PUBLIC WORKS COMMITTEE 2017/01/04 PacketPUBLIC WORKS COMMITTEE MEETING
WEDNESDAY, JANUARY 4, 2017 – 7:00 P.M.
MUNICIPAL SERVICES – LOWER LEVEL TRAINING ROOM
AGENDA
I. ROLL CALL/CALL TO ORDER
Cathy Waldeck, Chairman
Stanford Tack
Michelle Moreno
Timothy Newman
II.APPROVAL OF THE DECEMBER 5, 2016 PUBLIC WORKS COMMITTEE MEETING
MINUTES
III.REVIEW AND RECOMMENDATION TO CITY COUNCIL OF WINWOOD’S SANITARY
SEWER PROJECT APPROACH: NOT PROCEED, SINGLE SSA, RECAPTURE, CODE
AMENDMENTS – MIKE STRONG & MICHAEL THOMAS
IV.REVIEW AND RECOMMENDATION TO CITY COUNCIL OF WINWOOD SANITARY COST
CONSIDERATIONS: COMPLETE RESURFACING OR SPOT ASPHALT PATCHING – MIKE
STRONG & MICHAEL THOMAS
V. REVIEW AND RECOMMENDATION TO CITY COUNCIL OF A HARDSHIP WAIVER
PROCESS FOR THE SANITARY SEWER ORDINANCE – MIKE STRONG & MICHAEL
THOMAS
VI.UPDATE ON SECURING THE WINWOOD SANITARY SEWER PROJECT EASEMENTS –
MIKE STRONG & MICHAEL THOMAS
VII.REVIEW AND RECOMMENDATION TO CITY COUNCIL OF THE CONSTRUCTION
ENGINEERING AGREEMENT FOR INTERIOR WORK AT THE EAST SIDE TRAIN STATION –
MIKE STRONG
VIII.NEXT MEETING – JANUARY 17, 2017 5:00 P.M. @ CITY HALL
IX.ADJOURNMENT
PUBLIC WORKS COMMITTEE MEETING
MONDAY, DECEMBER 5, 2016 – 5:00 P.M.
CITY HALL – COUNCIL CHAMBER’S CONFERENCE ROOM
MINUTES
I. ROLL CALL/CALL TO ORDER
Chairman Cathy Waldeck called the meeting to order at 5:00 p.m. Aldermen
Michelle Moreno and Timothy Newman were present. Alderman Stanford Tack
arrived at 5:30 p.m.
Staff in attendance included Michael Thomas, Director of Public Works; Bob Kiely,
City Manager; Bob Ells, Superintendent of Engineering; Dan Martin,
Superintendent of Public Works; Dave DeMarco, Supervisor of Fleet
Maintenance; Elizabeth Holleb, Director of Finance; Mike Strong, Assistant to the
City Manager; and Jim Lockefeer, Management Analyst.
Also in attendance was Prue Beidler – First Ward Alderman; Bill Weaver – AECOM;
and resident Paul Hamann of 511 Beverly Place.
II.APPROVAL OF THE NOVEMBER 7, 2016 PUBLIC WORKS COMMITTEE MEETING
MINUTES
Chairman Waldeck moved to approve the November 7, 2016 Public Works
Committee meeting minutes. Alderman Newman seconded the motion, which
carried unanimously.
III.DISCUSSION OF HARDSHIP WAIVER PROCESS FOR THE SANITARY SEWER
ORDINANCE
Assistant to the City Manager Strong explained the Public Works Committee
discussed this topic in 2015. Approximately 115 properties within The City of Lake
Forest are currently utilizing septic systems. After the Regency SSA project was
completed and upon completion of the Winwood SSA, approximately 60
properties on septic throughout Lake Forest, will be within 500 ft. of sanitary
sewer. Under current ordinance when their septic system fails they are required
to connect to sanitary sewer. There are also approximately seven properties on
septic that are outside the 500 ft. and they would not be required to connect
under the current ordinance.
Assistant to the City Manager Strong explained the purpose of this agenda item
is to discuss if there is potential to consider a hardship waiver process for the
sanitary sewer ordinance. A letter from a resident in Winwood was included in
the Committee’s packet requesting waiver from the Winwood SSA project due
to their hardship. Currently the existing sanitary sewer ordinance does not include
a hardship waiver process. If the Committee felt it were appropriate to create a
more formal hardship waiver process, the code could be modified to establish
standards to examine and determine hardships.
Alderman Newman explained that the City Attorney, Vic Fillippini, still needed to
explain what would happen if a homeowner within an SSA was granted a
hardship waiver. Alderman Newman asked if they would they still be included in
the SSA project area.
Chairman Waldeck explained that having a waiver process was a good thing.
She believed that the process should not be too precise and that instead each
waiver applied for should be taken on a case by case basis.
Assistant to the City Manager Mike Strong stated that if homeowners within the
SSA project were required to connect they would need to be included in the SSA
project area. He explained that if a hearing process was to be a part of the
hardship waiver process, the Committee could also make the determination to
include that property in the SSA area or not.
Public Works Director Michael Thomas explained that after the 60 day objection
period it will have to be known how many properties will be included in the
Winwood SSA project. Therefore, staff envisions hearing the appeal in January at
a Public Works Committee meeting. Assistant to the City Manager Strong
explained that if a hardship waiver process is approved and if the homeowners
appeal is granted, then there is still time to amend the SSA project area. He then
stated if the Committee would like to proceed staff would work with the City
Attorney to modify the ordinance to include a hardship waiver process. That
would then be brought back to the Committee for their review at their next
meeting. If approved that resolution would then be brought to the January 17,
2017 City Council Meeting.
City Manager Robert Kiely explained that if a resident was granted a waiver due
to a hardship, they would not be required to connect to sanitary sewer. He
stated that it was important for the Committee to also consider a recapture
process for properties within an SSA that were granted waiver if they wanted to
connect to sanitary sewer at some point in time.
Alderman Moreno explained she had concerns with granting a hardship waiver if
the property could be subdivided in the future. She stated that language
needed to be included in the ordinance that required connection and
recapture if this were to occur.
Chairman Waldeck stated the Committee previously discussed having a special
meeting devoted to the Winwood SSA neighbors. She explained that having this
meeting would be a good idea to devote more time to answering the residents’
questions.
Alderman Newman inquired about the sale of properties granted the hardship
waiver. City Manager Kiely explained that the waiver would be filed with Lake
County and that potential buyers would be aware of that.
Director Thomas explained that the revised ordinance would be brought back to
the Committee with the addition of the hardship waiver process and that the
Committee would need to meet with the resident who has already claimed
hardship. He also stated that a special meeting would be coordinated for the
homeowners within the Winwood SSA. Director Thomas explained all of this
would be coordinated for some time in January.
IV.REVIEW AND RECOMMEDNATION TO THE CITY COUNCIL OF AN AGREEMENT
TO PROVIDE AN UPDATE TO THE FOREST PARK BLUFF STABILITY EVALUATION
Superintendent of Engineering Bob Ells introduced Bill Weaver, Senior Engineer
with AECOM. AECOM completed the 2009 study for the Forest Park Bluff Project
and consulting for the South Beach Access Road in 2011. Most recently AECOM
completed the slope stability analysis for the southern portion of the South Beach
Access Road that is experiencing the failure today.
Superintendent Ells explained that on the committee’s agenda is a request to
expand the study of the South Beach Access Road. During the discussion about
the design to repair the bluff adjacent to the South Beach Access Road at the
Finance Committee Capital Budget Workshop on November 14, 2016, it was
recommended by the Committee to examine the rest of the Forest Park Bluff to
see if there any other areas that need work so that all possible work could be
combined into one construction project. In the past the Forest Park from north to
south has been examined and fixed in sections rather than examining the area in
its entirety. Mr. Ells explained that staff provided two proposals for the
committee’s review; one from AECOM and the other from the Ciorba Firm.
Alderman Biedler inquired about when Forest Park Drive was closed.
Superintendent Ells explained that it was closed for the 1999 improvements.
Alderman Biedler inquired if the circumstances to that project were similar to the
proposed project today. Superintendent Ells responded that the project would
be very similar.
Director Thomas added that the North Shore Sanitary District installed a large
basin in the South Beach Parking Lot. This brought a lot of semi and truck traffic
that road typically never experiences. He also explained there have been three
water main breaks on the South Beach Access Road. Chairman Waldeck
inquired about the North Shore Sanitary District’s involvement and interest with
the current project. Director Thomas explained that Tom Swarthout of the North
Shore Sanitary District will be a part of the Bluff Stability Workgroup.
Alderman Moreno inquired about AECOM’s past experiences working with bluffs.
Superintendent Ells explained that AECOM has completed three similar studies
within The City of Lake Forest. Bill Weaver explained that AECOM has done a very
large amount of bluff and costal engineering around Lake Michigan.
Alderman Beidler inquired about Ciorba and their experience. Superintendent
Ells explained that The City of Lake Forest has never worked with the firm before.
Director Thomas explained staff is recommending AECOM because of the past
work they have completed in Lake Forest and that the base line data they have
already collected in past studies will assist them in this analysis. Alderman
Newman also noted that AECOM provided a lower bid.
Director Thomas explained that AECOM, after completing the study, would meet
with the Bluff Stability Work Group. AECOM would present the findings and
prioritize those sections of the bluff that need work.
Chairman Waldeck inquired about staff’s recommendation to use a different
firm then AECOM for design of the project. Alderman Newman explained that it
made sense that after the results of AECOM’s study were presented, that there
would be a bidding process for the final design. Both Chairman Waldeck and
Alderman Newman explained that they would not want to exclude AECOM
from being considered for completing the final design. Alderman Newman
inquired about dividing the project into three separate categories: evaluation,
design, and construction (all separate contracts). Director Thomas confirmed this
approach. Director Thomas noted that design of the project is going to take at
least two to three months. Upon completion of the design, if the City was to use
Motor Fuel Tax Funds to pay for a portion of the repair, the City would need to
secure approval from IDOT to use such funds on this project.
Alderman Moreno inquired about snow removal in the area. Director Thomas
explained that the area on South Beach Access Road AECOM has already
identified as a high priority has been tarped to keep as much water as possible
off of it. The “Ring Road” in Forest Park is closed to the public during snow storms
so that it can be properly broomed / swept after the storm. Alderman Moreno
inquired about taking any additional safety measures. Bill Weaver explained that
channeling people onto the other side of the road that is not having problems
would be a good thing. Director Thomas explained that there have been
barricades and cones in that area doing so.
Resident Paul Hamann of 511 Beverly Place inquired about the trees removed on
the bluff. He stated that a lot of trees have been removed from the bluff. He
requested that when AECOM conducts the study that root structure is
considered.
Director Thomas asked Bill Weaver to explain if trees help or hurt the current
situation. Bill Weaver explained that trees do help by keeping some rain water off
the slope and also absorb some of the water. However, the root structure of the
trees can also be an issue. Often smaller vegetation has deeper root structures.
Trees can block sunlight that is necessary for that smaller vegetation to get
established. Bill Weaver stated that it depends on slope steepness. Bill Weaver
concluded that trees are not a primary reason for a bluff failure but are a factor.
