment.
The first decision was how and when to re-open Forest park Beach. Significant damage
from storms and the high water level was sustained over the winter months forcing a
shutdown of the facility. During the closures, staff were able to restore the beach back
to normal and we were able to open as scheduled on Memorial Day weekend.
For the re-opening, Staff implemented many safe practice guidelines including the use
of PPE’s and social distancing, changing roles of some positions, and implementing
some new policies. The beach has successfully remained open and has had a very
successful summer. More information regarding the beach will be presented in a
different presentation.
In June, Staff were allowed to return to the Recreation building on a full time basis to
get ready for the upcoming summer programs. Staff started out working staggered
schedules 2 days a week for half days and progressed each week for the remainder of
the month until we were back to full time in the building.
One of the highlights of the summer was our youth sailing program. Beginning in June,
we offered and continue to offer small group and individual lessons. We also
contracted one of the top laser coaches from US sailing to coach kids in our program.
This was extremely well received and a great addition to our program. When July
started we were able to proceed with our youth sailing programs with our safety
guidelines in place. All programs were a hit with the participants.
The fitness center also started to see some welcomed programming in June as well. We
started offering personal training and outdoor fitness classes during the phase 3
guidelines. We offered many different outdoor fitness classes weekly to our members
and each class was and continues to be well received and full of participants. As the
2
state moved to phase 4 we were able to open the fitness center for our members
based on a lower capacity of 40 members at one time. The Fitness Center is offering a
shortened schedule but the members are happy to be back.
Staff were able to use the state guidelines to offer several summer camp programs. We
started the process in phase 3 where we were limited to groups of 10 and planned
accordingly. As camps approached, the state moved to phase 4 and we were able to
expand our groups from 10 to 15 total per group. The Recreation Department offered 4
different camps with 9 different pods of 13 kids and 2 counsellors. We were able to
accommodate 164 participants this summer.
As our summer programs are coming to a quick end, staff have turned their attention to
the fall. We are planning to offer many of our regular programs but are prepared to
adapt as necessary as the guidelines from the state change or the school districts plans
change. A large part of the fall programming we provide is our community events. We
have had to cancel many of these this summer due to the state guidelines however we
are slowly adapting some events to introduce back to the community beginning in
September.
In response to the Covid-109 pandemic, we have decided to offer a virtual on-line
brochure in lieu of a printed book to enable updates as needed due to the ever
changing circumstances and guidelines. We mailed a post card to all residents letting
them know of the change and highlighting the registration process.
Out of challenge comes inspiration…Staff would like to highlight our new Friday Night
Lights 7 v 7 football program. This adapted program is from our youth tackle football
program that had to be changed when the league we play in decided to cancel the
fall 2020 season. We have seen a large response from the community and already
have over 80 players registered.
Staff are excited and looking forward to the fall this year as we plan to offer many
programs for our residents. We are still a long way from normal but have been
successful in implementing procedures to keep both our staff and participants safe. It is
great to see the energy back in our facilities and parks as we do what we do best,
meet our community’s needs through programming.
BUDGET/FISCAL IMPACT: N/A
BOARD ACTION: No action requested at this time.
SUBJECT: 2020 BEACH UPDATE
PRESENTED BY: Joe Mobile, Superintendent of Recreation (847-810-3941)
PURPOSE AND ACTION REQUESTED: Staff is providing a status update to the Park and
Recreation Board on the 2020 summer beach operating season
BACKGROUND/DISCUSSION: Staff were delighted to open the beach on schedule for
the 2020 Memorial Day weekend after the tough winter storms that caused damage on
several occasions throughout the winter as well as the outbreak of the Covid-19
pandemic. Staff spent many hours at the lakefront cleaning and repairing damage
from the record high water levels and the winter storms. Thanks to their commitment
and determination the beach was able to open to the public as scheduled.
After coming off continuous summers with closures and policy changes staff were
hoping for a somewhat normal summer. That wasn’t the case once our environment
changed due to Covid-19. Due to the pandemic, staff was once again forced to
adapt and change to provide a safe beach season for our community. Staff
implemented guest procedures based on the state guidelines and recommendations.
All visitors were encouraged to use PPE when unable to social distance appropriately as
well as social distance their groups while using the facility. Staff established a new
capacity limit for the beach and monitored attendance each day. Signage was
posted throughout the facility to remind our visitors to follow the guidelines. To help
promote further social distancing, decisions were made to close the boating center
and not rent the pavilions for the summer as well. Staff also limited the field trips to the
beach and didn’t install the shower towers. Additional staff was also hired to help
manage the facility and access by all visitors. All of these methods allowed our residents
to enjoy the lakefront all summer long. We have had 106,335 visitors to our lakefront
through 8/9/20.
In addition to the guidelines, staff amended the non-resident beach access fee. Non-
resident visitors are now being charged daily from 9:00 a.m. – 9:00 p.m. at a rate of $25
per visitor. To help with contact and sanitation staff only accepts credit cards for this
transaction. As of 8/9/20 we have had 2916 non-resident guests translating to $72,900 in
revenue thus far.
The south end of the lakefront has also been extremely busy. We have been able to
offer our sailing camps, individual and small group lessons as well as race team
coaching this summer and all programs have been well received by our sailing
community. The boat launch has been busy this summer as well. We have had 980
total launches from the crane, boat launch and the sand this summer already. With a
few nice months remaining this season we are confident we will continue to see high
usage of the facility.
As you can see, the staff have done an excellent job and the beach has successfully
remained open and has had a very successful summer.
2
BOARD ACTION: No action requested at this time.
SUBJECT: PARKS UPDATE
STAFF CONTACT: CHUCK MYERS, SUPERINTENDENT OF PARKS, FORESTRY& SPECIAL
FACILITIES, 810-3565
PURPOSE AND ACTION REQUESTED: Chuck Myers will provide the Board with a report on
projects currently underway and some of the ongoing planning for future projects. This
agenda item is for informational purposes only and no action is being sought at this
time.
BACKGROUND/DISCUSSION: The Parks Section currently has a number of project
underway or that are scheduled to begin soon. Many of our projects have been
delayed by the challenging circumstances created by the Covid 19 pandemic;
however, progress is being made and many of our projects are expected to be
completed on schedule. The following is a brief update on some of our projects,
followed by a preview of some of the planning underway for future projects.
South Park Improvement Project: Construction is well underway at South Park and we
are looking forward to offering residents a beautifully designed park full of amenities for
everyone to enjoy. The exciting additions and changes taking shape over the next few
weeks are expected to be done on schedule, by the end of September. Once
completed, park amenities will include walking loop trail connecting all amenities to
parking lots and neighborhood sidewalks, an outdoor fitness station, basketball court,
new tennis/pickleball courts, batting cage, and a bocce court. A new parking lot will
replace the existing entrance/parking lot that is adjacent to the playground. The new
lot will hold twenty vehicles and will drain into a rain garden feature. Some highlights of
recently completed work include:
● Asphalt has been completed for the new tennis and basketball courts, as
well as some of the new trails around the park.
● Concrete curbing is now complete for the bocce ball court and the
fitness station. Most of the concrete walkways have also been completed.
● Most of the grading and drainage for the park improvement area is
complete (excluding the new parking lot area).
● Excavation and grading is now underway for the new 20 stall parking lot
with adjacent rain garden.
● The fitness equipment has been installed, as well as fencing for the tennis
and basketball courts.
● Tennis/basketball court surfacing (color coating) of courts will begin soon,
and the parking lot will begin to take shape.
Waveland Park Tennis Court Resurfacing: This project involves the resurfacing and color
coating of three tennis courts and one basketball court. We have a contract with U.S
Tennis Court Construction Company (the same company doing the new South Park
tennis courts) to perform the work. We have added color coating of the courts to allow
for pickleball play. The work is scheduled to start near the end of August and expected
to be competed in approximately two weeks.
West Park Sidewalk Addition: A new sidewalk connection has been added to the west
side of West Park and goes from the pavilion/playground/tennis court area to the
existing sidewalk that runs along Green Bay Road. The new sidewalk will provide an
ADA accessible connection to park amenities. This does not replace the previously
discussed capital project in our CIP, that provides for new sidewalks on the north and
east side of the park.
Planning for Future Projects: There are currently a number projects in the planning stage
that will be coming back to the Park Board for discussion in the coming months. Much
of the focus is currently on Forest Park and the lakeshore issues. The lakeshore erosion
issues on the beach that are associated with historically high lake water levels and the
intensity of storms has necessitated that we take a closer look our lakeshore. We are
considering a large study by an engineering firm that would look at our current beach
condition as well as develop a long-term monitoring and maintenance plan.
The City is currently contracted with Hey & Associates, a professional engineering,
ecological consulting, and landscape architecture firm, to provide bluff pre-design
services and three years of bluff monitoring at Forest Park. The study involves
geotechnical assessments, survey monitoring of the movement areas, bluff condition
observations, slope stability review, slope condition evaluation, and a feasibility study
that will identify restoration concepts with accompanying cost estimates. Hey &
Associates will be presenting City staff with the preliminary pre-design findings in the
next few weeks.