Chairman Waldeck moved to direct City staff to bid the design phase of the
project out. Alderman Moreno seconded the motion which carried
unanimously.
City Manager Kiely asked the Committee if they would like Bill Weaver to stay for
the City Council meeting or if he could be dismissed. The Committee stated that
Bill Weaver could be dismissed.
V. REVIEW AND APPROVAL OF THE DRAFT F.Y.’18 CAPITAL EQUIPMENT PLAN
Chairman Waldeck noted that the Committee could examine each piece of
equipment one by one or if anyone had any specific question about a specific
piece in particular.
Chairman Waldeck noted that a list is included in the packet noting each piece
of equipment utilized by a specific Department. The pieces are listed by year,
make, and model and provide an estimate fiscal year and amount of
replacement. The Committee requested that Director Thomas go over and
summarize the program.
Director Thomas began by noting that there were no police cars being
recommended for replacement in FY ’18. He noted that a 20-year old street
sweeper and sewer vacuum machine are in need of replacement. Director
Thomas explained that staff, per the guidelines noted in the purchasing directive,
is seeking pricing from either NJPA (National Joint Purchasing Alliance), National
IPA, State Bid, or the Northwest Municipal Conference for a majority of the FY ’18
equipment. If pricing is available, the City uses these purchasing avenues that
are each bid out individually and follow all public sector bidding requirements.
Director Thomas explained the City is able to realize even larger cost savings
because these agencies and organizations submit their bids based upon selling
higher quantities of equipment. Director Thomas explained that the state bid
process typically offers the best pricing however this year, like many recent years,
the state has no money to purchase capital equipment. If the Committee
approves the draft list of FY ’18 equipment, City Council will begin to see the
equipment for approval in January, February, and March. This simply allows staff
to order the equipment; no equipment will physically be received until May 1st of
after.
Director Thomas then introduced the City’s Supervisor of Fleet, Dave DeMarco
who was present to help answer any questions the Committee has.
Alderman Moreno inquired about any surprises in regards to equipment.
Supervisor of Fleet, Dave DeMarco, explained that in general there were not.
Director Thomas explained that he and the Fleet Supervisor spend quite of bit of
time researching, reviewing and developing specifications to ensure high quality
items are purchased and that they will last for a long time.
Chairman Waldeck explained that she liked the change of the parking
enforcement scooter to electric. Director Thomas explained that the City’s
Sustainability Plan encouraged staff to look at green alternatives.
Alderman Moreno inquired about specialty equipment and if something was
being purchased above and beyond a standard piece of equipment. Director
Thomas explained that there was not any specialty equipment included in the FY
’18 list.
Alderman Moreno inquired about equipment rust. Director Thomas explained this
occurs because of salt. He explained that the City does purchase stainless steel
equipment when possible and also coats the underbodies of new equipment to
help prevent rust.
Alderman Newman made a motion to approve the F.Y.’18 Capital Equipment
List. Chairman Waldeck seconded the motion which carried unanimously.
VI.REVIEW OF 2016/2017 SNOW & ICE CONTROL PLAN
Chairman Waldeck explained that the Public Works Committee receives and
reviews the plan every year. She inquired if anything in this year’s plan has been
changed from the previous year. Director Thomas explained that nothing has
been changed since last year. Director Thomas explained the importance of the
overnight crews and multiple shifts in allowing the Public Works Department to
stay on top of snow events. Superintendent of Public Works, Dan Martin, added
that the overnight crew, working on straight time, primarily assists with hauling
snow out of the CBD and parking lots, and addresses “hots spots” (ice, piles on
corners) around town.
Chairman Waldeck inquired about sidewalk plowing and explained that she
believed the City could be doing a better job. She explained that she receives
numerous complaints every year. She stated that in her neighborhood ice forms
under the snow in sidewalks. She inquired about getting to the sidewalks sooner.
Director Thomas explained is that it is very challenging to do so. Once the
sidewalks freeze it is very challenging to get them clear and scraped. In order to
stay on top of the sidewalks the Public Works Committee would need modify the
snow plan’s priorities and elevate sidewalk plowing / brooming to the same level
as streets. Director Thomas added the current sidewalk equipment is not in good
condition. The equipment works but it is slow and breaks down frequently. He
said that the equipment replacement plan calls for replacement of some of the
sidewalk equipment to occur in FY ’19. Alderman Moreno explained that
drainage is also a factor. Sidewalks do not have the same type of drainage
streets have which is why they freeze. Alderman Moreno explained that because
of this she felt it was better to not plow the sidewalks at all. Chairman Waldeck
explained it would be nice if homeowners took responsibility and shoveled the
sidewalks in front of their homes. Director Thomas explained that in March of 2014
a survey was issued asking residents if the City should adopt an ordinance
requiring homeowners to shovel sidewalks. The results strongly opposed that idea.
Alderman Moreno explained that she felt as long as the CBD’s were shoveled
and the other areas (where there is high foot traffic) were being cleared that
was good enough. Alderman Newman raised the question if sidewalks should be
plowed at all and at what point does the Committee reconsider that level of
service.
Director Thomas concluded that the City has a 110 miles of sidewalks. About half
of them are being broomed down to bare concrete and the other half is being
plowed; plowing leaves less than an inch of snow on the sidewalks
VII.NEXT MEETING – January 4, 2016 – City Hall
Chairman Waldeck explained that in addition to the regular Public works
Committee meeting scheduled in January, a separate Winwood Meeting will
also need to be scheduled. Director Thomas explained that it would be
preferable to schedule the regular meeting during the first week of January.
Chairman Waldeck explained that the Winwood meeting should be the
following week. The Winwood meeting would be January 11 at the Municipal
Services Building.
VIII. ADJOURNMENT
Chairman Waldeck moved to adjourn the meeting of the Public Works
Committee at 6:02 p.m. Alderman Newman seconded the motion, which
carried unanimously.
Respectfully submitted,
Jim Lockefeer Jr.
Management Analyst
REVIEW AND RECOMMENDATION
TO CITY COUNCIL OF
WINWOOD’S SANITARY SEWER
PROJECT APPROACH: NOT
PROCEED, SINGLE SSA,
RECAPTURE, CODE AMENDMENTS
Discussion on Sanitary Sewer
Policy and Code
Public Works Committee
January 4, 2017
Current City Policy and Purpose of
Tonight’s Discussion
•It is the desire of the City of Lake Forest to maintain and
extend sanitary sewer service to satisfy existing and future
needs of the community
•Code §150.384
•City’s Comprehensive Plan – Updated 1998
•Public Works Committee Discussions in March 2015
•Purpose of Tonight’s Discussion: Staff is seeking guidance
from the Committee on how to proceed under the existing
policy and Code as it relates to the Winwood Drive
neighborhood, and the remaining areas of the City that do
not have access to sanitary sewer.
History of Sanitary Sewer
Installations in Lake Forest
•The City has been utilizing special assessments or special
service areas to install sanitary sewers in non-sanitary sewer
areas throughout the Community since 1922
•Since 1996; there have been seven (7) special service areas
(SSA’s) that have installed sanitary sewers providing sewer
access to 88 properties collectively
•Public Works Committee revisited and affirmed the existing
Policy and Code in March 2015
Total Properties with a Septic System
Group/Category Description/Area
Required to Connect
Under Existing Code Total Properties
Accessible
Properties
Properties are provided
direct access to, and/or
abut an existing public
sanitary sewer
Yes 60
Adjacent
Properties
Properties are located
within 500 feet of an
existing public sanitary
sewer
Yes 27
Isolated Properties Properties are not
located within 500 feet
of an existing public
sanitary sewer
No 28
(21 of them are
located in the
Winwood Drive
neighborhood)
Total 115 Properties
Current Winwood Drive Concerns
•Eight (8) properties have cross-connections to the City’s storm
sewer. Pollutants (fecal coliform) were found in storm water
samples that were collected and tested by Public Works’
Water & Sewer Section for effluent “downstream” from
Winwood Drive.
•There are seven (7) accessible or adjacent properties (within
500’ of a sanitary sewer) that are not connected to sanitary
sewer.
Confirmed Overflow Connections to
Storm Sewer
Property with Septic System
Confirmed Septic System Overflow Cross Connection to Storm Sewer
Current Accessible or Adjacent
Properties (w/n 500’ of sanitary sewer)
Property with Septic System
Properties located within 500’ of Existing Sanitary Sewer (Accessible and/or Adjacent properties)
Location of Possible Sanitary Sewer Extension
Phased Approach to Adjacent and Accessible
Properties
1
2 3
4
Potential Approaches for
Winwood Drive
Option 1 – Do Nothing
(Status Quo)
Staff does not recommend this option based on past
precedent and current issues concerning the Winwood
Drive neighborhood
Option 2 – Special Service Area
(“SSA”) or “Pay over time”
approach
This approach is currently under investigation and has been
proposed for the Winwood Drive neighborhood
Option 3 – Recapture or “Pay
Later” approach
Option 4 – Clarify City Code to
reflect future connection
requirements
A. For properties within 500’ of an existing sanitary sewer : Would require connection if:
1. Property has a confirmed cross connection to storm sewer and the septic
system is in need of a major repair or replacement; or
2.There is demolition and new development on the site; or
3. An addition or alteration is proposed on the site that increases
square footage of home by more than 1,000 sq. ft.
B. For properties beyond 500’ of an existing sanitary sewer: A replacement septic system or
repair permit may be issued under the following additional conditions:
1. Properties with confirmed cross connections to storm sewer would be
required to disconnect from them; and
2.Property Owner would be required to provide a signed irrevocable
consent letter supporting any future SSA project.
Additional Considerations
1.Statement or covenant recorded against all accessible, adjacent, and
isolated properties?
2.Economic hardship or unusual and compelling circumstance process for
requesting exemptions from future requirements to connect
3.Permitting for repair, alteration, addition and/or replacement of septic
systems in the City
Committee Discussion &
Questions
How shall the City proceed with the pursuit of public sanitary sewer in the
Winwood Drive neighborhood?
1.Do Nothing
2.Pursue a Special Service Area or “Pay over time” approach
3.Pursue a Recapture or “Pay later” approach
4.Clarify the City Code to reflect future sewer connection requirements
5.Other?
Phased Approach to Adjacent and Accessible
Properties
1
2 3
4
Financial Considerations
Strategy Options Do Nothing1 Recapture SSA
Code
Amendments
Project Costs - $1,373,327 $1,378,327 -
Cost per lot (prepaid) - - $49,226 -
20-year cost per lot - $66,179 $66,420 -
Annual Assessment per lot - - $3,321 -
Average Additional Private
Costs for Connection - $15,000 $15,000 -
Potential Investment (2017) $500 $81,179 $18,321 $500
Over 25 Years $53,000 $85,000 $85,250 $53,000
Over 50 Years $68,000 $88,850 $89,100 $68,000
Over 75 Years $140,000 $92,750 $93,100 $140,000
Over 100 Years $155,000 $96,500 $96,750 $155,000
1Assumes Septic System will need to be replaced twice over next 100 years
REVIEW AND RECOMMEDNATION
TO CITY COUNCIL OF WINWOOD
SANITARY COST
CONSIDERATIONS: COMPLETE
RESURFACING OR SPOT ASPHALT
PATCHING
WINWOOD SANITARY COST CONSIDERATIONS:
COMPLETE RESURFACING OR SPOT ASPHALT
PATCHING
Public Works Committee
January 4, 2017
Winwood SSA – Cost Considerations
Street Resurfacing Options for Winwood Drive
Option
Patching
Costs
Resurfacing
Costs Total
Option A –
Patch Only
$40,000 $0 $40,000
Option B –
Patch & Resurface
$40,000 $88,000 $128,000
Resurfacing vs. Patching
Total Patching & Resurfacing Costs
Based on Engineering Estimate of Probable Costs dated 9-14-16
Item # Description Qty. (Unit) $/Unit Total
COSTS UNDER OPTION A:
Resurfacing - Private Drive
10 Hot-Mix Asphalt Binder Course 123 $85.00 $10,455.00
11 Hot-Mix Asphalt Surface Course 245 $95.00 $23,275.00
12 Hot-Mix Asphalt Surface Removal (3”) 2,145 $7.50 $16,087.50
$49,817.50
Patching – Winwood Drive
25 Class D Patches 360 $110.00 $39,600.00
Subtotal for Option A $89,417.50
ADDITIONAL COST WITH OPTION B:
Resurfacing - Winwood Drive
10 Hot-Mix Asphalt Binder Course 217 $85.00 $18,445.00
11 Hot-Mix Asphalt Surface Course 435 $95.00 $41,325.00
12 Hot-Mix Asphalt Surface Removal (3”) 3,800 $7.50 $28,500.00
Subtotal for Option B $88,270.00
Total for Options A + B $177,687.50
Resurfacing vs. Patching
Private Drive (2,145 sq. yd.):
Patch & Resurface: $50,000
(Included in Project)
Public Street (3,800 sq. yd.):
Patch & Resurface: $128,000
Patch Only: $40,000
Project Area (SSA)
Potential Winwood Drive Resurfacing Impact on
Special Assessment
Cost Item No Resurfacing With Resurfacing
Administrative, Legal and Easement
Acquisition Fees
$12,000 $12,000
Design engineering (Phase I-II) $37,500 $37,500
Construction Engineering (Phase III) $81,000 $81,000
Construction $1,029,570 $1,117,570
Construction Contingency $101,575 $110,257
City of Lake Forest Permit Fee ($825 + $1/ln. ft.) $0 (Paid by Owner
at time of
Connection
$0 (Paid by Owner
at time of
Connection NSWRD Connection Fee ($3,248)
NSWRD Annexation Fee – N/A $0 $0
Bond Issuance Expenses $20,000 $20,000
Total Project Cost Estimate $1,281,645 $1,378,327
Total Cost Per Lot (if Pre-Paid) $45,773 $49,226
Total Cost Per Lot (with Financing) $61,761 $66,420
Annual Cost Per Lot $3,089 $3,321
Patching vs. Resurfacing Recommendation
•Options to consider:
1.Both patching and resurfacing expense included in SSA
cost (estimated at $128,000)
2.Only patching expense included in SSA cost (estimated
at $40,000)
3.If Winwood Drive is to be resurfaced, how will it be paid
for?
Questions
REVIEW AND RECOMMEDNATION
TO CITY COUNCIL OF A
HARDSHIP WAIVER PROCESS FOR
THE SANITARY SEWER
ORDINANCE
(Please note material will be sent under a separate cover)
UPDATE ON SECURING THE
WINWOOD SANITARY SEWER
PROJECT EASEMENTS
(No Attachments - Verbal Report Only)
REVIEW AND RECOMMENDATION
TO CITY COUNCIL OF THE
CONSTRUCTION ENGINEERING
AGREEMENT FOR INTERIOR WORK
AT THE EAST SIDE TRAIN STATION
MEMORANDUM
THE CITY OF LAKE FOREST
OFFICE OF THE CITY MANAGER
Page 1
TO: Chair Catherine Waldeck and members of the Public Works Committee
CC: Michael Thomas, Director of Public Works
FROM: Mike Strong, Assistant to the City Manager
DATE: December 30, 2016
SUBJECT: Construction Engineering Agreement for Interior Improvements at East Train
Station
PURPOSE AND ACTION REQUESTED:
Staff is requesting approval of a resolution committing to the expenditure of City funds for the
interior renovation of the Lake Forest Metra Station – Union Pacific North Line facility main
depot building in downtown Lake Forest. Staff also requests approval for the Mayor to execute
the required agreements for Phase III construction engineering services and the Local Agency
Agreement between the City and the Illinois Department of Transportation (“IDOT”) for this
stage of the project.
BACKGROUND/DISCUSSION:
The City has received ITEP grants, administered by IDOT, totaling over $2.07 million for this
project. The ITEP grant program offers an 80/20 grant, meaning the City is reimbursed 80% for
every dollar that is spent on projects funded by the program. In addition to these funds, the City
and Metra will have contributed a combined total of roughly $764,000 to the project when it is
complete. Due to the costs associated with the work, the City has opted to complete the Project
in separate stages, as outlined below:
Stage 1 – Restoration of the roof consistent with the original design of the train station,
to include slate, restoration of dormers, and hipped roof elements, and removal of non-
architecturally significant features.
Stage 2 – Restoration and repair of the exterior wood and stucco, and masonry.
Stage 3 – Interior renovation of restrooms, new tile flooring, fire protection, minor
electrical and mechanical upgrades, and other commuter comfort and station
enhancements.
The first two stages of the Project have been completed, with the roof replaced in 2012, and the
exterior restoration finished this past fall.
In October 2015, the City entered into a contract with Alfred Benesch & Company/Legat
Architects to complete the Phase II design engineering services for the final stage of this
Project. Based on the pre-final design cost estimates provided earlier this summer, and a
forecasted remaining grant balance of $285,781 in ITEP funds, staff realized there would be a
roughly $160,000 shortfall to fund all of the interior improvements that were desired. Therefore,
Page 2
the scope of work for the interior improvements will include the relocation and expansion of
restroom facilities in the general area of the tenant space on the south end of the building. Final
bid documents for this scope of work are in the process of being reviewed by IDOT and the
Federal Highway Administration (FHWA), and are planned to be posted in early February 2017,
with a bid letting date of March 10, 2017.
BUDGET/FISCAL IMPACT:
Similar to the recent exterior improvements that were completed, IDOT requires an engineer
that is certified in IDOT documentation to perform Phase III construction engineering for ITEP
funded projects. The City has received two proposals for the Phase III construction engineering
for this project; from firms that have personnel that are certified in IDOT documentation; and of
which are included below:
Firm Total Proposal Amount
Alfred Benesch & Company $71,419.10
GeWalt Hamilton Associates $64,799.33
Per section 9.0-K of the City’s purchasing directive, staff is requesting waiving the formal
request for proposal and evaluation process. With the Phase III construction engineering being
performed by GeWalt Hamilton during the previous stage of this project, they are very familiar
with the construction oversight and documentation that is required for this type of a project.
To this end, based on their experience and cost proposal, staff is requesting that City Council
Acknowledge the exception noted in Section 9.0 K of the City’s Purchasing Directive and
approve an agreement with GeWalt Hamilton Associates for the Phase III construction
engineering services for this project in the amount of $64,799.33.
As stated, the City will be required to pay the full expenditures for the work, and will receive
reimbursement for 80% of the authorized construction and phase III construction engineering
costs for this project. The current estimate for the construction and Phase III engineering is
$332,075. The current estimated City share (20%) share is $66,415. These amounts may
change depending on the actual bids received; so staff is requesting a 10% contingency to be
added bringing the approval amounts to $292,226 and $73,057.
Below is an estimated summary of the Project budget:
FY2017 Funding
Source Account Number
Amount
Budgeted
Amount
Requested
Budgeted?
Y/N
FY18 – Capital Fund 311-0060-419-77-17 $422,851 $365,283 Yes
Pursuant to the grant program cost share, the resolution certifies that the City has authorized
the expenditure of funds for its 20% contribution. The Local Agency Agreement for Federal
Participation is a standard agreement between the City and IDOT that stipulates the division of
cost (80/20) and general conditions for the use of federal grant funds.
City staff will be present at the November 14, 2016, Finance Committee meeting to answer any
questions. If modifications are requested, staff will revise for consideration at a future meeting.
Page 1 of 8 BLR 05611 (Rev. 11/21/13)
Printed on 11/23/2016 1:35:31 PM
Local Agency
City of Lake Forest
County
Lake
Section
11-00090-02-SM
Project No.
TE-01D1(024)
Job No.
C-91-070-16
Contact Name/Phone/E-mail Address
Robert Ells/847.810.3555
EllsR@cityoflakeforest.com
L
O
C
A
L
A
G
E
N
C
Y
Construction Engineering
Services Agreement
For
Federal Participation
C
O
N
S
U
L
T
A
N
T
Consultant
Gewalt Hamilton Associates, Inc.
Address
625 Forest Edge Drive
City
Vernon Hills
State
IL
Zip Code
60061
Contact Name/Phone/E-mail Address
Dan Strahan/847.821.6233
dstrahan@gha-engineers.com
THIS AGREEMENT is made and entered into this day of , between the above
Local Agency (LA) and Consultant (ENGINEER) and covers certain professional engineering services in connection with the PROJECT
described herein. Federal-aid funds allotted to the LA by the state of Illinois under the general supervision of the Illinois Department of
Transportation (STATE) will be used entirely or in part to finance engineering services as described under AGREEMENT PROVISIONS.
WHEREVER IN THIS AGREEMENT or attached exhibits the following terms are used, they shall be interpreted to mean:
Regional Engineer Deputy Director Division of Highways, Regional Engineer, Department of Transportation
Resident Construction Supervisor Authorized representative of the LA in immediate charge of the engineering details of the PROJECT
In Responsible Charge A full time LA employee authorized to administer inherently governmental PROJECT activities
Contractor Company or Companies to which the construction contract was awarded
Project Description
Name Lake Forest Metra Station UP North Line Route Length Structure No.
Termini
Description: Interior building renovation/restoration.
Agreement Provisions
I. THE ENGINEER AGREES,
1. To perform or be responsible for the performance of the engineering services for the LA, in connection with the PROJECT
hereinbefore described and checked below:
a.
b.
c.
d.
Proportion concrete according to applicable STATE Bureau of Materials and Physical Research (BMPR) Quality
Control/Quality Assurance (QC/QA) training documents or contract requirements and obtain samples and perform
testing as noted below.
Proportion hot mix asphalt according to applicable STATE BMPR QC/QA training documents and obtain samples
and perform testing as noted below.
For soils, to obtain samples and perform testing as noted below.
For aggregates, to obtain samples and perform testing as noted below.
NOTE: For 1a. through 1d. the ENGINEER is to obtain samples for testing according to the STATE BMPR “Project
Procedures Guide”, or as indicated in the specifications, or as attached herein by the LA; test according to the
STATE BMPR “Manual of Test Procedures for Materials”, submit STATE BMPR inspection reports; and verify
compliance with contract specifications.