A final project of note that is in the planning phase is the Forest Park boardwalk/path
replacement. As you are aware, the boardwalk was removed two years ago after it
was discovered that the land movement along the bluff had damaged the aging
boardwalk structure. At that time staff elected to leave the wooden steps on the far
south end of the boardwalk to provide access down to the beach. Earlier this summer,
staff observed damage to the remaining steps due to further shifting of the land mass
near the steps, and decided to close the steps indefinitely. The result of the closure
leaves us with only one pedestrian passage from the Forest Park tableland to the
beach, which is the concrete steps at the center of the Ring Road (the Belvedere). Staff
is considering options for additional pedestrian access to the beach would provide a
safer pedestrian walkway and be ADA compliant.
PARKS & RECREATION BOARD ACTION: No Action required. For informational purposes
only.
SUBJECT: VETERANS PARK IMPROVEMENT PROJECT INFORMATIONAL PRESENTATION
PRESENTED BY: Joe Mobile, Superintendent of Recreation (847-810-3941)
PURPOSE AND ACTION REQUESTED: Staff is providing a status update to the Park and
Recreation Board on the Veterans Park Improvement Project.
BACKGROUND/DISCUSSION: Veterans Park is a 1.3 acre park located at the intersection
of Deerpath and Green Bay Road. The City of Lake Forest acquired Veterans Park
through a land transfer agreement with Lake Forest Open Lands Association in January
of 2016. Soon after, the City began the process of developing a plan for the new Park,
which included community input forums. The City then hired Craig Bergmann Design
Group to analyze the data collected and design a conceptual plan for the new park.
The goal of the project is to develop a passive, open space which serves as a gateway
park and leads residents and visitors into the Central Business District. It is also a goal to
develop a park that will provide opportunities to achieve a balance between the
recreational use and the protection and interpretation of the cultural, natural and
scenic resources of the park.
Some of the key new elements of the park include:
1.New entrance to the park – The intersection corner will be opened up with two
new entrances to the park. The entrance will feature a new flower bed planted
with annuals with a flag pole to mimic the one at City Hall. The new wall will have
the name of the park facing the intersection with plaques for the military
branches on the back side of the planted area.
2.Natural performance platform – An elevated natural grass area for bands to
perform or for a movie screen to be placed for events. It will be located in the
middle of the park off of walkway.
3.Natural walking path – Walking path through the wooded area on the east side
of the park. This area will be a natural planting area with both seed and plugs.
4.Musical Instruments – Outdoor musical instruments will be placed along the
natural walking path for use by the residents (not included on this bid proposal).
5.Plantings – Additional trees and shrubs will be planted throughout the property to
replace some that have been removed. There will be a focus on planting native
species.
6.Cobblestone walks – The existing walkways will be retained in the park; however,
a new walkway will be completed from the new entrance to the existing
walkways. In addition, safety lighting will be added to the walkways.
Once the conceptual plan was completed and shared with the community in August
2019, staff met with Craig Bergman Design Group to finalize the plans. Both sets of plans
2
were amended and submitted back to Staff with a specification list to solicit bids for the
construction of the project. On July 1, 2020 staff issued a request for bids for the project
with a bid opening on July 22, 2020. Staff received six (6) bids for the project ranging in
costs from $484,698 – $931,115. Staff evaluated all of the bid submittals and decided
that since all of the bids were over budget the best plan moving forward was to reject
all bids and go back out to bid in January 2021. Staff will take the available time to
refine and edit the bid packet, evaluate the specification list and secure additional
funding for the project now that we have up to date cost estimates.
The new time line for completion of the Veterans Park Improvement Project will begin in
January with staff soliciting bids from potential business. The bid opening will be held in
late January with the actual project beginning in early March. Staff are optimistic that
we can still meet the project completion date of Memorial Day 2021. If something
delays the project then staff would open the park on the Fourth of July.
PROJECT REVIEW/RECOMMENDATIONS:
Reviewed Date Comments
HPC 6/24/20 Certificate of Appropriateness granted
Park Board 10/15/19 Approve $100,000 funding from PPL
Community Viewing of Plan 8/15/19 Community rollout
Park Board 12/4/18 Name approval
Park Board 10/16/18 Approve $200,000 funding from PPL
Park Board 10/17/17 Approve $200,000 funding from PPL
BUDGET/FISCAL IMPACT: The balance of the approved $500,000 budget for the project
is $477,100. Staff will further evaluate the bid submittals and return to the Board at a
future meeting to secure the additional funding necessary to complete the project in
2021.
Below is an estimated summary of Project budget:
FY2021 Funding Source Amount
Budgeted
Amount
Requested
Budgeted?
Y/N
Park and Public Land Fund $477,100 Y
BOARD ACTION: Veterans Park Improvement Project Informational Presentation. No
action requested at this time.