Page 2 of 8 BLR 05611 (Rev. 11/21/13)
Printed on 11/23/2016 1:35:31 PM
e.
f.
g.
Inspection of all materials when inspection is not provided at the sources by the STATE BMPR, and submit
inspection reports to the LA and the STATE in accordance with the STATE BMPR “Project Procedures Guide” and
the policies of the STATE.
For Quality Assurance services, provide personnel who have completed the appropriate STATE BMPR QC/QA
trained technician classes.
Inspect, document and inform the LA employee In Responsible Charge of the adequacy of the establishment and
maintenance of the traffic control.
h.
i.
j.
k.
l.
m.
n.
Geometric control including all construction staking and construction layouts.
Quality control of the construction work in progress and the enforcement of the contract provisions in accordance with
the STATE Construction Manual.
Measurement and computation of pay items.
Maintain a daily record of the contractor’s activities throughout construction including sufficient information to permit
verification of the nature and cost of changes in plans and authorized extra work.
Preparation and submission to the LA by the required form and number of copies, all partial and final payment
estimates, change orders, records, documentation and reports required by the LA and the STATE.
Revision of contract drawings to reflect as built conditions.
Act as resident construction supervisor and coordinate with the LA employee In Responsible Charge.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Engineering services shall include all equipment, instruments, supplies, transportation and personnel required to perform the duties
of the ENGINEER in connection with the AGREEMENT.
To furnish the services as required herein within twenty-four hours of notification by the LA employee In Responsible Charge.
To attend meetings and visit the site of the work at any reasonable time when requested to do so by representatives of the LA or
STATE.
That none of the services to be furnished by the ENGINEER shall be sublet, assigned or transferred to any other party or parties
without the written consent of the LA. The consent to sublet, assign or otherwise transfer any portion of the services to be furnished
by the ENGINEER shall not be construed to relieve the ENGINEER of any responsibility for the fulfillment of this AGREEMENT.
The ENGINEER shall submit invoices, based on the ENGINEER’s progress reports, to the LA employee In Responsible Charge, no
more than once a month for partial payment on account for the ENGINEER’s work completed to date. Such invoices shall
represent the value, to the LA of the partially completed work, based on the sum of the actual costs incurred, plus a percentage
(equal to the percentage of the construction engineering completed) of the fixed fee for the fully completed work.
That the ENGINEER is qualified technically and is entirely conversant with the design standards and policies applicable to
improvement of the SECTION; and that the ENGINEER has sufficient properly trained, organized and experienced personnel to
perform the services enumerated herein.
That the ENGINEER shall be responsible for the accuracy of the ENGINEER’s work and correction of any errors, omissions or
ambiguities due to the ENGINEER’S negligence which may occur either during prosecution or after acceptance by the LA. Should
any damage to persons or property result from the ENGINEER’s error, omission or negligent act, the ENGINEER shall indemnify
the LA, the STATE and their employees from all accrued claims or liability and assume all restitution and repair costs arising from
such negligence. The ENGINEER shall give immediate attention to any remedial changes so there will be minimal delay to the
contractor and prepare such data as necessary to effectuate corrections, in consultation with and without further compensation from
the LA.
That the ENGINEER will comply with applicable federal statutes, state of Illinois statutes, and local laws or ordinances of the LA.
The undersigned certifies neither the ENGINEER nor I have:
a) employed or retained for commission, percentage, brokerage, contingent fee or other considerations, any firm or person (other
than a bona fide employee working solely for me or the above ENGINEER) to solicit or secure this AGREEMENT;
Page 3 of 8 BLR 05611 (Rev. 11/21/13)
Printed on 11/23/2016 1:35:31 PM
b) agreed, as an express or implied condition for obtaining this AGREEMENT, to employ or retain the services of any firm or
person in connection with carrying out the AGREEMENT or
c) paid, or agreed to pay any firm, organization or person (other than a bona fide employee working solely for me or the above
ENGINEER) any fee, contribution, donation or consideration of any kind for, or in connection with, procuring or carrying out
the AGREEMENT.
d) are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered
transactions by any Federal department or agency;
e) have not within a three-year period preceding the AGREEMENT been convicted of or had a civil judgment rendered against
them for commission of fraud or criminal offense in connection with obtaining, attempting to obtain or performing a public
(Federal, State or local) transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft,
forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property;
f)
g)
are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State or local) with
commission of any of the offenses enumerated in paragraph (e) of this certification; and
have not within a three-year period preceding this AGREEMENT had one or more public transactions (Federal, State or local)
terminated for cause or default.
11. To pay its subconsultants for satisfactory performance no later than 30 days from receipt of each payment from the LA.
12. To submit all invoices to the LA within one year of the completion of the work called for in this AGREEMENT or any subsequent
Amendment or Supplement.
13. To submit BLR 05613, Engineering Payment Report, to the STATE upon completion of the work called for in the AGREEMENT.
14. To be prequalified with the STATE in Construction Inspection when the ENGINEER or the ENGINEER’s assigned staff is named as
resident construction supervisor. The onsite resident construction supervisor shall have a valid Documentation of Contract
Quantities certification.
15.Will provide, as required, project inspectors that have a valid Documentation of Contract Quantities certification.
II. THE LA AGREES,
1. To furnish a full time LA employee to be In Responsible Charge authorized to administer inherently governmental PROJECT
activities.
2. To furnish the necessary plans and specifications.
3. To notify the ENGINEER at least 24 hours in advance of the need for personnel or services.
4. To pay the ENGINEER as compensation for all services rendered in accordance with this AGREEMENT, on the basis of the
following compensation formulas:
Cost Plus Fixed Fee
Formulas
FF = 14.5%[DL + R(DL) + OH(DL) + IHDC], or
FF = 14.5%[(2.3 + R)DL + IHDC]
Where: DL = Direct Labor
IHDC = In House Direct Costs
OH = Consultant Firm’s Actual Overhead Factor
R = Complexity Factor
FF=Fixed Fee
SBO = Services by Others
Total Compensation = DL +IHDC+OH+FF+SBO
Specific Rate (Pay per element)
Lump Sum
Page 4 of 8 BLR 05611 (Rev. 11/21/13)
Printed on 11/23/2016 1:35:31 PM
5. To pay the ENGINEER using one of the following methods as required by 49 CFR part 26 and 605 ILCS 5/5-409:
W ith Retainage
a)For the first 50% of completed work, and upon receipt of monthly invoices from the ENGINEER and the approval thereof by
the LA, monthly payments for the work performed shall be due and payable to the ENGINEER, such payments to be equal to
90% of the value of the partially completed work minus all previous partial payments made to the ENGINEER.
b)After 50% of the work is completed, and upon receipt of monthly invoices from the ENGINEER and the approval thereof by
the LA, monthly payments covering work performed shall be due and payable to the ENGINEER, such payments to be equal to
95% of the value of the partially completed work minus all previous partial payments made to the ENGINEER.
c)Final Payment – Upon approval of the work by the LA but not later than 60 days after the work is completed and reports have
been made and accepted by the LA and the STATE, a sum of money equal to the basic fee as determined in this
AGREEMENT less the total of the amounts of partial payments previously paid to the ENGINEER shall be due and payable to
the ENGINEER.
W ithout Retainage
a)For progressive payments – Upon receipt of monthly invoices from the ENGINEER and the approval thereof by the LA,
monthly payments for the work performed shall be due and payable to the ENGINEER, such payments to be equal to the value
of the partially completed work minus all previous partial payments made to the ENGINEER.
b)Final Payment – Upon approval of the work by the LA but not later than 60 days after the work is completed and reports have
been made and accepted by the LA and STATE, a sum of money equal to the basic fee as determined in this AGREEMENT
less the total of the amounts of partial payments previously paid to the ENGINEER shall be due and payable to the ENGINEER.
6. The recipient shall not discriminate on the basis on the basis of race, color, national origin or sex in the award and performance of
any DOT-assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26. The recipient shall
take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and administration of DOT-
assisted contracts. The recipient’s DBE program, as required by 49 CFR part 26 and as approved by DOT, is incorporated by
reference in this agreement. Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as
violation of this agreement. Upon notification to the recipient of its failure to carry out its approved program, the Department may
impose sanctions as provided for under part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C.
1001 and/or the Program Fraud Civil Remedies Act of 1986 (31U.S.C. 3801 et seq.).
7. To submit approved form BC 775 (Exhibit C) and BC 776 (Exhibit D) with this AGREEMENT.
III.It is Mutually Agreed,
1.
2.
3.
4.
That the ENGINEER and the ENGINEER’s subcontractors will maintain all books, documents, papers, accounting records and
other evidence pertaining to cost incurred and to make such materials available at their respective offices at all reasonable times
during the AGREEMENT period and for three years from the date of final payment under this AGREEMENT, for inspection by the
STATE, Federal Highway Administration or any authorized representatives of the federal government and copies thereof shall be
furnished if requested.
That all services are to be furnished as required by construction progress and as determined by the LA employee In Responsible
Charge. The ENGINEER shall complete all services specified herein within a time considered reasonable to the LA, after the
CONTRACTOR has completed the construction contract.
That all field notes, test records and reports shall be turned over to and become the property of the LA and that during the
performance of the engineering services herein provided for, the ENGINEER shall be responsible for any loss or damage to the
documents herein enumerated while they are in the ENGINEER’s possession and any such loss or damage shall be restored at the
ENGINEER’s expense.
That this AGREEMENT may be terminated by the LA upon written notice to the ENGINEER, at the ENGINEER’s last known
address, with the understanding that should the AGREEMENT be terminated by the LA, the ENGINEER shall be paid for any
services completed and any services partially completed. The percentage of the total services which have been rendered by the
ENGINEER shall be mutually agreed by the parties hereto. The fixed fee stipulated in numbered paragraph 4d of Section II shall be
multiplied by this percentage and added to the ENGINEER’s actual costs to obtain the earned value of work performed. All field
notes, test records and reports completed or partially completed at the time of termination shall become the property of, and be
delivered to, the LA.
5.
6.
That any differences between the ENGINEER and the LA concerning the interpretation of the provisions of this AGREEMENT shall
be referred to a committee of disinterested parties consisting of one member appointed by the ENGINEER, one member appointed
by the LA, and a third member appointed by the two other members for disposition and that the committee’s decision shall be final.
That in the event the engineering and inspection services to be furnished and performed by the LA (including personnel furnished
by the ENGINEER) shall, in the opinion of the STATE be incompetent or inadequate, the STATE shall have the right to supplement
the engineering and inspection force or to replace the engineers or inspectors employed on such work at the expense of the LA.
Page 5 of 8 BLR 05611 (Rev. 11/21/13)
Printed on 11/23/2016 1:35:31 PM
7. That the ENGINEER has not been retained or compensated to provide design and construction review services relating to the
contractor’s safety precautions, except as provided in numbered paragraph 1f of Section I.
8. This certification is required by the Drug Free Workplace Act (30ILCS 580). The Drug Free Workplace Act requires that no grantee
or contractor shall receive a grant or be considered for the purpose of being awarded a contract for the procurement of any property
or service from the State unless that grantee or contractor will provide a drug free workplace. False certification or violation of the
certification may result in sanctions including, but not limited to, suspension of contract or grant payments, termination of a contract
or grant and debarment of contracting or grant opportunities with the State for at least one (1) year but no more than five (5) years.
For the purpose of this certification, “grantee” or “contractor” means a corporation, partnership or other entity with twenty-five (25) or
more employees at the time of issuing the grant, or a department, division or other unit thereof, directly responsible for the specific
performance under a contract or grant of $5,000 or more from the State, as defined in the Act.
The contractor/grantee certifies and agrees that it will provide a drug free workplace by:
(a) Publishing a statement:
(1) Notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a
controlled substance, including cannabis, is prohibited in the grantee’s or contractor’s workplace.
(2) Specifying the actions that will be taken against employees for violations of such prohibition.
(3) Notifying the employee that, as a condition of employment on such contract or grant, the employee will:
(A) abide by the terms of the statement; and
(B) notify the employer of any criminal drug statute conviction for a violation occurring in the workplace
no later than five (5) days after such conviction.
(b) Establishing a drug free awareness program to inform employees about:
(1) the dangers of drug abuse in the workplace;
(2) the grantee’s or contractor’s policy of maintaining a drug free workplace;
(3) any available drug counseling, rehabilitation and employee assistance program; and
(4) the penalties that may be imposed upon an employee for drug violations.
(c) Providing a copy of the statement required by subparagraph (a) to each employee engaged in the performance
of the contract or grant and to post the statement in a prominent place in the workplace.
(d) Notifying the contracting or granting agency within ten (10) days after receiving notice under part (B) of
paragraph (3) of subsection (a) above from an employee or otherwise receiving actual notice of such conviction.
(e) Imposing a sanction on, or requiring the satisfactory participation in a drug abuse assistance or rehabilitation
program by, any employee who is convicted, as required by section S of the Drug Free Workplace Act.
(f) Assisting employees in selecting a course of action in the event drug counseling, treatment and rehabilitation is
required and indicating that a trained referral team is in place.
(g) Making a good faith effort to continue to maintain a drug free workplace through implementation of the Drug Free
Workplace Act.
9. The ENGINEER or subconsultant shall not discriminate on the basis of race, color, national origin or sex in the performance of this
AGREEMENT. The ENGINEER shall carry out applicable requirements of 49 CFR part 26 in the administration of DOT-assisted
contracts. Failure by the ENGINEER to carry out these requirements is a material breach of this AGREEMENT, which may result in
the termination this AGREEMENT or such other remedy as the LA deems appropriate.
Page 6 of 8 BLR 05611 (Rev. 11/21/13)
Printed on 11/23/2016 1:35:31 PM
Agreement Summary
Prime Consultant: TIN Number Agreement Amount
Gewalt Hamilton Associates, Inc. 36-3426053 $37,379.33
Sub-Consultants: TIN Number Agreement Amount
Landmark Development Company 36-4149581 $27,420.00
Sub-Consultant Total: $27,420.00
Prime Consultant Total: $37,379.33
Total for all Work: $64,799.33
Executed by the LA: City of Lake Forest
(Municipality/Township/County)
ATTEST:
By: By:
Clerk Title:
(SEAL)
Executed by the ENGINEER:
ATTEST:
By: By:
Title: Title:
L A K E F O R E S T
L A N D M A R K
D E V E L O P M E N T C O M P A N Y
A R C H I T E C T U R E C O N S T R U C T I O N D E V E L O P M E N T
2 7 2 E A S T D E E R P A T H L A K E F O R E S T , I L
T E L E P H O N E : 8 4 7 . 6 1 5 . 0 6 3 7 F A X : 8 4 7 . 6 1 5 . 9 1 1 6
Proposal for Construction Administration Services for Lake Forest Metra UP North Line Commuter Station
Page 1 of 2
PROJECT DESCRIPTION:
Proposal for Construction Administration Services
For The Lake Forest Metra UP North Line Commuter Station
Interior Renovations/ Restoration Project
LAKE FOREST, IL
November 21, 2016
Mr. Dan Strahan, P.E., CFM
Gewalt Hamilton Associates, Inc.
625 Forest Edge Drive
Vernon Hills, IL 60061
RE: Proposal for Construction Administration Services
Lake Forest Metra UP North Line Commuter Station
Stage III Interior Renovations
Section # 11-00090-02-SM
Project # TE-01D1(024)
Job No. D-91-070-16
Dear Dan;
Thank you for the opportunity to submit a proposal for Construction Administration Services for the Lake
Forest Metra UP North Line Commuter Station Interior Renovations/ Restoration Project . Based on our
meeting, we understand you are interested in the following scope of work:
SCOPE OF WORK
The Construction Documents were prepared for the City of Lake Forest by Legat Architects. It is our
understanding that the project will be funded through the Illinois Department of Transportation (IDOT) which
has specific procedural requirements. Gewalt Hamilton Associates Inc., (GHA) will be the project lead and will
be responsible for the performance of the engineering services for the City of Lake Forest in connection with
the Lake Forest Metra UP North Line Commuter Station Interior Renovations/ Restoration Project. Lake
Forest Landmark Development (LFLD) will be responsible for the technical aspects of the construction
administration services, while GHA will generally be responsible for the project management, documentation,
and coordination with IDOT.
Lake Forest Landmark Development’s services will include periodic on site observation of the work as well as
review and approval of shop drawings, material submittals, review and approval of mock ups, responses to
RFI’s, etc. In addition, we will attend weekly construction meetings on site. It is anticipated that the project
may take up to 16 weeks and our fee has been developed accordingly.
Based on the scope of services noted above and the personnel hour calculations attached below, we propose
billing on a time and material basis with an approximate total of $27,420 (Twenty Seven Thousand Four Hundred
L A K E F O R E S T
L A N D M A R K
D E V E L O P M E N T C O M P A N Y
A R C H I T E C T U R E C O N S T R U C T I O N D E V E L O P M E N T
2 7 2 E A S T D E E R P A T H L A K E F O R E S T , I L
T E L E P H O N E : 8 4 7 . 6 1 5 . 0 6 3 7 F A X : 8 4 7 . 6 1 5 . 9 1 1 6
Proposal for Construction Administration Services for Lake Forest Metra UP North Line Commuter Station
Page 2 of 2
Twenty Dollars). Should the scope of work exceed these assumptions or if the construction schedule is extended,
Lake Forest Landmark Development will request a modification to this agreement.
Lake Forest Landmark Development’s TIN is 36-4149581.
PROJECT FEES
NAME HOURS RATE FEE
Principal 150 $170.00/hour $25,500.00
Reimbursable
Expenses
16 wks. @ $120.00 $1,920.00
Total Fee $27,420.00
Other items of work not specifically addressed here shall be billed according to the current hourly rate. We
estimate about 8 hours of work per week with project duration of 16 weeks, plus time for review of initial
submittal and project coordination.
Reimbursable expenses incurred for the project are in addition to the basic compensation and additional services
and include expenses incurred by the Architect and employees in the interest of the Project, including but not
limited to reproduction (blueprints), CADD plotting, models, copies, postage, photos, transportation, fuel,
renderings or mock-ups. Reimbursable expenses will be billed without mark up for the amounts incurred by the
Architect directly to GHA.
We understand you have a very tight time frame to complete the work and will do our best to be available upon
request for meetings and site visits to expedite the process.
If you have any questions please feel free to contact me at 847/812-9907.
Respectfully submitted,
L A K E F O R E S T L A N D M A R K D E V E L O P M E N T C O M P A N Y
Kristine Boyaris, Principal
November 23, 2016 GHA Proposal No. 2016.CS112 Page 1 of 5
Exhibit A
City of Lake Forest
Phase III – Construction Engineering Services
Lake Forest Metra UP North Line Commuter Station
Interior Renovation/Restoration
Section #: 11-00090-02-SM
Project #: TE-01D1(024)
Job #: C-91-070-16
GHA Proposal No. 2016.CS112
City of Lake Forest (Client), 800 N. Field Drive, Lake Forest, IL 60045, and Gewalt Hamilton
Associates, Inc. (GHA), 625 Forest Edge Drive, Vernon Hills, IL 60061, agree and contract as follows:
I. Project Understanding
The City of Lake Forest proposes to complete interior renovation and restoration of the Metra UP
Commuter Station, located at 691 North Western Avenue. The scope of work will include interior
construction as needed to construct restroom facilities in accordance with plans prepared by Legat
Architects. GHA proposes to provide construction engineering services for this federally funded project.
Landmark Development Company will also provide construction engineering services as a subconsultant
to GHA.
II. Scope of Services
Our scope of services will include the following:
A. GHA will perform or be responsible for the performance of the engineering services for the City in
connection with the Lake Forest Metra UP North Line Commuter Station Exterior Restoration
project. Landmark Development Company will be responsible for the technical aspects of the
construction engineering services, while GHA will generally be responsible for project
management, documentation, and coordination with IDOT.
1. Landmark Development Company will provide periodic observation of materials installed by the
contractor. Landmark Development Company will review and approve shop drawings, diagrams,
illustrations, brochures, catalog data, schedules and samples, the results of tests and inspections,
and other data which the Contractor is required to submit to confirm compliance with the
Contract Documents.
2. GHA will inspect, document, and inform the City of the adequacy of the establishment and
maintenance of traffic control.
3. GHA services include measurement and computation of pay items and will process ICORs and
authorizations in accordance with IDOT standards.
4. GHA will maintain a daily record of the contractor’s activities throughout construction including
sufficient information to permit verification of the nature and cost of changes in plans and
authorized extra work. GHA will notify the City of any required change orders prior to
authorization.
5. GHA will conduct weekly progress meetings as necessary to review status and schedules.
Landmark Development Company will attend the weekly progress meetings.
6. GHA & Landmark Development Company will conduct a final inspection to determine if the
project has been completed in general accordance with the Contract Documents and the
Contractor has fulfilled obligations there under so that the Consultant may recommend, in
writing, final payment to the Contractor.
7. Upon substantial completion of the project, GHA will prepare a punch list in coordination with
Landmark Development Company.
November 23, 2016 GHA Proposal No. 2016.CS112 Page 2 of 5
III. Engineering Staff and Project Schedule
Mr. Daniel J. Strahan, P.E., CFM will function as the Project Manager for the project. Senior Engineer
Technician, Mr. Dave Marquardt will be performing the onsite construction coordination and
documentation. Other professional staff will assist with the project as needed.
This proposal is based on an estimated 16-week construction schedule.
IV. Compensation for Services
Based on the scope of services noted above and the man-hour calculations below, we propose billing on a
time and material basis with an approximate total of $64,799.33.
Should the scope of work exceed these assumptions or full-time Resident Engineering services are
required beyond the specified estimated construction schedule, GHA will request a modification to this
Agreement.
Reimbursable expenses such as printing, photos, travel, etc., shall be billed directly to the Client without
mark up. For budgeting purposes, we anticipate approximately $850.00 for reimbursable expenses, as
indicated above. No permit fees or review fees are included in this proposal.
Invoices will be submitted on a time and material basis and will detail services performed. Statements of
GHA charges made against a project are submitted to clients every four weeks. This allows the client to
review the status of the work in progress and the charges made. As part of the GHA statement, a separate
review of the Man-Hour Estimate within the original scope will be provided. Additional hours considered
to be outside the original scope of services will be identified. Should GHA determine that the original
Man-Hour Estimate is to be exceeded; a written modification to the proposal will be required.
V. General Conditions of this Agreement
The delineated services provided by Gewalt Hamilton Associates, Inc., (GHA) under this Agreement will
be performed as reasonably required in accordance with the generally accepted standards for civil
engineering and surveying services as reflected in the contract for this project at the time when and the
place where the services are performed.
Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in
favor of a third party against either the Client or GHA. GHA’s services under this Agreement are being
performed solely for the Client’s benefit, and no other party or entity shall have any claim against GHA
because of this Agreement or the performance or nonperformance of services hereunder. In no event shall
GHA be liable for any loss of profit or any consequential damages.
GHA shall not have control of and shall not be responsible for construction means, methods, techniques,
sequences or procedures, or for job site safety measures. Such control is the sole responsibility of the
Client’s contractor.
The Client and GHA agree that all disputes between them arising out of or relating to this Agreement or
the Project shall be submitted to nonbinding mediation in Chicago, Illinois unless the parties mutually
agree otherwise.
This Agreement, including all subparts and Attachment A, which is attached hereto and incorporated
herein as the General Provisions of this Agreement, constitute the entire integrated agreement between the
parties which may not be modified without all parties consenting thereto in writing.
Encl.: Attachment A
November 23, 2016 GHA Proposal No. 2016.CS112 Page 3 of 5
ATTACHMENT A TO GEWALT HAMILTON ASSOCIATES, INC.
PROFESSIONAL SERVICES AGREEMENT
The delineated services provided by Gewalt Hamilton Associates, Inc., (GHA) under this Agreement will be
performed as reasonably required in accordance with the generally accepted standards for civil engineering and
surveying services as reflected in the contract for this project at the time when and the place where the services are
performed.
The terms of this Agreement are subject to renegotiation if not accepted within 60 days of the date indicated on the
contract. Requests for extension beyond 60 days should be made in writing prior to the expiration date. The fees and
terms of the Agreement shall remain in full force and effect for one year from the date of acceptance of the Agreement,
and shall be subject to revision at that time, or any time thereafter, if GHA gives written notice to the other party at
least 60 days prior to the requested date of revision. In the event that the parties fail to agree on the new rates or other
revisions, either party may terminate this Agreement by giving the other party 10 days written notice.
Payments are due within (30) days after a statement is rendered. Fees not paid within 60 days of the end of the calendar
month in which the statement is rendered will bear interest at the rate of one percent (1.0%) per month until paid. The
provision for the payment of interest shall not be construed as authorization to make payments late. Failure of the
Client to make payments when due shall, at the option of GHA, be cause for suspension of services. Upon notification
by GHA of suspension of services, Client shall make payment of all outstanding invoices within seven days. Client’s
failure to make such payment to GHA shall constitute a material breach of the Agreement and shall be cause for
termination by GHA. GHA shall be entitled to reimbursement of all costs actually incurred by GHA in collecting
overdue accounts under this Agreement, including, without limitations, legal fees and costs.
The Client’s obligation to pay for the professional services provided is in no way dependent upon the Client’s ability
to obtain financing, rezoning, payment from a third party, approval of governmental or regulatory agencies or the
Client’s successful completion of the project.
The Client and GHA agree that any documents prepared by either party shall conform to the specifications listed in
the Engineering Agreement. Any electronic files submitted by GHA to the Client are submitted for an acceptance
period of 10 days. Any defects the Client discovers during this period will be reported to GHA and will be corrected
as part of GHA’s Basic Scope of Services. Corrections of defects detected and reported after the acceptance period
will be compensated for as Additional Services.
The Client acknowledges GHA’s plans and specifications, including field data, notes, calculations, and all documents
or data on electronic media, as instruments of professional service. The plans and specifications prepared under this
Agreement shall become the property of the Client upon completion of the services and payment in full of all monies
due to GHA. However, GHA shall retain ownership rights over all electronic data and documents.
The Client shall not reuse or make or permit to be made any modification to the plans, specifications, or electronic
data without the prior written authorization of GHA. The Client agrees to waive any claim against GHA arising from
any unauthorized reuse or modification of the plans and specifications or electronic data. The Client agrees, to the
fullest extent permitted by law, to defend and indemnify and hold GHA harmless from any damage, liability or cost,
including attorneys’ fees and costs, arising from any reuse or modification of the plans, specifications, or electronic
data by the Client or any person or entity which acquires or obtains the plans, specifications, or electronic data from
or through the Client.
The client is aware that differences may exist between the electronic files delivered and the printed plans and
specifications. In the event of a conflict between the signed and/or sealed printed plans and specifications prepared
by GHA and electronic files, the signed and/or sealed printed plans and specifications shall govern.
The Americans with Disabilities Act (ADA) provides that it is a violation of the ADA to design and construct a facility
for first occupancy later than January 26, 1993, that does not meet the accessibility and usability requirements of the
ADA except where an entity can demonstrate that it is structurally impractical to meet such requirements. The Client
acknowledges that the requirements of the ADA will be subject to various, and possibly contradictory interpretations.
GHA, therefore, will use reasonable professional efforts to interpret applicable ADA requirements and other federal,
state and local laws, rules, codes, ordinances, and regulations as they apply to the project. GHA, however cannot and
does not warrant or guarantee that the Client’s project will comply with interpretations of ADA requirements and/or
requirements of other federal, state and local laws, rules, codes, ordinances, and regulations as they apply to the
project.
November 23, 2016 GHA Proposal No. 2016.CS112 Page 4 of 5
If required by the contracted scope of services, GHA, shall prepare an opinion of probable construction costs, which
shall be submitted to the Client for review. Since GHA has no control over the cost of labor, materials, or equipment,
or over the contractor’s methods of determining prices, or over competitive bidding or market conditions, opinions of
probable costs, if called for by this Agreement as part of GHA’s scope, shall be made on the basis of experience and
qualifications applied to the program contemplated by the Agreement and information provided by Owner, and
represent a reasonable judgment as a design professional familiar with the construction industry. However, GHA
cannot and does not guarantee or warrant that proposals, bids, or the actual construction costs will not vary from
opinions of probable cost prepared for the Client. If the Client wishes greater assurance as to the construction cost,
Client agrees it will employ an independent cost estimator.
If required by the Scope of Services, GHA shall visit the project at defined intervals during construction to become
generally familiar with the progress and quality of the contractors’ work to determine if the work is proceeding in
general conformance with the Contract Documents.
Client agrees that GHA does not have control of and is not responsible for construction means, methods, techniques,
sequences or procedures, or for safety measures and programs including enforcement of Federal, State and County
safety requirements, in connection with construction work performed by the Client’s construction contractors. GHA
is not responsible for the supervision of Client’s construction contractors, subcontractors, materialmen, suppliers, or
any of their employees, agents and representatives of such contractors; or responsible for any machinery, construction
equipment, and tools used and employed by contractors and subcontractors in the project. GHA, Inc. has no authority
or right to stop the work. In no event shall GHA be liable for the acts or omissions of Client’s construction contractors,
subcontractors, materialmen or suppliers, or any persons or entities performing any of the construction work, or for
failure of any of them to carry out their work as called for by the Construction Documents.
Neither the professional activities of GHA, nor the presence of GHA or its employees and subconsultants (if any) at
a construction site, shall relieve the Contractor or any other entity of their obligations, duties and responsibilities
including but not limited to, construction means, methods, sequence, techniques, or procedures necessary for
performing, superintending or coordinating all portions of the Work in accordance with the Contract Documents and
any health or safety precautions required by any regulatory agencies or industry practice. GHA personnel have no
authority or right to exercise any control or direction over any construction contractor or other entity or their employees
in connection with their work or any health or safety precautions. The Client agrees that the Contractor is solely
responsible for jobsite safety, and warrants that this intent shall be included in the Client’s agreement with the
Contractor. The Client also agrees that the Client, GHA, and GHA’s personnel and consultants shall be
defended/indemnified by the Contractor for all claims asserted against GHA which arise out of the Contractor’s or its
subcontractors’ negligence, errors or omissions in their performance of their work, and shall also be named as an
additional insured under the Contractor(s)’s general liability insurance policy.
It is acknowledged by both parties that GHA’s scope of services does not include any services related to asbestos,
mold, fungus or any other hazardous or toxic materials, contaminants or pollutants. In the event that GHA, or any
other party encounters asbestos mold, fungus or any other hazardous or toxic materials, contaminants or pollutants at
the job site, or it should become known in any way that such materials may be present at the jobsite or any adjacent
areas that may affect the performance of GHA, GHA may, at its option and without liability for consequential or any
other damages, suspend performance of its services on the project until the Client retains appropriate specialist
consultants or contractors to identify, abate and/or remove the asbestos, mold, fungus or any other hazardous or toxic
materials, contaminants or pollutants and further warrant that the jobsite is in full compliance with applicable laws
and regulations.
If required by the scope of services, records drawings (or revised specifications) will be prepared, in part, on the basis
of information compiled and furnished by others, the accuracy of which GHA may reasonably rely upon, GHA will
not be responsible for any errors or omissions, which have been incorporated into this document due to information
furnished by others.
When preparing civil engineering or surveying plans and drawings, information on existing underground utilities or
soil conditions is provided from the best information available. This information may be obtained from visible surface
evidence, utility company records or soil borings, and is not represented to be the exact location of these utilities or
soils in the fields. Client agrees that GHA may reasonably rely on the accuracy of information furnished by third
parties. Contractor is solely responsible for exact utility locations. Client shall not hold GHA responsible for
Contractor’s error/omission in the utility locations. Client agrees GHA is not responsible for additional costs, which
result from utility conflicts or unforeseen conditions. If the Client wishes to obtain the services of a contractor to
provide test holes and exact utility locations, GHA, may incorporate that information into the design and reasonably
rely upon same. If not included in the scope of services, such work will be compensated as additional services.
November 23, 2016 GHA Proposal No. 2016.CS112 Page 5 of 5
The Client agrees to limit GHA’s professional liability to the Client and to all construction contractors, or
subcontractors on the project arising from GHA, Inc.’s alleged negligent acts, errors, or omissions, such that the total
aggregate liability of GHA, Inc. to all those named shall not exceed $50,000 or GHA’s total fee for the services
rendered on this project, whichever is greater. GHA, Inc. makes no warranties, either expressed or implied, including
any warranty of habitability, merchantability or fitness for any particular purpose. In no event shall GHA be liable
for any loss of profit or any consequential damages.
All claims, disputes, controversies or matters in question arising out of or relating to this Agreement or any breach
thereof, including but not limited to disputes arising out of alleged design defects, breaches of contract, errors,
omissions, or acts of professional negligence (collectively “disputes”) shall be submitted to mediation before and as a
condition precedent to any other remedy. Upon written request by either party to this Agreement for mediation of any
dispute, the Client and GHA shall select by mutual agreement a neutral mediator. Such selection shall be made within
ten (10) calendar days of the date of receipt by the other party of the written request for mediation. In the event of
failure to reach such agreement or in any instance when the selected mediator is unable or unwilling to serve and a
replacement mediator cannot be agreed upon by Client or GHA within ten (10) calendar days, a mediator shall be
chosen as specified in the Construction Industry Mediation Rules of the American Arbitration Association then in
effect. Mediation shall take place in Chicago, Illinois unless the Client and GHA agree otherwise. The fees of the
mediator(s) and costs incurred by the mediator(s) shall be apportioned equally between the parties.
Either the Client or GHA may terminate this Agreement without penalty at any time with or without cause upon giving
the other party ten (10) calendar days prior written notice. The Client shall, within thirty (30) calendar days of
termination pay GHA for all services rendered and all costs incurred up to the date of termination, in accordance with
compensation provisions to this Agreement. The Client shall also reimburse GHA termination expenses, including,
but not limited to, those associated with demobilization, reassignment of personnel and space and equipment costs.
Client shall not assign this Agreement without GHA’s written consent.
Exhibit B
COST ESTIMATE OF CONSULTANT SERVICES
FIRM Gewalt Hamilton Associates DATE
PTB OVERHEAD RATE 1.7
PRIME/SUPPLEMENT Prime COMPLEXITY FACTOR 0
DBE OVERHEAD IN-HOUSE Outside SERVICES
DROP ITEM MANHOURS PAYROLL &DIRECT FIXED Direct BY DBE TOTAL
BOX FRINGE BENF COSTS FEE Costs OTHERS TOTAL
(A)(B)( C )(D)(E)(F)(G)(H)(B-G)
Project Coordination & Documentation 40 1,736.20 2,951.54 679.72 5,367.46
Construction Observation & Documentation 320 10,354.80 17,603.16 4,053.90 32,011.86
Subconsultant DL 0.00 0.00
TOTALS 360 12,091.00 20,554.70 0.00 4,733.63 0.00 0.00 0.00 37,379.33
DBE
COST PLUS FIXED FEE
PREPARED BY THE AGREEMENTS UNIT Printed 11/23/2016 1:34 PM
Exhibit C
City of Lake Forest
Phase III – Construction Engineering Services
Lake Forest Metra UP North Line Commuter Station
Interior Renovation/Restoration
Section #: 11-00090-02-SM
Project #: TE-01D1(024)
Job #: C-91-070-16
GHA Proposal No. 2016.CS112
Direct Cost Estimate
Estimated Expenses:
Printing Expenses Estimated at: = $250.00
Vehicle Expense Estimated at:
1200 miles at $0.50/mile = $600.00
Direct Cost Estimate Total = $850.00
Construction Documents 0
Full Size Plans - 23 sheets x 4 sets x 6sf/sheet x $0.25/sf $138
Half Size Plans - 23 sheets x 4 sets x 2sf/sheet x$0.25/sf $46
Misc. Shipping Costs $66
Printed 12/30/2016 Page 1 of 5 BLR 05310 (Rev. 09/03/15)
Local Public Agency
City of Lake Forest
State Contract Day Labor Local Contract
X
RR Force Account
Local Public Agency Agreement
for Federal Participation
Section
11-00090-02-SM
Fund Type
ITEP
ITEP, SRTS, or HSIP Number(s)
120122
Construction Engineering Right-of-Way
Job Number Project Number Job Number Project Number Job Number Project Number
C-91-070-16 TE-01D1(025)
This Agreement is made and entered into between the above local public agency, hereinafter referred to as the “LPA”, and the State of
Illinois, acting by and through its Department of Transportation, hereinafter referred to as “STATE”. The STATE and LPA jointly
propose to improve the designated location as described below. The improvement shall be constructed in accordance with plans
prepared by, or on behalf of the LPA, approved by the STATE and the STATE’s policies and procedures approved and/or required by
the Federal Highway Administration, hereinafter referred to as “FHWA”.
Location
Local Name Metra UP North Line Commuter Station Route n/a Length n/a
Termini Metra UP North Line
Current Jurisdiction LPA TIP Number 10-11-0019 Existing Structure No n/a
Project Description
Stage III renovation of the interior of the Lake Forest Metra Commuter Station, UP North LIne
Division of Cost
Type of Work ITEP % % LPA % Total
Participating Construction 226,247 ( * ) ( ) 432,843 ( BAL ) 659,090
Non-Participating Construction ( ) ( ) ( )
Preliminary Engineering ( ) ( ) ( )
Construction Engineering 24,431 ( * ) ( ) 40,368 ( BAL ) 64,799
Right of Way ( ) ( ) ( )
Railroads ( ) ( ) ( )
Utilities ( ) ( ) ( )
Materials
TOTAL $ 250,678 $ $ 473,211 $ 723,889
*Maximum FHWA (ITEP) participation 80% not to exceed $250,678.00.
NOTE:
The costs shown in the Division of Cost table are approximate and subject to change. The final LPA share is dependent on the final Federal
and State participation. The actual costs will be used in the final division of cost for billing and reimbursment.
If funding is not a percentage of the total, place an asterisk in the space provided for the percentage and explain above.
Local Public Agency Appropriation
By execution of this Agreement, the LPA attests that sufficient moneys have been appropriated or reserved by resolution or ordinance
to fund the LPA share of project costs. A copy of the authorizing resolution or ordinance is attached as an addendum (required for
State-let contracts only)
Method of Financing (State Contract Work Only)
METHOD A---Lump Sum (80% of LPA Obligation)
METHOD B--- Monthly Payments of due by the of each successive month.
METHOD C---LPA’s Share Balance divided by estimated total cost multiplied by actual progress payment.
(See page two for details of the above methods and the financing of Day Labor and Local Contracts)
Printed 12/30/2016 Page 2 of 5 BLR 05310 (Rev. 09/03/15)
Agreement Provisions
THE LPA AGREES:
(1) To acquire in its name, or in the name of the STATE if on the STATE highway system, all right-of-way necessary for this project in
accordance with the requirements of Titles II and III of the Uniform Relocation Assistance and Real Property Acquisition Policies Act
of 1970, and established State policies and procedures. Prior to advertising for bids, the LPA shall certify to the STATE that all
requirements of Titles II and III of said Uniform Act have been satisfied. The disposition of encroachments, if any, will be
cooperatively determined by representatives of the LPA, and the STATE and the FHWA, if required.
(2) To provide for all utility adjustments, and to regulate the use of the right-of-way of this improvement by utilities, public and private, in
accordance with the current Utility Accommodation Policy for Local Agency Highway and Street Systems.
(3) To provide for surveys and the preparation of plans for the proposed improvement and engineering supervision during construction
of the proposed improvement.
(4) To retain jurisdiction of the completed improvement unless specified otherwise by addendum (addendum should be accompanied
by a location map). If the improvement location is currently under road district jurisdiction, an addendum is required.
(5) To maintain or cause to be maintained, in a manner satisfactory to the STATE and the FHWA, the completed improvement, or that
portion of the completed improvement within its jurisdiction as established by addendum referred to in item 4 above.
(6) To comply with all applicable Executive Orders and Federal Highway Acts pursuant to the Equal Employment Opportunity and
Nondiscrimination Regulations required by the U.S. Department of Transportation.
(7) To maintain, for a minimum of 3 years after final project close-out by the STATE, adequate books, records and supporting
documents to verify the amounts, recipients and uses of all disbursements of funds passing in conjunction with the contract; the
contract and all books, records and supporting documents related to the contract shall be available for review and audit by the
Auditor General and the department; and the LPA agrees to cooperate fully with any audit conducted by the Auditor General and
the STATE; and to provide full access to all relevant materials. Failure to maintain the books, records and supporting documents
required by this section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under
the contract for which adequate books, records and supporting documentation are not available to support their purported
disbursement.
(8) To provide if required, for the improvement of any railroad-highway grade crossing and rail crossing protection within the limits of
the proposed improvement.
(9) To comply with Federal requirements or possibly lose (partial or total) Federal participation as determined by the FHWA.
(10) (State Contracts Only) That the method of payment designated on page one will be as follows:
Method A - Lump Sum Payment. Upon award of the contract for this improvement, the LPA will pay to the STATE within thirty
(30) calendar days of billing, in lump sum, an amount equal to 80% of the LPA’s estimated obligation incurred under
this Agreement. The LPA will pay to the STATE the remainder of the LPA’s obligation (including any nonparticipating
costs) within thirty (30) calendar days of billing in a lump sum, upon completion of the project based on final costs.
Method B - Monthly Payments. Upon award of the contract for this improvement, the LPA will pay to the STATE, a specified
amount each month for an estimated period of months, or until 80% of the LPA’s estimated obligation under the
provisions of the Agreement has been paid, and will pay to the STATE the remainder of the LPA’s obligation
(including any nonparticipating costs) in a lump sum, upon completion of the project based upon final costs.
Method C - Progress Payments. Upon receipt of the contractor’s first and subseque nt progressive bills for this improvement, the
LPA will pay to the STATE within thirty (30) calendar days of receipt, an amount equal to the LPA’s share of the
construction cost divided by the estimated total cost, multiplied by the actual payment (appropriately adjusted for
nonparticipating costs) made to the contractor until the entire obligation incurred under this Agreement has been paid.
Failure to remit the payment(s) in a timely manner as required under Methods A, B, or C, shall allow the STATE to internally offset,
reduce, or deduct the arrearage from any payment or reimbursement due or about to become due and payable from the STATE to
LPA on this or any other contract. The STATE, at its sole option, upon notice to the LPA, may place the debt into the Illinois
Comptroller’s Offset System (15 ILCS 405/10.05) or take such other and further action as my be required to recover the debt.
(11) (Local Contracts or Day Labor) To provide or cause to be provided all of the initial funding, equipment, labor, material and services
necessary to construct the complete project.
(12) (Preliminary Engineering) In the event that right-of-way acquisition for, or actual construction of, the project for which this
preliminary engineering is undertaken with Federal participation is not started by the close of the tenth fiscal year following the fiscal
year in which the project is federally authorized, the LPA will repay the STATE any Federal funds received under the terms of this
Agreement.
(13) (Right-of-Way Acquisition) In the event that the actual construction of the project on this right-of-way is not undertaken by the close
of the twentieth fiscal year following the fiscal year in which the project is federally authorized, the LPA will repay the STATE any
Federal Funds received under the terms of this Agreement.
Printed 12/30/2016 Page 3 of 5 BLR 05310 (Rev. 09/03/15)
(14) (Railroad Related Work Only) The estimates and general layout plans for at-grade crossing improvements should be forwarded to
the Rail Safety and Project Engineer, Room 204, Illinois Department of Transportation, 2300 South Dirksen Parkway, Springfield,
Illinois, 62764. Approval of the estimates and general layout plans should be obtained prior to the commencem ent of railroad
related work. All railroad related work is also subject to approval be the Illinois Commerce Commission (ICC). Final inspection for
railroad related work should be coordinated through appropriate IDOT District Bureau of Local Roads and Streets office.
Plans and preemption times for signal related work that will be interconnected with traffic signals shall be submitted to the ICC for
review and approval prior to the commencement of work. Signal related work involving interconnects with state maintained tra ffic
signals should also be coordinated with the IDOT’s District Bureau of Operations.
The LPA is responsible for the payment of the railroad related expenses in accordance with the LPA/railroad agreement prior to
requesting reimbursement from IDOT. Requests for reimbursement should be sent to the appropriate IDOT District Bureau of Local
Roads and Streets office.
Engineer’s Payment Estimates shall be in accordance with the Division of Cost on page one.
(15) And certifies to the best of its knowledge and belief its officials:
(a) are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered
transactions by any Federal department or agency;
(b) have not within a three-year period preceding this Agreement been convicted of or had a civil judgment rendered agains t them
for commission of fraud or a criminal offense in connection with obtaining, attem pting to obtain, or performing a public (Federal,
State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes o r commission of
embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements receiving stolen prop erty;
(c) are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, local) with
commission of any of the offenses enumerated in item (b) of this certification; and
(d) have not within a three-year period preceding the Agreement had one or more public transact ions (Federal, State, local)
terminated for cause or default.
(16) To include the certifications, listed in item 15 above, and all other certifications required by State statutes, in every contract,
including procurement of materials and leases of equipment.
(17) (State Contracts) That execution of this agreement constitutes the LPA’s concurrence in the award of the construction contract to
the responsible low bidder as determined by the STATE.
(18) That for agreements exceeding $100,000 in federal funds, execution of this Agreement constitutes the LPA’s certification that:
(a) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing
or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress or
any employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any
cooperative agreement, and the extension, continuation, renewal, amendment or modifica tion of any Federal contract, grant,
loan or cooperative agreement;
(b) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to
influence an officer or employee of any agency, a Member of Congress, an officer or emplo yee of Congress or an employee of
a Member of Congress, in connection with this Federal contract, grant, loan or cooperative agreement, the undersigned shall
complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying”, in accordance with its instructions;
(c) The LPA shall require that the language of this certification be included in the award documents for all subawards at all ties
(including subcontracts, subgrants and contracts under grants, loans and cooperative ag reements) and that all subrecipients
shall certify and disclose accordingly.
(19) To regulate parking and traffic in accordance with the approved project report.
(20) To regulate encroachments on public right-of-way in accordance with current Illinois Compiled Statutes.
(21) To regulate the discharge of sanitary sewage into any storm water drainage system constructed with this improvement in
accordance with current Illinois Compiled Statutes.
(22) To complete this phase of the project within three (3) years from the date this agreement is approved by the STATE if this portion of
the project described in the Project Description does not exceed $1,000,000 (five years if the project costs exceed $1,000,00 0).
(23) To comply with the federal Financial Integrity Review and Evaluation (FIRE) program, which requires States and subrecipients to
justify continued federal funding on inactive projects. 23 CFR 630.106(a)(5) defines an inactive project as a project which no
expenditures have been charged against Federal funds for the past twelve (12) months.
To keep projects active, invoicing must occur a minimum of one time within any given twelve (12) month period. However, to
ensure adequate processing time, the first invoice shall be submitted to the STATE within six (6) months of the federal authorization
date. Subsequent invoices will be submitted in intervals not to exceed six (6) months.
(24) The LPA will submit supporting documentation with each request for reimbursement from the STATE. Supporting documentation is
defined as verification of payment, certified time sheets or summaries, vendor invoices, vendor receipts, cost plus fix fee invoice,
progress report, and personnel and direct cost summaries.and other documentation supporting the requested reimbursement
amount (Form BLRS 05621 should be used for consultant invoicing purposes). LPA invoice requests to the STATE will be
submitted with sequential invoice numbers by project.
Printed 12/30/2016 Page 4 of 5 BLR 05310 (Rev. 09/03/15)
The LPA will submit to the STATE a complete and detailed final invoice with applicable supporting documentation of all incurred
costs, less previous payments, no later than twelve (12) months from the date of completion of this phase of the improvement or
from the date of the previous invoice, which ever occurs first. If a final invoice is not received within this time frame, the most recent
invoice may be considered the final invoice and the obligation of the funds closed.
(25) The LPA shall provide the final report to the appropriate STATE district within twelve months of the physical completion date of the
project so that the report may be audited and approved for payment. If the deadline cannot be met, a written explanation must be
provided to the district prior to the end of the twelve months documenting the reason and the new anticipated date of completion. If
the extended deadline is not met, this process must be repeated until the project is closed. Failure to follow this process may result
in the immediate close-out of the project and loss of further funding.
(26) (Single Audit Requirements) That if the LPA expends $750,000 or more a year in federal financial assistance they shall have an
audit made in accordance with 2 CFR 200. LPAs expending less than $750,000 a year shall be exempt from compliance. A copy
of the audit report must be submitted to the STATE (Office of Finance and Administration, Audit Coordination Section, 2300 South
Dirksen Parkway, Springfield, Illinois, 62764), within 30 days after the completion of the audit, but no later than one year after the
end of the LPA’s fiscal year. The CFDA number for all highway planning and construction activities is 20.205.
Federal funds utilized for constructon activities on projects l et and awarded by the STATE (denoted by an “X” in the State Contract
field at the top of page 1) are not included in a LPA’s calculation of federal funds expended by the LPA for Single Audit purposes.
(27) That the LPA is required to register with the System for Award Management or SAM (formerly Central Contractor Registration
(CCR)), which is a web-enabled government-wide application that collects, validates, stores, and disseminates business information
about the federal government’s trading partners in support of the contract award and the electronic payment processes. To register
or renew, please use the following website: https://www.sam.gov/portal/public/SAM/#1.
The LPA is also required to obtain a Dun & Bradstreet (D&B) D-U-N-S Number. This is a unique nine digit number required to
identify subrecipients of federal funding. A D-U-N-S number can be obtained at the following website:
http://fedgov.dnb.com/webform.
THE STATE AGREES:
(1) To provide such guidance, assistance and supervision and to monitor and perform audits to the extent necessary to assure validity
of the LPA’s certification of compliance with Titles II and III requirements.
(2) (State Contracts) To receive bids for the construction of the proposed improvement when the p lans have been approved by the
STATE (and FHWA, if required) and to award a contract for construction of the proposed improvement, after receipt of a
satisfactory bid.
(3) (Day Labor) To authorize the LPA to proceed with the construction of the improvement when Agreed Unit Prices are approved, and
to reimburse the LPA for that portion of the cost payable from Federal and/or State funds based on the Agreed Unit Prices and
Engineer’s Payment Estimates in accordance with the Division of Cost on page one.
(4) (Local Contracts) For agreements with Federal and/or State funds in engineering, right-of-way, utility work and/or construction
work:
(a) To reimburse the LPA for the Federal and/or State share on the basis of periodic billings, provided said billings contain
sufficient cost information and show evidence of payment by the LPA;
(b) To provide independent assurance sampling, to furnish off-site material inspection and testing at sources normally visited by
STATE inspectors of steel, cement, aggregate, structural steel and other materials customarily tested by the STATE.
IT IS MUTUALLY AGREED:
(1) Construction of the project will utilize domestic steel as required by Section 106.01 of the current edition of the Standard
Specifications for Road and Bridge Construction and federal Buy America provisions.
(2) That this Agreement and the covenants contained herein shall become null and void in the event that the FHWA does not approve
the proposed improvement for Federal-aid participation within one (1) year of the date of execution of this Agreement.
(3) This Agreement shall be binding upon the parties, their successors and assigns.
(4) For contracts awarded by the LPA, the LPA shall not discriminate on the basis of race, color, national origin or sex in the award and
performance of any USDOT – assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26.
The LPA shall take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and
administration of USDOT – assisted contracts. The LPA’s DBE program, as required by 49 CFR part 26 and as approved by
USDOT, is incorporated by reference in this Agreement. Upon notification to the recipient of its failure to carry out its approved
program, the STATE may impose sanctions as provided for under part 26 and may, in appropriate cases, refer the matter for
Printed 12/30/2016 Page 5 of 5 BLR 05310 (Rev. 09/03/15)
enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31U.S.C. 3801 et seq.). In the absence
of a USDOT – approved LPA DBE Program or on State awarded contracts, this Agreement shall be administered under the
provisions of the STATE’s USDOT approved Disadvantaged Business Enterprise Program.
(5) In cases where the STATE is reimbursing the LPA, obligations of the STATE shall cease immediately without penalty or further
payment being required if, in any fiscal year, the Illinois General Assembly or applicable Federal Funding source fails to appropriate
or otherwise make available funds for the work contemplated herein.
(6) All projects for the construction of fixed works which are financed in whole or in part with funds provided by this Agreement and/or
amendment shall be subject to the Prevailing Wage Act (820 ILCS 130/0.01 et seq.) unless the provisions of that Act exempt its
application.
ADDENDA
Additional information and/or stipulations are hereby attached and identified below as being a part of this Agreement.
Number 1- Location Map, Number 2 – LPA Appropriation Resolution
(Insert Addendum numbers and titles as applicable)
The LPA further agrees, as a condition of payment, that it accepts and will comply with the applicable provisions set forth in this Agreement
and all Addenda indicated above.
APPROVED APPROVED
Local Public Agency State of Illinois
Department of Transportation
Donald P. Schoenheider
Name of Official (Print or Type Name) Randall S. Blankenhorn, Secretary Date
Mayor By:
Title (County Board Chairperson/Mayor/Village President/etc.) Aaron A. Weatherholt, Deputy Director of Highways Date
Omer Osman, Director of Highways/Chief Engineer Date
(Signature) Date
The above signature certifies the agency’s TIN number is William M. Barnes, Chief Counsel Date
36-6005960 conducting business as a Governmental
Entity.
DUNS Number 070160429 Jeff Heck, Chief Fiscal Officer (CFO) Date
NOTE: If the LPA signature is by an APPOINTED official, a resolution authorizing said appointed official to execute this
agreement is required.
City of Lake Forest
Location: Lake Forest Metra Station UP North Line
Section No.: 11-00090-02-SM
Project No.: TE-01D1(025)
Job No.: C91-070-16
Lake County
R E S O L U T I O N
WHEREAS, The City of Lake Forest of is attempting to improve the existing East Side
Metra Train Depot; and
WHEREAS, the cost of said improvement has necessitated the use of federal funds; and
WHEREAS, the federal fund source requires a match of local match; and
NOW THEREFORE, BE IT RESOLVED by THE CITY of LAKE FOREST authorized
Three Hundred Sixty-Five Thousand Two Hundred Eighty Three dollars, ($265,283.00), or as
much may be needed to match federal funds in the completion of Section Number 11-00090-02-
SM.
BE IT FURTHER RESOLVED that the MAYOR and CITY MANAGER be and are
hereby authorized and directed to execute the LOCAL AGENCY AGREEMENTS and any other
such documents related to advancement and completion of said project; and
BE IT FURTHER RESOLVED that the Clerk is hereby directed to transmit three
certified copies of this resolution to the Illinois Department of Transportation through the
Division of Transportation and one certified copy to the CITY through the Office of the City
Engineer.
Enacted and approved this 17th day of JANUARY , 2017 , at The City of Lake
Forest, Illinois.
Mayor
ATTEST:
City Clerk